Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-08052
Well Classification: CBM Status: PR - 5/6/2020
Well Name/No:GOLDEN EAGLE #20-07
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/6/2020
FacilityID:272123LocationID:308442
County:LAS ANIMAS #071Location:SWNE 20 33S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7565 ft.
Basin:RATON BASIN  
Planned Location:1410FNL  1314 FELLat/Long: 37.161182 / -104.906580Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.161324 / -104.906271Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 5/6/2020             Measured TD: 2400 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 5/6/2020
Wellbore Permit
Permit #:20040885 Expiration Date:4/29/2005
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:10/29/2004
Spud Date:5/19/2004Spud Date Is:ACTUAL
Measured TD:2400 ft.Measured PB depth:2346 ft.
True Vertical TD:True Vertical PB depth:
Log Types:AIL/TLD/CSN & GR/CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: , Depth: 557 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 0 ft., Bottom: 557 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 2380 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 364, Top: 0 ft., Bottom: 2380 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1600 ft.NN
VERMEJO COAL1672 ft.2097 ft.NN
TRINIDAD2097 ft.2391 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 4/29/2020                 Interval Top: 1748 ft.    Interval Bottom: 2076 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:N/AChoke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/29/2004
Treatment Summary:SEE SCANNED DOC #01260032
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 204
BBLS_OIL 0
CALC_BBLS_H2O 204
CASING_PRESS 5
MCF_GAS 0
TUBING_PRESS 44
Perforation Data:
Interval Top:1748 ft.# Of Holes:58
Interval Bottom:2076 ft.Hole Size:0.4 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 5/6/2020                  Interval Top: 626 ft.    Interval Bottom: 2076 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:10/8/2018Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RT-VJ.
Perforation Data:
Interval Top:626 ft.# Of Holes:148
Interval Bottom:2076 ft.Hole Size:0.4 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 10/22/2018                Interval Top: 626 ft.    Interval Bottom: 965 ft.

 Completed Information for Formation RATON COAL
1st Production Date:N/AChoke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/14/2018Treatment End Date:10/7/2018
Treatment Summary:Perforate Raton Coal intervals with 3 SPF and 120 degree phasing listed by stage and fraced Raton Coal intervals including Stage 1 - 962' - 65', 892' - 94' and 875' - 83', Stage 2 - 848' - 51', 809' - 14', 772' - 73' and 765' - 68', Stage 3 - 650' - 53' and 626' - 28' (30' net or 90 holes). A total of 76,440 gallons of produced water with 66,990 gallons of x-link and 99,140 lbs of 16/30 sand were pumped. All three stages were pumped according to design. The ECWS #28 rigged down and moved to next location. Well was cleaned out to PBTD and returned to production as a commingled Raton Vermejo well.
Total fluid used in treatment (bbls):3415Max pressure during treatment (psi):2383
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:3
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.57
Recycled water used in treatment (bbls):3415Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):0Disposition method For flowback:
Total proppant used (lbs):99140Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/22/2018Test Method:Flowing
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 35
BTU_GAS 996
CALC_BBLS_H2O 35
CALC_MCF_GAS 81
CASING_PRESS 11
MCF_GAS 81
Perforation Data:
Interval Top:626 ft.# Of Holes:90
Interval Bottom:965 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)6483
GOR
GOR DeterminationMCFE
Average BOE per Day3.060
Average MCFE per Day17.760

 Federal Financial Assurance  i 

 Tribal Well  i No