Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-08062
Well Classification: CBM Status: PR - 8/28/2009
Well Name/No:HILL RANCH #32-8
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/28/2009
FacilityID:272343LocationID:308452
County:LAS ANIMAS #071Location:SENE 32 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8083 ft.
Basin:RATON BASIN  
Planned Location:2174FNL  402 FELLat/Long: 37.042054 / -104.903549Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.042030 / -104.903580Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 8/28/2009             Measured TD: 2660 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 8/28/2009
Wellbore Permit
Permit #:20040920 Expiration Date:5/20/2005
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:9/28/2004
Spud Date:6/21/2004Spud Date Is:ACTUAL
Measured TD:2660 ft.Measured PB depth:2588 ft.
True Vertical TD:True Vertical PB depth:
Log Types:AIL / TLD / CSN & GR / CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: , Depth: 224 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 129, Top: 0 ft., Bottom: 224 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 2622 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 710, Top: 1054 ft., Bottom: 2622 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: 1035 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1993 ft.NN
VERMEJO COAL2072 ft.2391 ft.NN
TRINIDAD2391 ft.2631 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 12/14/2010                Interval Top: 2073 ft.    Interval Bottom: 2370 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:9/28/2007Choke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/13/2009
Treatment Summary:ACIDIZED W/ 3,400 GALS 15% HI ACID. REFRAC'D W/ 78,627 GALS 20# DELTA 140 W/ SANDWEDGE OS CARRYING 7,533# 16/30 BRADY SAND & 158,960# 12/20/BRADY SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 118
CALC_BBLS_H2O 118
CALC_MCF_GAS 4
CASING_PRESS 70
MCF_GAS 4
TUBING_PRESS 5
Perforation Data:
Interval Top:2073 ft.# Of Holes:
Interval Bottom:2370 ft.Hole Size:

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 8/28/2009                 Interval Top: 523 ft.    Interval Bottom: 2370 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:8/26/2009Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/28/2004
Treatment Summary:
Tubing Size:2.875 in.Tubing Setting Depth:2482 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/28/2009Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 107
BTU_GAS 1007
CALC_BBLS_H2O 107
CALC_BBLS_OIL 0
CALC_MCF_GAS 25
CASING_PRESS 65
MCF_GAS 25
TUBING_PRESS 4
Perforation Data:
Interval Top:523 ft.# Of Holes:
Interval Bottom:2370 ft.Hole Size:

Formation RTON                     Formation Classification:  GW                     Status:  CM - 5/13/2010                 Interval Top: 523 ft.    Interval Bottom: 1506 ft.

 Completed Information for Formation RATON COAL
1st Production Date:8/26/2009Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/14/2009
Treatment Summary:ACIDIZED W/ 4,500 GALS 15% HCI ACID. FRAC'D W/ 189,936 GALS 20# DELTA 140 SANDWEDGE OS CARRYING 27,731# 16/30 BRADY SAND & 389,181# 12/20 BRADY SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:523 ft.# Of Holes:87
Interval Bottom:1506 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)47202
GOR
GOR DeterminationMCFE
Average BOE per Day22.302
Average MCFE per Day129.338

 Federal Financial Assurance  i 

 Tribal Well  i No