Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07944
Well Classification: CBM Status: PR - 3/1/2021
Well Name/No:APACHE CANYON #1-14
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2021
FacilityID:270571LocationID:308378
County:LAS ANIMAS #071Location:SESW 1 34S68W 6
Field:PURGATOIRE RIVER - #70830Elevation:8041 ft.
Basin:RATON BASIN  
Planned Location:1225FSL  1534 FWLLat/Long: 37.109313 / -104.950551Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.109310 / -104.950530Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 3/1/2021             Measured TD: 2135 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 3/1/2021
Wellbore Permit
Permit #:20032383 Expiration Date:12/18/2004
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:3/13/2004
Spud Date:1/26/2004Spud Date Is:ACTUAL
Measured TD:2135 ft.Measured PB depth:2102 ft.
True Vertical TD:True Vertical PB depth:
Log Types:TRIPLE LITHO DNSITY NEUTRON, ARRAY INDUCTION, CBL, AFTER FRAC GAMMA RAY, TEMP.
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 319 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 130, Top: 0 ft., Bottom: 319 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2077 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 288, Top: 245 ft., Bottom: 2077 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1585 ft.NN
VERMEJO COAL1585 ft.1951 ft.NN
TRINIDAD1951 ft.2134 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 3/1/2021                  Interval Top: 1565 ft.    Interval Bottom: 1871 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:N/AChoke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:30N095 PC PUMP
Open Hole Completion:No
Formation Treatment
Treatment Date:3/13/2004
Treatment Summary:PERFORATIONS: 1869'-71' (4 SPF-8 HOLES) FRAC 1ST STAGE: TREAT W/ 250 GAL 15% HCL, 17,459 GALS LINEAR GEL, 25,164 DELTA FRAC & 40,000# 16/20 BRADY. PERFORATIONS: 1825'-27' (4 SPF-8 HOLES) FRAC 2ND STAGE: TREAT W/ 250 GAL 15% HCL, 6,276 GALS LINEAR GEL, 29,814 DELTA FRAC & 56,700# 16/20 BRADY. PERFORATIONS: 1765'-67' (4 SPF-8 HOLES) FRAC 3RD STAGE: TREAT W/ 200 GAL 15% HCL, 6,153 GALS LINEAR GEL, 7,848 DELTA FRAC & 15,000# 16/20 BRADY. PERFORATIONS: 1596'-98' (4 SPF-8 HOLES) FRAC 4TH STAGE: TREAT W/ 250 GAL 15% HCL, 6,331 GAL LINEAR GEL, 20,530 DELTA & FRAC 40,300# 16/20 BRADY. PERFORATIONS: 1579'-81' (4 SPF-8 HOLES) FRAC 5TH STAGE: TREAT W/ 6,869 GALS LINEAR GEL, 13,675 DELTA FRAC & 26,300# 16/20 BRADY. PERFORATIONS: 1565'-67' (4 SPF-8 HOLES) FRAC 6TH STAGE: TREAT W/ 250 GAL 15% HCL, 4,143 GALS LINEAR GEL, 6,701 DELTA FRAC & 12800 16/20 BRADY.
Tubing Size:2.875 in.Tubing Setting Depth:1896 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/5/2004Test Method:TOTAL FLOW EFM
Hours Tested:14Gas Type:COAL GAS
Gas Disposal:VENTED
Test TypeMeasure
BBLS_H2O 55
BBLS_OIL 0
BTU_GAS 1005
CALC_BBLS_H2O 55
CALC_BBLS_OIL 0
CALC_MCF_GAS 19
CASING_PRESS 20
MCF_GAS 19
TUBING_PRESS 4
Perforation Data:
Interval Top:1565 ft.# Of Holes:48
Interval Bottom:1871 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)4857
GOR
GOR DeterminationMCFE
Average BOE per Day2.285
Average MCFE per Day13.258

 Federal Financial Assurance  i 

 Tribal Well  i No