Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07901
Well Classification: CBM Status: PR - 8/9/2011
Well Name/No:APACHE CANYON #1-5
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/9/2011
FacilityID:269064LocationID:308363
County:LAS ANIMAS #071Location:SWNW 1 34S68W 6
Field:PURGATOIRE RIVER - #70830Elevation:8519 ft.
Basin:RATON BASIN  
Planned Location:1889FNL  866 FWLLat/Long: 37.115243 / -104.952851Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.115240 / -104.952810Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/14/2011
End Date: 7/14/2011
Reported: 4/16/2012
Prior to rule 205A.b.(2)(A)
Days to report: 277
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 8/9/2011             Measured TD: 2610 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 8/9/2011
Wellbore Permit
Permit #:20031372 Expiration Date:8/11/2004
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: RT-VJ , Formation: RATON-VERMEJO COALS , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:9/3/2003
Spud Date:8/16/2003Spud Date Is:ACTUAL
Measured TD:2610 ft.Measured PB depth:2570 ft.
True Vertical TD:True Vertical PB depth:
Log Types:EPITHERMAL NEUTRON LITHO DENSITY, ARRAY INDUCTION, CEMENT BOND (2)
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: , Depth: 808 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: , Bottom: 808 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 2.5 in., Top: , Depth: 2577 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 718, Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1906 ft.NN
RATON SAND1906 ft.2020 ft.NN
VERMEJO COAL2020 ft.2368 ft.NN
TRINIDAD2668 ft.2588 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 6/6/2014                  Interval Top: 2026 ft.    Interval Bottom: 2309 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:N/AChoke Size: 
Formation Name:VERMEJO COALCommingled:No
Production Method:30N095 PC PUMP
Open Hole Completion:No
Formation Treatment
Treatment Date:9/3/2003
Treatment Summary:PERF 2221-2309(3 SPF-24 HOLES).FRAC 1STG: 750 GALS 15% HCL 7350 GALS GEL 40748 GALS DELTA 20# 9343 20/40&56167#16/20 BRADY SAND.PERF 2026-2152 (3 SPF - 30 HOLES) FRAC 2STG:750GALS15% HCL 6860GALS GEL 43073GALS DELTA 20# 9306 20/40 &62247#16/20 BRADY SAND
Tubing Size:2.875 in.Tubing Setting Depth:2336 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/15/2003Test Method:TOTAL FLOW EFM
Hours Tested:Gas Type:COAL GAS
Gas Disposal:
Test TypeMeasure
BBLS_H2O 87
CALC_BBLS_H2O 87
MCF_GAS 0
Perforation Data:
Interval Top:2026 ft.# Of Holes:54
Interval Bottom:2309 ft.Hole Size:0.51 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 8/9/2011                  Interval Top: 839 ft.    Interval Bottom: 2309 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:8/8/2011Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.875 in.Tubing Setting Depth:2407 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/9/2011Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 16
BTU_GAS 1007
CALC_BBLS_H2O 16
CALC_MCF_GAS 68
CASING_PRESS 1
MCF_GAS 68
TUBING_PRESS 3
Perforation Data:
Interval Top:839 ft.# Of Holes:117
Interval Bottom:2309 ft.Hole Size:0.42 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 8/26/2011                 Interval Top: 839 ft.    Interval Bottom: 1308 ft.

 Completed Information for Formation RATON COAL
1st Production Date:8/8/2011Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/14/2011
Treatment Summary:Acidized w/2,000 gals 15% HCl acid. Frac'd w/83,279 gals 20# Delta 140 w/Sandwedge OS carrying 253,500# 16/30 Nebraska sd.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:839 ft.# Of Holes:63
Interval Bottom:1308 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)20041
GOR
GOR DeterminationMCFE
Average BOE per Day9.463
Average MCFE per Day54.889

 Federal Financial Assurance  i 

 Tribal Well  i No