Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07961
Well Classification: CBM Status: SI - 6/1/2023
Well Name/No:APACHE CANYON #3-01
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date6/1/2023
FacilityID:270839LocationID:308390
County:LAS ANIMAS #071Location:NENE 3 34S68W 6
Field:PURGATOIRE RIVER - #70830Elevation:7927 ft.
Planned Location:1075FNL  526 FELLat/Long: 37.117323 / -104.975732Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.117310 / -104.975730Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/12/2018
End Date: 1/12/2018
Reported: 1/26/2018
Days to report: 14
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: SI - 6/1/2023             Measured TD: 1947 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        SI - 6/1/2023
Wellbore Permit
Permit #:20032530 Expiration Date:1/12/2005
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:3/18/2004
Spud Date:2/5/2004Spud Date Is:ACTUAL
Measured TD:1947 ft.Measured PB depth:1805 ft.
True Vertical TD:True Vertical PB depth:
Log Types:TRIPLE LITHO DETECTOR DENSITY, ARRAY INDUCTION, CEMENT BOND (1)
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 320 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 130, Top: 0 ft., Bottom: 320 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 1945 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 255, Top: 56 ft., Bottom: 1945 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1280 ft.NN
RATON SAND1280 ft.1402 ft.NN
VERMEJO COAL1402 ft.1716 ft.NN
TRINIDAD1716 ft.1823 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 1/1/2018                  Interval Top: 1437 ft.    Interval Bottom: 1696 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:N/AChoke Size: 
Formation Name:VERMEJO COALCommingled:No
Production Method:30N095PC PUMP
Open Hole Completion:No
Formation Treatment
Treatment Date:3/18/2004
Treatment Summary:PERFORATIONS: 1694'-96' (HYDRAJET CUTS, 4 HPF-8 HOLES) FRAC 1ST STAGE: FRAC W/ 775 SKS 16/30 SAND, 4,527 GALS LINEAR GEL, 250 GAL 15% HCL. PERFORATIONS: 1658'-60' (HYDRAJET CUTS, 4 HPF-8 HOLES) FRAC 2ND STAGE: FRAC W/ 45 SKS 16/30 SAND, 3,812 GALS LINEAR GEL, 250 GAL 15% HCL. PERFORATIONS: 1590'-92' (HYDRAJET CUTS, 4 HPF-8 HOLES) FRAC 3RD STAGE: FRAC W/ 786 SKS 16/30 SAND, 4,147 GALS LINEAR GEL, 250 GAL 15% HCL. PERFORATIONS: 1507'-09' (HYDRAJET CUTS, 4 HPF-8 HOLES) FRAC 4TH STAGE: FRAC W/ 309 SKS 16/30 SAND, 4,221 GALS LINEAR GEL, 250 GAL 15% HCL. PERFORATIONS: 1493'-95' (HYDRAJET CUTS, 4 HPF-8 HOLES) FRAC 5TH STAGE: FRAC W/ 284 SKS 16/30 SAND, 4,151 GALS LINEAR GEL, 250 GAL 15% HCL. PERFORATIONS: 1437'-39' (HYDRAJET CUTS, 4 HPF-8 HOLES) FRAC 6TH STAGE: FRAC W/ 284 SKS 16/30 SAND, 4,189 GAL LINEAR GEL, 250 GAL 15% HCL.
Tubing Size:2.875 in.Tubing Setting Depth:1713 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/28/2004Test Method:FLOW
Hours Tested:0Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 101
BBLS_OIL 0
BTU_GAS 0
CALC_BBLS_H2O 101
CALC_BBLS_OIL 0
CALC_MCF_GAS 0
CASING_PRESS 0
MCF_GAS 0
TUBING_PRESS 4
Perforation Data:
Interval Top:1437 ft.# Of Holes:48
Interval Bottom:1696 ft.Hole Size:0.51 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  SI - 6/1/2023                  Interval Top: 495 ft.    Interval Bottom: 1708 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:N/AChoke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/12/2018Treatment End Date:1/12/2018
Treatment Summary:Perforated five Vermejo Coal intervals with 4 SPF and 120 degree phasing and fraced the five Vermejo Coal intervals including Stage 1 - 1,688' - 92', 1,694' - 97' and 1,704' - 08', Stage 2 - 1,652' - 62', Stage 3 - 1,576' - 85', 1,590' - 94' and 1,597' - 00', Stage 4 - 1,492' - 96' and 1,506' - 10' and Stage 5 - 1,437' - 42', 1,450' - 56' and 1,460' - 64' (net 60' or 240 holes) with Coil Tubing Unit, 2-7/8" coiled tubing to isolate stages and a 70/30 Quality foam frac. A total of 250 gallons of 15% HCl, 179,159 gallons of produced water, 87,025 lbs of 20/40 mesh Premium White Sand and 950,730 scf N2 were pumped. Stage 2 went to flush with backside pressure at 100 psig. Stage 3 was cut with pressure increasing with 1 ppg sand concentration downhole. Perforated one Raton Coal interval with 4 SPF and 120 degree phasing and fraced the Raton Coal interval including Stage 6 - 495' - 500' and 525' - 28' (net - 8' or 32 holos) with Coiled Tubing Unit, 2-7/8" coiled tubing to isolate stages and a 70/30 Quality foam frac. A total of 250 gallons of 15% HCl, 43,377 gallons of produced water, 44,210 lbs of 20/40 Premium White Sand and 130,831 scf N2 were pumped. Stage 6 was pumped to completion according to prognosis. Two Raton Coal intervals were originally perforated including 468' - 71' and 456' - 59' (6' net or 24 holes) that were decided to be to shallow to frac. The CTU rigged down and moved to next location. Well was cleaned out to PBTD and returned to production as a commingled Raton-Vermejo well.
Total fluid used in treatment (bbls):5309Max pressure during treatment (psi):3691
Total gas used in treatment (mcf):1081561Fluid density (lbs/gal):8.35
Type Of gas:NITROGENNumber Of staged intervals:6
Total acid used in treatment (bbls):11Min frac gradient (psi/ft):0.50
Recycled water used in treatment (bbls):5298Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):131238Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.875 in.Tubing Setting Depth:1750 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/20/2018Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 147
BTU_GAS 941
CALC_BBLS_H2O 147
CASING_PRESS 4
TUBING_PRESS 5
Perforation Data:
Interval Top:495 ft.# Of Holes:296
Interval Bottom:1708 ft.Hole Size:0.45 in.
Primary Well Designation:
Defined Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
05/31/2023
Low ProducingYProduction Period
04/2024 - 03/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
April 2024 - March 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No