Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07900
Well Classification: CBM Status: PR - 8/4/2012
Well Name/No:APACHE CANYON #1-8
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/4/2012
FacilityID:269062LocationID:308362
County:LAS ANIMAS #071Location:SENE 1 34S68W 6
Field:PURGATOIRE RIVER - #70830Elevation:8306 ft.
Basin:RATON BASIN  
Planned Location:2098FNL  1319 FELLat/Long: 37.114743 / -104.942241Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.114740 / -104.942220Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/11/2012
End Date: 7/11/2012
Reported: 7/26/2012
Days to report: 15
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 8/4/2012             Measured TD: 2541 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 8/4/2012
Wellbore Permit
Permit #:20031373 Expiration Date:8/11/2004
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: RT-VJ , Formation: RATON-VERMEJO COALS , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:9/1/2003
Spud Date:8/15/2003Spud Date Is:ACTUAL
Measured TD:2541 ft.Measured PB depth:2499 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CDL, SIL, CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 583 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 260, Top: 0 ft., Bottom: 583 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2538 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 552, Top: 0 ft., Bottom: 2538 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1856 ft.NN
VERMEJO COAL1981 ft.2343 ft.NN
TRINIDAD2343 ft.2541 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 8/16/2012                 Interval Top: 2014 ft.    Interval Bottom: 2325 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:9/18/2003Choke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/28/2012Treatment End Date:N/A
Treatment Summary:Status Change Only
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:9/1/2003
Treatment Summary:PERFORATIONS; 2243'-2325'-3 SPF, 39 HOLES, FRAC 1ST STAGE W/76,835 GAL DELTA FRAC 20#3,202# 20/40&52,152# 16/30 BRADY SAND., PERFORATIONS; 2100'-82'-3 SPF,24 HOLES FRAC 2 ND STAGE W/51,498 GAL DELTA FRAC 20#, 2,745# 20/40&64,792# 16/30 BRADY SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 100
CALC_BBLS_H2O 100
CALC_MCF_GAS 2
MCF_GAS 2
Perforation Data:
Interval Top:2014 ft.# Of Holes:84
Interval Bottom:2325 ft.Hole Size:

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 8/4/2012                  Interval Top: 652 ft.    Interval Bottom: 2325 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:8/3/2012Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.875 in.Tubing Setting Depth:2425 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/4/2012Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 999
CALC_BBLS_H2O 5
CALC_MCF_GAS 170
GRAVITY_OIL 1
TUBING_PRESS 150
Perforation Data:
Interval Top:652 ft.# Of Holes:141
Interval Bottom:2325 ft.Hole Size:

Formation RTON                     Formation Classification:  GW                     Status:  CM - 8/28/2012                 Interval Top: 652 ft.    Interval Bottom: 1282 ft.

 Completed Information for Formation RATON COAL
1st Production Date:8/3/2012Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/10/2012Treatment End Date:7/12/2012
Treatment Summary:Pumped 3,000 gals 15% HCl acid. Frac'd w/163,452 gals 20# Delta 140 w/sandwedge OS carrying 336,820# 16/30 Brady sand.
Total fluid used in treatment (bbls):3964Max pressure during treatment (psi):2258
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:3
Total acid used in treatment (bbls):72Min frac gradient (psi/ft):0.63
Recycled water used in treatment (bbls):3893Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):336820Green completions techniques utilized:No
Reason green techniques Not utilized: PRESSURE
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:652 ft.# Of Holes:57
Interval Bottom:1282 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)18710
GOR
GOR DeterminationMCFE
Average BOE per Day8.835
Average MCFE per Day51.259

 Federal Financial Assurance  i 

 Tribal Well  i No