|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 8/9/2011 Measured TD: 2610 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 8/9/2011 | | Wellbore Permit | | | Permit #: | 20031372 | Expiration Date: | 8/11/2004 | | Proposed Depth/Form: | 2800 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | STATE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: RT-VJ , Formation: RATON-VERMEJO COALS , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 9/3/2003 | | Spud Date: | 8/16/2003 | Spud Date Is: | ACTUAL | | Measured TD: | 2610 ft. | Measured PB depth: | 2570 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | EPITHERMAL NEUTRON LITHO DENSITY, ARRAY INDUCTION, CEMENT BOND (2) | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: , Depth: 808 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: , Bottom: 808 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 2.5 in., Top: , Depth: 2577 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 718, Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | 1906 ft. | N | N | | RATON SAND | 1906 ft. | 2020 ft. | N | N | | VERMEJO COAL | 2020 ft. | 2368 ft. | N | N | | TRINIDAD | 2668 ft. | 2588 ft. | N | N |
Formation VRMJ Formation Classification: GW Status: CM - 6/6/2014 Interval Top: 2026 ft. Interval Bottom: 2309 ft.| Completed Information for Formation VERMEJO COAL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | VERMEJO COAL | Commingled: | No | | Production Method: | 30N095 PC PUMP | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/3/2003 | | Treatment Summary: | PERF 2221-2309(3 SPF-24 HOLES).FRAC 1STG: 750 GALS 15% HCL 7350 GALS GEL 40748 GALS DELTA 20# 9343 20/40&56167#16/20 BRADY SAND.PERF 2026-2152 (3 SPF - 30 HOLES) FRAC 2STG:750GALS15% HCL 6860GALS GEL 43073GALS DELTA 20# 9306 20/40 &62247#16/20 BRADY SAND |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2336 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/15/2003 | Test Method: | TOTAL FLOW EFM | | Hours Tested: | | Gas Type: | COAL GAS | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 87 | | CALC_BBLS_H2O | 87 | | MCF_GAS | 0 |
| | Perforation Data: | | Interval Top: | 2026 ft. | # Of Holes: | 54 | | Interval Bottom: | 2309 ft. | Hole Size: | 0.51 in. |
|
Formation RT-VJ Formation Classification: GW Status: PR - 8/9/2011 Interval Top: 839 ft. Interval Bottom: 2309 ft.| Completed Information for Formation RATON-VERMEJO COALS | | 1st Production Date: | 8/8/2011 | Choke Size: | | | Formation Name: | RATON-VERMEJO COALS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2407 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/9/2011 | Test Method: | Pumping | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 16 | | BTU_GAS | 1007 | | CALC_BBLS_H2O | 16 | | CALC_MCF_GAS | 68 | | CASING_PRESS | 1 | | MCF_GAS | 68 | | TUBING_PRESS | 3 |
| | Perforation Data: | | Interval Top: | 839 ft. | # Of Holes: | 117 | | Interval Bottom: | 2309 ft. | Hole Size: | 0.42 in. |
|
Formation RTON Formation Classification: GW Status: CM - 8/26/2011 Interval Top: 839 ft. Interval Bottom: 1308 ft.| Completed Information for Formation RATON COAL | | 1st Production Date: | 8/8/2011 | Choke Size: | | | Formation Name: | RATON COAL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/14/2011 | | Treatment Summary: | Acidized w/2,000 gals 15% HCl acid. Frac'd w/83,279 gals 20# Delta 140 w/Sandwedge OS carrying 253,500# 16/30 Nebraska sd. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation RTON. |
| | Perforation Data: | | Interval Top: | 839 ft. | # Of Holes: | 63 | | Interval Bottom: | 1308 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 20813 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 9.832 |
| Average MCFE per Day | 57.031 |
| Federal Financial Assurance | i | |
|
|