|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 1/1/2025 Measured TD: 1980 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 1/1/2025 | | Wellbore Permit | | | Permit #: | 20040957 | Expiration Date: | 5/19/2005 | | Proposed Depth/Form: | 2800 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 2/26/2005 | | Spud Date: | 6/7/2004 | Spud Date Is: | ACTUAL | | Measured TD: | 1980 ft. | Measured PB depth: | 1916 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | AIL / TLD / CSN / CBL | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: , Depth: 215 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 122, Top: 0 ft., Bottom: 215 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 1948 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 363, Top: 0 ft., Bottom: 1948 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | 1274 ft. | N | N | | VERMEJO COAL | 1329 ft. | 1748 ft. | N | N | | TRINIDAD | 1748 ft. | 1966 ft. | N | N |
Formation VRMJ Formation Classification: GW Status: CM - 11/5/2004 Interval Top: 1416 ft. Interval Bottom: 1718 ft.| Completed Information for Formation VERMEJO COAL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | VERMEJO COAL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/26/2005 | | Treatment Summary: | A.W/2000 GALS 15% HCL ACID.FRAC'D W/164658 GALS 20# DELTA 140 W/SANDWEDGE NT CARRYING 67630# 16/30 & 149956# 12/20 SD. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1801 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/5/2004 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 128 | | CASING_PRESS | 43 | | TUBING_PRESS | 6 |
| | Perforation Data: | | Interval Top: | 1416 ft. | # Of Holes: | 48 | | Interval Bottom: | 1718 ft. | Hole Size: | 0.4 in. |
|
Formation RT-VJ Formation Classification: GW Status: PR - 1/1/2025 Interval Top: 518 ft. Interval Bottom: 1720 ft.| Completed Information for Formation RATON-VERMEJO COALS | | 1st Production Date: | 8/6/2011 | Choke Size: | | | Formation Name: | RATON-VERMEJO COALS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1804 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/8/2011 | Test Method: | Pumping | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 139 | | BTU_GAS | 1009 | | CALC_BBLS_H2O | 139 | | CALC_MCF_GAS | 12 | | CASING_PRESS | 12 | | MCF_GAS | 12 | | TUBING_PRESS | 3 |
| | Perforation Data: | | Interval Top: | 518 ft. | # Of Holes: | 93 | | Interval Bottom: | 1720 ft. | Hole Size: | 0.42 in. |
|
Formation RTON Formation Classification: GW Status: CM - 8/26/2011 Interval Top: 518 ft. Interval Bottom: 1216 ft.| Completed Information for Formation RATON COAL | | 1st Production Date: | 8/6/2011 | Choke Size: | | | Formation Name: | RATON COAL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/19/2011 | | Treatment Summary: | Acidized w/2,000 gals 15% HCl acid. Frac'd w/96,398 gals 20# Delta 140 w/Sandwedge OS carrying 200,925# 16/30 Nebraska sd. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation RTON. |
| | Perforation Data: | | Interval Top: | 518 ft. | # Of Holes: | 45 | | Interval Bottom: | 1216 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 3815 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 1.801 |
| Average MCFE per Day | 10.443 |
| Federal Financial Assurance | i | |
|
|