|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 7/26/2011 Measured TD: 2699 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 7/26/2011 | | Wellbore Permit | | | Permit #: | 20030163 | Expiration Date: | 2/11/2004 | | Proposed Depth/Form: | 2800 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 4/1/2003 | | Spud Date: | 2/28/2003 | Spud Date Is: | ACTUAL | | Measured TD: | 2699 ft. | Measured PB depth: | 2697 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CDL, SIL, CBL | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 458 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 145, Top: 0 ft., Bottom: 458 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2671 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 385, Top: 100 ft., Bottom: 2671 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | 2270 ft. | N | N | | VERMEJO COAL | 270 ft. | 2577 ft. | N | N | | TRINIDAD | 2577 ft. | 2707 ft. | N | N |
Formation VRMJ Formation Classification: GW Status: CM - 4/4/2003 Interval Top: 2299 ft. Interval Bottom: 2554 ft.| Completed Information for Formation VERMEJO COAL | | 1st Production Date: | 4/4/2003 | Choke Size: | | | Formation Name: | VERMEJO COAL | Commingled: | No | | Production Method: | PUMPING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/1/2003 | | Treatment Summary: | CONV. 25# DELTA PERFORATIONS: 2525'-28', 2549'-54' (34 SHOTS) FRAC 1ST STAGE: 372 BBL SLF, 439 SKS 16/30, 1.5 BBL HCL PERFORATIONS: 2476'-2483', 2485'-87' (38 SHOTS) FRAC 2ND STAGE: 407 BBL SLF, 496.7 SKS 16/30, 1.5 BBL HCL PERFORATIONS: 2439'-43' (16 SHOTS) FRAC 3RD STAGE: 252.6 BBL SLF, 351.3 SKS 16/30, 1.5 BBL HCL PERFORATIONS: 2348'-51', 2353'-61', 2366'-69' (58 SHOTS) FRAC 4TH STAGE: 541.3 BBL SLF, 724.7 SKS 16/30, 1.5 BBL HCL PERFORATIONS: 2299'-02' (12 SHOTS) FRAC 5TH STAGE: 270.4 BBL SLF, 278.7 SKS 16/30, 1.5 BBL HCL |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2562 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/4/2003 | Test Method: | ORIFICE METER | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 216 | | BBLS_OIL | 0 | | BTU_GAS | 1000 | | CALC_BBLS_H2O | 216 | | CASING_PRESS | 25 | | MCF_GAS | 0 |
| | Perforation Data: | | Interval Top: | 2299 ft. | # Of Holes: | 158 | | Interval Bottom: | 2554 ft. | Hole Size: | 4 in. |
|
Formation RT-VJ Formation Classification: GW Status: PR - 7/26/2011 Interval Top: 616 ft. Interval Bottom: 2554 ft.| Completed Information for Formation RATON-VERMEJO COALS | | 1st Production Date: | 7/24/2011 | Choke Size: | | | Formation Name: | RATON-VERMEJO COALS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2620 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/26/2011 | Test Method: | Pumping | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 48 | | BTU_GAS | 1014 | | CALC_BBLS_H2O | 48 | | CALC_MCF_GAS | 17 | | CASING_PRESS | 58 | | MCF_GAS | 17 | | TUBING_PRESS | 1 |
| | Perforation Data: | | Interval Top: | 616 ft. | # Of Holes: | 239 | | Interval Bottom: | 2554 ft. | Hole Size: | 0.42 in. |
|
Formation RTON Formation Classification: GW Status: CM - 8/15/2011 Interval Top: 616 ft. Interval Bottom: 1616 ft.| Completed Information for Formation RATON COAL | | 1st Production Date: | 7/24/2011 | Choke Size: | | | Formation Name: | RATON COAL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/20/2011 | | Treatment Summary: | Acidized w/3,000 gals 15% HCl acid. Frac'd w/118,435 gals 20# Delta 140 w/Sandwedge OS carrying 412,327# 16/30 Nebraska sd. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation RTON. |
| | Perforation Data: | | Interval Top: | 616 ft. | # Of Holes: | 81 | | Interval Bottom: | 1616 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 18799 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 8.876 |
| Average MCFE per Day | 51.499 |
| Federal Financial Assurance | i | |
|
|