Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-08062
Well Classification: CBM Status: PR - 8/28/2009
Well Name/No:HILL RANCH #32-8
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/28/2009
FacilityID:272343LocationID:308452
County:LAS ANIMAS #071Location:SENE 32 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8083 ft.
Planned Location:2174FNL  402 FELLat/Long: 37.042054 / -104.903549Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.042030 / -104.903580Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 8/28/2009             Measured TD: 2660 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 8/28/2009
Wellbore Permit
Permit #:20040920 Expiration Date:5/20/2005
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:9/28/2004
Spud Date:6/21/2004Spud Date Is:ACTUAL
Measured TD:2660 ft.Measured PB depth:2588 ft.
True Vertical TD:True Vertical PB depth:
Log Types:AIL / TLD / CSN & GR / CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: , Depth: 224 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 129, Top: 0 ft., Bottom: 224 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 2622 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 710, Top: 1054 ft., Bottom: 2622 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: 1035 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1993 ft.NN
VERMEJO COAL2072 ft.2391 ft.NN
TRINIDAD2391 ft.2631 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 12/14/2010                Interval Top: 2073 ft.    Interval Bottom: 2370 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:9/28/2007Choke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/13/2009
Treatment Summary:ACIDIZED W/ 3,400 GALS 15% HI ACID. REFRAC'D W/ 78,627 GALS 20# DELTA 140 W/ SANDWEDGE OS CARRYING 7,533# 16/30 BRADY SAND & 158,960# 12/20/BRADY SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 118
CALC_BBLS_H2O 118
CALC_MCF_GAS 4
CASING_PRESS 70
MCF_GAS 4
TUBING_PRESS 5
Perforation Data:
Interval Top:2073 ft.# Of Holes:
Interval Bottom:2370 ft.Hole Size:

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 8/28/2009                 Interval Top: 523 ft.    Interval Bottom: 2370 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:8/26/2009Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/28/2004
Treatment Summary:
Tubing Size:2.875 in.Tubing Setting Depth:2482 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/28/2009Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 107
BTU_GAS 1007
CALC_BBLS_H2O 107
CALC_BBLS_OIL 0
CALC_MCF_GAS 25
CASING_PRESS 65
MCF_GAS 25
TUBING_PRESS 4
Perforation Data:
Interval Top:523 ft.# Of Holes:
Interval Bottom:2370 ft.Hole Size:

Formation RTON                     Formation Classification:  GW                     Status:  CM - 5/13/2010                 Interval Top: 523 ft.    Interval Bottom: 1506 ft.

 Completed Information for Formation RATON COAL
1st Production Date:8/26/2009Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/14/2009
Treatment Summary:ACIDIZED W/ 4,500 GALS 15% HCI ACID. FRAC'D W/ 189,936 GALS 20# DELTA 140 SANDWEDGE OS CARRYING 27,731# 16/30 BRADY SAND & 389,181# 12/20 BRADY SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:523 ft.# Of Holes:87
Interval Bottom:1506 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)48524
GOR
GOR DeterminationMCFE
Average BOE per Day22.910
Average MCFE per Day132.912

 Federal Financial Assurance  i 

 Tribal Well  i No