Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-08051
Well Classification: CBM Status: PR - 8/18/2011
Well Name/No:GOLDEN EAGLE #17-14
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/18/2011
FacilityID:272124LocationID:308441
County:LAS ANIMAS #071Location:SESW 17 33S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7521 ft.
Basin:RATON BASIN  
Planned Location:452FSL  2138 FWLLat/Long: 37.166322 / -104.913031Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.166560 / -104.912800Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/6/2011
End Date: 8/6/2011
Reported: 4/16/2012
Prior to rule 205A.b.(2)(A)
Days to report: 254
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 8/18/2011             Measured TD: 2400 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 8/18/2011
Wellbore Permit
Permit #:20040886 Expiration Date:4/29/2005
Proposed Depth/Form:2490 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:2/14/2005
Spud Date:12/5/2004Spud Date Is:ACTUAL
Measured TD:2400 ft.Measured PB depth:2353 ft.
True Vertical TD:True Vertical PB depth:
Log Types:GR/CBL/AIL/GR/TLD/CSN/CAL/TEMP LOG
Casing:String Type: SURF, Hole Size: 15 in., Size: 8.625 in., Top: , Depth: 752 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 304, Top: 0 ft., Bottom: 752 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 2372 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 370, Top: 0 ft., Bottom: 2372 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1588 ft.NN
VERMEJO COAL1652 ft.2079 ft.NN
TRINIDAD2079 ft.2388 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 7/1/2011                  Interval Top: 1674 ft.    Interval Bottom: 2063 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:N/AChoke Size: 
Formation Name:VERMEJO COALCommingled:No
Production Method:PUMPING
Open Hole Completion:No
Formation Treatment
Treatment Date:2/14/2005
Treatment Summary:ACIDIZED W/500 GALS 15% HCI ACID. FRAC'D W/59,004 GALS 20# DELTA 140 W/SANDWEDGE NT CARRYING 16,900# 16/30 & 94,300# 12/20 SAND. ACIDIZED W/500 GALS 15% HCI ACID. FRAC'D W/46,837 GALS 20# DELTA 140 W/SANDWEDGE NT CARRYING 13,600# 16/30 & 53,403# 12/20SAND
Tubing Size:2.375 in.Tubing Setting Depth:2182 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/16/2005Test Method:PUMPING
Hours Tested:7Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 127
CALC_BBLS_H2O 435
CALC_MCF_GAS 10
CASING_PRESS 42
MCF_GAS 3
Perforation Data:
Interval Top:1674 ft.# Of Holes:68
Interval Bottom:2063 ft.Hole Size:0.4 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 8/18/2011                 Interval Top: 770 ft.    Interval Bottom: 2064 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:8/17/2011Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.875 in.Tubing Setting Depth:2190 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/18/2011Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 99
BTU_GAS 995
CALC_BBLS_H2O 99
CALC_MCF_GAS 78
CASING_PRESS 30
MCF_GAS 78
TUBING_PRESS 2
Perforation Data:
Interval Top:770 ft.# Of Holes:101
Interval Bottom:2064 ft.Hole Size:0.42 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 10/10/2011                Interval Top: 770 ft.    Interval Bottom: 924 ft.

 Completed Information for Formation RATON COAL
1st Production Date:8/17/2011Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/6/2011
Treatment Summary:Acidized w/1,000 gals 15% HCl acid. Frac'd w/40,193 gals 20# Delta 140 w/Sandwedge OS carrying 125,801# 16/30 Nebraska sd.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:770 ft.# Of Holes:33
Interval Bottom:924 ft.Hole Size:0.42 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)3227
GOR
GOR DeterminationMCFE
Average BOE per Day1.520
Average MCFE per Day8.840

 Federal Financial Assurance  i 

 Tribal Well  i No