Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07958
Well Classification: GW Status: SI - 3/1/2025
Well Name/No:APACHE CANYON #14-7
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date3/1/2025
FacilityID:270800LocationID:308387
County:LAS ANIMAS #071Location:SWNE 14 34S68W 6
Field:PURGATOIRE RIVER - #70830Elevation:8377 ft.
Planned Location:2051FNL  1352 FELLat/Long: 37.085753 / -104.960411Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.085800 / -104.960310Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 3/1/2025             Measured TD: 2251 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 3/1/2025
Wellbore Permit
Permit #:20032532 Expiration Date:1/7/2005
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:3/1/2004
Spud Date:2/1/2004Spud Date Is:ACTUAL
Measured TD:2251 ft.Measured PB depth:2219 ft.
True Vertical TD:True Vertical PB depth:
Log Types:TRIPLE LITHO DETECTOR DENSITY, ARRAY INDUCTION, CEMENT BOND (4)
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 319 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 130, Top: 0 ft., Bottom: 319 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2216 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 899, Top: 1708 ft., Bottom: 2216 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 1708 ft., Bottom: 2216 ft., Determination Method: CALC
Casing:String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 1400 ft., Bottom: 1708 ft., Determination Method: CBL
Casing:String Type: S.C. 2.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 405 ft., Bottom: 1400 ft., Determination Method: CBL
Casing:String Type: S.C. 2.2, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 405 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 0 ft., Depth: 721 ft., Bottom: 740 ft., Sacks: 600, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1660 ft.NN
RATON SAND1660 ft.1719 ft.NN
VERMEJO COAL1719 ft.2050 ft.NN
TRINIDAD2050 ft.2237 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 10/2/2012                 Interval Top: 1785 ft.    Interval Bottom: 2011 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:N/AChoke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/3/2012Treatment End Date:N/A
Treatment Summary:No treatment done to this Zone. Correction to number of holes and top perforation.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:3/1/2004
Treatment Summary:PERFORATIONS: 2003'-11' (4 SPF - 32 HOLES) FRAC 1ST STAGE: TREAT W/ 34,384# 16/30 SAND, 18,708 GALS 40# LINEAR GEL, 500 GAL 15% HCL. PERFORATIONS: 1770'-1834' (4 SPF - 26 HOLES) FRAC 2ND STAGE: TREATED W/ 67,306# 16/30 SAND, 31,653 GALS 40# LINEAR GEL, 800 GAL 15% HCL.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 79
BBLS_OIL 0
CALC_BBLS_H2O 79
CALC_BBLS_OIL 0
CALC_MCF_GAS 62
CASING_PRESS 16
MCF_GAS 62
TUBING_PRESS 1
Perforation Data:
Interval Top:1785 ft.# Of Holes:68
Interval Bottom:2011 ft.Hole Size:0.46 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  SI - 3/1/2025                  Interval Top: 800 ft.    Interval Bottom: 2011 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:7/23/2006Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/22/2012Treatment End Date:8/31/2012
Treatment Summary:Remedial Cement Zone Isolation
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:2134 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RT-VJ.
Perforation Data:
Interval Top:800 ft.# Of Holes:139
Interval Bottom:2011 ft.Hole Size:

Formation RTON                     Formation Classification:  GW                     Status:  CM - 10/2/2012                 Interval Top: 800 ft.    Interval Bottom: 1709 ft.

 Completed Information for Formation RATON COAL
1st Production Date:7/23/2006Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/22/2012Treatment End Date:8/31/2012
Treatment Summary:Remedial O2 Zone Isolation
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:7/14/2006
Treatment Summary:ACIDIZED W/2700 GALS 15% HCL ACID. FRAC W/234,032 GALS 20# DELTA 140 W/SANDWEDGE NT CARRYING 24,400# 16/30 AND 421328# 12/20 SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 61
BBLS_OIL 0
BTU_GAS 993
CALC_BBLS_H2O 61
CALC_BBLS_OIL 0
CALC_MCF_GAS 0
CASING_PRESS 4
GRAVITY_OIL 1
MCF_GAS 0
TUBING_PRESS 3
Perforation Data:
Interval Top:800 ft.# Of Holes:71
Interval Bottom:1709 ft.Hole Size:0.46 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2028
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)17650
GOR
GOR DeterminationMCFE
Average BOE per Day8.344
Average MCFE per Day48.384

 Federal Financial Assurance  i 

 Tribal Well  i No