|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 1/1/2025 Measured TD: 2450 ft. Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 1/1/2025 | Wellbore Permit | | Permit #: | 20040884 | Expiration Date: | 4/29/2005 | Proposed Depth/Form: | 2800 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | STATE | Unit: | | Unit Number: | | Formation And Spacing: | Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 7/12/2004 | Spud Date: | 7/9/2004 | Spud Date Is: | ACTUAL | Measured TD: | 2450 ft. | Measured PB depth: | 2318 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | AIL,TLD/CSN,TEMP LOG,CBL | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: , Depth: 568 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 254, Top: 0 ft., Bottom: 568 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 2371 ft., Weight: 15.5 , Citings Type: ACTUAL | Cement: | Sacks: 390, Top: 0 ft., Bottom: 2371 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | RATON COAL | 0 ft. | 1719 ft. | N | N | VERMEJO COAL | 1828 ft. | 2186 ft. | N | N | TRINIDAD | 2186 ft. | 2389 ft. | N | N |
Formation VRMJ Formation Classification: GW Status: CM - 9/2/2004 Interval Top: 1888 ft. Interval Bottom: 2165 ft. Completed Information for Formation VERMEJO COAL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | VERMEJO COAL | Commingled: | No | Production Method: | 22T-250 PC PMP | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/12/2004 | Treatment Summary: | PERFS: 2,164-65' (4 SPF, 4 HOLES), 2,128-30' (8 HOLES), 2,115-17' (8 HOLES) FRAC'D 1ST STAGE W/55,857 GALS 20# DELTA 140 W/SANDWEDGE NT CARRYING 24,500# 16/30 & 63,000# 12/20 BRADY SD. PERFS: 2,074-76' (4 SPF, 8 HOLES), 2,115-17' (8 HOLES), (CONT). |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2233 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/2/2004 | Test Method: | ORIFICE METER | Hours Tested: | 24 | Gas Type: | COAL GAS | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 26 | CALC_BBLS_H2O | 26 | CALC_MCF_GAS | 44 | CASING_PRESS | 5 | MCF_GAS | 44 |
| Perforation Data: | Interval Top: | 1888 ft. | # Of Holes: | 40 | Interval Bottom: | 2165 ft. | Hole Size: | 0.46 in. |
|
Formation RTON Formation Classification: GW Status: CM - 3/30/2006 Interval Top: 733 ft. Interval Bottom: 1129 ft. Completed Information for Formation RATON COAL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | RATON COAL | Commingled: | No | Production Method: | 22T-250 PC PMP | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/12/2004 | Treatment Summary: | PERFS: 1,127-29' (4 SPF, 8 HOLES), 1,084-87' (12 HOLES) FRAC'D 3RD STAGE W/36,664 GALS 20# DELTA 140 W/SANDWEDGE NT CARRYING 14,500# 16/30 & 42,000# 12/20 BRADY SD. PERFS: 1,016-18' (4 SPF, 8 HOLES), 979-81' (8 HOLES), 935-36' (4 HOLES), 906-07' (CONT) |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2233 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/2/2004 | Test Method: | ORIFICE METER | Hours Tested: | 24 | Gas Type: | COAL GAS | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 46 | CALC_BBLS_H2O | 46 | CALC_MCF_GAS | 44 | CASING_PRESS | 5 | MCF_GAS | 44 |
| Perforation Data: | Interval Top: | 733 ft. | # Of Holes: | 64 | Interval Bottom: | 1129 ft. | Hole Size: | 0.46 in. |
|
Formation RT-VJ Formation Classification: GW Status: PR - 1/1/2025 Completed Information for Formation RATON-VERMEJO COALS | 1st Production Date: | 9/2/2004 | Choke Size: | | Formation Name: | RATON-VERMEJO COALS | Commingled: | Yes | Production Method: | ORIFICE METER | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation RT-VJ. |
| No Perforation Data was found for formation RT-VJ. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | Y | Production Period 05/2024 - 04/2025 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 833 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.396 |
Average MCFE per Day | 2.308 |
Federal Financial Assurance | i | |
|
|