Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07957
Well Classification: CBM Status: PR - 8/1/2021
Well Name/No:NEW ELK #35-11
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/1/2021
FacilityID:270802LocationID:308386
County:LAS ANIMAS #071Location:NESW 35 33S68W 6
Field:PURGATOIRE RIVER - #70830Elevation:7756 ft.
Planned Location:1776FSL  1929 FWLLat/Long: 37.125202 / -104.967322Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.125220 / -104.967310Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 8/1/2021             Measured TD: 1800 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 8/1/2021
Wellbore Permit
Permit #:20032528 Expiration Date:1/7/2005
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:4/12/2004
Spud Date:2/3/2004Spud Date Is:ACTUAL
Measured TD:1800 ft.Measured PB depth:1760 ft.
True Vertical TD:True Vertical PB depth:
Log Types:ARRAY INDUCTION IMAGER, TRIPLE LITHOLOGY DENSITY, CBL, SPECTRASCAN IMAGE
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 499 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 275, Top: 0 ft., Bottom: 499 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 1756 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 82 ft., Bottom: 250 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1263 ft.NN
VERMEJO COAL1263 ft.1570 ft.NN
TRINIDAD1570 ft.1778 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  PR - 8/1/2021                  Interval Top: 1367 ft.    Interval Bottom: 1559 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:N/AChoke Size: 
Formation Name:VERMEJO COALCommingled:No
Production Method:30N095 - PC PUMP
Open Hole Completion:No
Formation Treatment
Treatment Date:4/12/2004
Treatment Summary:PERFORATIONS:1549'-59' (4 SPF, 8 HOLES) FRAC 1ST STAGE: FRAC W/ 6,885 GALS DELTA, 41,000# 16/30 BRADY SAND, 163 BLWTR. PERFORATIONS: 1529'-30' (HYDRA-JET CUT, 8 HOLES) FRAC 2ND STAGE: FRAC W/ 40,326 GALS DELTA 140, 37,795 16/30 BRADY SAND, 637 BLWTR. PERFORATIONS: 1515'-16 (HYDRA-JET CUT, 8 HOLES) FRAC 3RD STAGE: FRAC W/ 21,153 GALS DELTA 140, 23,461 16/30 BRADY SAND, 503 BLWTR. PERFORATIONS: 1462'-63',(HYDRA-JET CUT, 8 HOLES) FRAC 4TH STAGE: FRAC W/ 15,774 GALS DELTA 140, 9,810 16/30 BRADY SAND, 375 BLWTR. PERFORATIONS: 1439'-40' (HYDRA-JET CUT, 8 HOLES) FRAC 5TH STAGE: UNABLE TO BD PERFS. PERFORATIONS: 1367'-68' (HYDRA-JET CUT, 8 HOLES) FRAC 6TH STAGE: FRAC W/ 25,458 GALS DELTA 140, 40,944 16/30 BRADY SAND, 701 BLWTR.
Tubing Size:2.875 in.Tubing Setting Depth:2050 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/20/2004Test Method:TOTAL FLOW EFM
Hours Tested:19Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 40
BBLS_OIL 0
BTU_GAS 1004
CALC_BBLS_H2O 51
CALC_BBLS_OIL 0
CALC_MCF_GAS 28
CASING_PRESS 30
MCF_GAS 22
TUBING_PRESS 1
Perforation Data:
Interval Top:1367 ft.# Of Holes:48
Interval Bottom:1559 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)6080
GOR
GOR DeterminationMCFE
Average BOE per Day2.873
Average MCFE per Day16.651

 Federal Financial Assurance  i 

 Tribal Well  i No