|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 6/1/2024 Measured TD: 1800 ft. Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 6/1/2024 | Wellbore Permit | | Permit #: | 20040195 | Expiration Date: | 2/17/2005 | Proposed Depth/Form: | 1900 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | STATE | Unit: | | Unit Number: | | Formation And Spacing: | Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 7/10/2004 | Spud Date: | 3/18/2004 | Spud Date Is: | ACTUAL | Measured TD: | 1800 ft. | Measured PB depth: | 1782 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | EPITHERMAN NEU.,LITHO-DENSITY, CEMENT BOND, FRAC GR, CAL-CMT VOL. | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: , Depth: 203 ft., Weight: 23 , Citings Type: ACTUAL | Cement: | Sacks: 122, Top: 0 ft., Bottom: 203 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 1781 ft., Weight: 15.5 , Citings Type: ACTUAL | Cement: | Sacks: 370, Top: 0 ft., Bottom: 370 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | RATON COAL | 0 ft. | 1138 ft. | N | N | VERMEJO COAL | 1138 ft. | 1558 ft. | N | N | TRINIDAD | 1558 ft. | 1800 ft. | N | N |
Formation RT-VJ Formation Classification: GW Status: PR - 6/1/2024 Interval Top: 298 ft. Interval Bottom: 1536 ft. Completed Information for Formation RATON-VERMEJO COALS | 1st Production Date: | 9/1/2004 | Choke Size: | | Formation Name: | RATON-VERMEJO COALS | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 8/4/2018 | Treatment End Date: | 9/19/2018 | Treatment Summary: | Perforate Raton Coal intervals with 3 SPF and 120 degree phasing listed by stage and fraced Raton Coal intervals including Stage 1 - 1047' - 50' and 1027' - 32', Stage 2 - 447' - 50' and 362' - 70', Stage 3 - 304' - 06' and 298' - 302' (25' net or 75 holes). A total of 88,200 gallons of produced water with 73,920 gallons of x-link and 83,590 lbs of 16/30 sand were pumped. All three stages were pumped according to design.
The ECWS #28 rigged down and moved to next location. Well was cleaned out to PBTD and returned to production as a commingled Raton Vermejo well. | Total fluid used in treatment (bbls): | 3860 | Max pressure during treatment (psi): | 2150 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 3 | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.62 | Recycled water used in treatment (bbls): | 3860 | Total flowback volume recovered (bbls): | 0 | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | | Total proppant used (lbs): | 83590 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: | Formation Treatment | Treatment Date: | 7/10/2004 | Treatment Summary: | PERFORATIONS;1531'-36' (4 SPF-20 HOLES) FRAC 1ST STAGE; FRAC W/62,111 GALS DELTA 140,28,600 16/30 66,000# 12/20 BRADY SAND. PERFORATIONS; 1473'-78' (4 SPF-20 HOLES) FRAC 2ND STAGE; FRAC W/48,609 GALS DELTA 140,22,000# 16/30 & 42,500# 12/20 BRADY SAND, |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/23/2018 | Test Method: | Pumping | Hours Tested: | 24 | Gas Type: | COAL GAS | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 101 | BBLS_OIL | 0 | BTU_GAS | 991 | CALC_BBLS_H2O | 101 | CALC_BBLS_OIL | 0 | CALC_MCF_GAS | 130 | CASING_PRESS | 2 | MCF_GAS | 130 | TUBING_PRESS | 1 |
| Perforation Data: | Interval Top: | 298 ft. | # Of Holes: | 135 | Interval Bottom: | 1536 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 22622 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 10.685 |
Average MCFE per Day | 61.977 |
Federal Financial Assurance | i | |
|
|