Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-08063
Well Classification: CBM Status: PR - 1/1/2025
Well Name/No:GOLDEN EAGLE #21-15X
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/1/2025
FacilityID:272317LocationID:308453
County:LAS ANIMAS #071Location:SWSE 21 33S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7261 ft.
Basin:RATON BASIN  
Planned Location:763FSL  1382 FELLat/Long: 37.152492 / -104.888170Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.152730 / -104.888440Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/19/2011
End Date: 7/19/2011
Reported: 4/16/2012
Prior to rule 205A.b.(2)(A)
Days to report: 272
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 1/1/2025             Measured TD: 1980 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 1/1/2025
Wellbore Permit
Permit #:20040957 Expiration Date:5/19/2005
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:2/26/2005
Spud Date:6/7/2004Spud Date Is:ACTUAL
Measured TD:1980 ft.Measured PB depth:1916 ft.
True Vertical TD:True Vertical PB depth:
Log Types:AIL / TLD / CSN / CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: , Depth: 215 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 122, Top: 0 ft., Bottom: 215 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 1948 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 363, Top: 0 ft., Bottom: 1948 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1274 ft.NN
VERMEJO COAL1329 ft.1748 ft.NN
TRINIDAD1748 ft.1966 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 11/5/2004                 Interval Top: 1416 ft.    Interval Bottom: 1718 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:N/AChoke Size: 
Formation Name:VERMEJO COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/26/2005
Treatment Summary:A.W/2000 GALS 15% HCL ACID.FRAC'D W/164658 GALS 20# DELTA 140 W/SANDWEDGE NT CARRYING 67630# 16/30 & 149956# 12/20 SD.
Tubing Size:2.875 in.Tubing Setting Depth:1801 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/5/2004Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:
Test TypeMeasure
BBLS_H2O 128
CASING_PRESS 43
TUBING_PRESS 6
Perforation Data:
Interval Top:1416 ft.# Of Holes:48
Interval Bottom:1718 ft.Hole Size:0.4 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 1/1/2025                  Interval Top: 518 ft.    Interval Bottom: 1720 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:8/6/2011Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.875 in.Tubing Setting Depth:1804 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/8/2011Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 139
BTU_GAS 1009
CALC_BBLS_H2O 139
CALC_MCF_GAS 12
CASING_PRESS 12
MCF_GAS 12
TUBING_PRESS 3
Perforation Data:
Interval Top:518 ft.# Of Holes:93
Interval Bottom:1720 ft.Hole Size:0.42 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 8/26/2011                 Interval Top: 518 ft.    Interval Bottom: 1216 ft.

 Completed Information for Formation RATON COAL
1st Production Date:8/6/2011Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/19/2011
Treatment Summary:Acidized w/2,000 gals 15% HCl acid. Frac'd w/96,398 gals 20# Delta 140 w/Sandwedge OS carrying 200,925# 16/30 Nebraska sd.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:518 ft.# Of Holes:45
Interval Bottom:1216 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)3815
GOR
GOR DeterminationMCFE
Average BOE per Day1.801
Average MCFE per Day10.443

 Federal Financial Assurance  i 

 Tribal Well  i No