Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07817
Well Classification: CBM Status: PR - 5/6/2020
Well Name/No:HILL RANCH #34-08
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/6/2020
FacilityID:266154LocationID:308317
County:LAS ANIMAS #071Location:SENE 34 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7915 ft.
Basin:RATON BASIN  
Planned Location:2432FNL  186 FELLat/Long: 37.041304 / -104.866628Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.041310 / -104.866630Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 5/6/2020             Measured TD: 2415 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 5/6/2020
Wellbore Permit
Permit #:20030167 Expiration Date:2/11/2004
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: , Depth: 325 ft., Weight: 23 , Citings Type: PLANNED
Cement:Sacks: , Top: 0 ft., Bottom: 325 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 2800 ft., Weight: 15.5 , Citings Type: PLANNED
Cement:Sacks: , Top: 0 ft., Bottom: 2800 ft.

Wellbore Completed
Completion Date:9/19/2003
Spud Date:8/19/2003Spud Date Is:ACTUAL
Measured TD:2415 ft.Measured PB depth:2396 ft.
True Vertical TD:True Vertical PB depth:
Log Types:
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1833 ft.NN
VERMEJO COAL1941 ft.2248 ft.NN
TRINIDAD2248 ft.2414 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 4/29/2020                 Interval Top: 1979 ft.    Interval Bottom: 2226 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:9/25/2003Choke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/5/2006
Treatment Summary:ACIDIZED W/1000 GALS 15% HCI ACID. FRAC'D W/110,099 GALS DELTA 140 W/SANDWEDGE NT CARRYING 169,600# 16/30 BRADY SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 51
BTU_GAS 1006
CALC_BBLS_H2O 51
CALC_MCF_GAS 21
CASING_PRESS 47
GRAVITY_OIL 1
MCF_GAS 21
TUBING_PRESS 3
Perforation Data:
Interval Top:1979 ft.# Of Holes:27
Interval Bottom:2226 ft.Hole Size:0.4 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 5/6/2020                  Interval Top: 371 ft.    Interval Bottom: 2226 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:10/4/2018Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RT-VJ.
Perforation Data:
Interval Top:371 ft.# Of Holes:135
Interval Bottom:2226 ft.Hole Size:0.4 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 10/12/2018                Interval Top: 371 ft.    Interval Bottom: 1672 ft.

 Completed Information for Formation RATON COAL
1st Production Date:N/AChoke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/26/2018Treatment End Date:10/3/2018
Treatment Summary:Perforate Raton Coal intervals with 3 SPF and 120 degree phasing listed by stage and fraced Raton Coal intervals including Stage 1 - 1670' - 72', 1478' - 80' and 1322' - 23', Stage 2 - 1209' - 10', 1190' - 92' and 1139' - 41', Stage 3 - 1128' - 31', 1035' - 38' and 1000' - 01', Stage 4 - 934' - 36', 844' - 45', 832' - 34', 823' - 26', 729' - 31' and 707' - 09', Stage 5 - 606' - 08', 452' - 53', 403' - 05' and 371' - 73' (36' net or 108 holes). A total of 176,400 gallons of produced water with 113,022 gallons of x-link and 150,555 lbs of 20/40 sand were pumped. All five stages were pumped according to design. The ECWS #28 rigged down and moved to next location. Well was cleaned out to PBTD and returned to production as a commingled Raton Vermejo well.
Total fluid used in treatment (bbls):6891Max pressure during treatment (psi):3477
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:5
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.42
Recycled water used in treatment (bbls):6891Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):0Disposition method For flowback:
Total proppant used (lbs):150555Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/12/2018Test Method:Flowing
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1
BTU_GAS 993
CALC_BBLS_H2O 1
CALC_MCF_GAS 8
MCF_GAS 8
Perforation Data:
Interval Top:371 ft.# Of Holes:108
Interval Bottom:1672 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)22441
GOR
GOR DeterminationMCFE
Average BOE per Day10.602
Average MCFE per Day61.479

 Federal Financial Assurance  i 

 Tribal Well  i No