Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07815
Well Classification: CBM Status: PR - 11/19/2018
Well Name/No:HILL RANCH #34-16
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:270811
Facility Status:PRStatus Date11/19/2018
FacilityID:266156LocationID:308316
County:LAS ANIMAS #071Location:SESE 34 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7939 ft.
Planned Location:39FSL  383 FELLat/Long: 37.033595 / -104.867308Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.033560 / -104.867300Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 11/19/2018             Measured TD: 2440 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 11/19/2018
Wellbore Permit
Permit #:20030168 Expiration Date:2/11/2004
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:9/24/2003
Spud Date:8/18/2003Spud Date Is:ACTUAL
Measured TD:2440 ft.Measured PB depth:2355 ft.
True Vertical TD:True Vertical PB depth:
Log Types:EPITHERMAL NEUTRON LITHO DENSITY, ARRAY INDUCTION, CEMENT BOND
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 369 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 150, Top: 0 ft., Bottom: 369 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2421 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 341, Top: 54 ft., Bottom: 2421 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1947 ft.NN
VERMEJO COAL1947 ft.2253 ft.NN
TRINIDAD2253 ft.2425 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 11/19/2018                Interval Top: 386 ft.    Interval Bottom: 1332 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:11/1/2003Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/2/2018Treatment End Date:9/18/2018
Treatment Summary:Perforate Raton Coal intervals with 3 SPF and 120 degree phasing listed by stage and fraced Raton Coal intervals including Stage 1 - 1330' - 32', 1253' - 55', 1227' - 29', 1196' - 1200' and 1173' - 75', Stage 2 - 1157' - 58', 1128' - 33', 1124' - 26' and 1121' - 23', Stage 3 - 999' - 1001', 989' - 91', 931' - 33', 920' - 21', 897' - 98', 890' - 91', 860' - 61' and 809' - 11', Stage 4 - 715' - 16', 701' - 03', 668' - 70' and 617' - 19', Stage 5 - 465' - 67', 426' - 28' and 386' - 89' (48' net or 144 holes). A total of 222,684 gallons of produced water with 159,684 gallons of x-link and 230,437 lbs of 16/30 sand were pumped. All five stages were pumped according to design. The ECWS #28 rigged down and moved to next location. Well was cleaned out to PBTD and returned to production as a commingled Raton Vermejo well.
Total fluid used in treatment (bbls):9104Max pressure during treatment (psi):3188
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:5
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.12
Recycled water used in treatment (bbls):9104Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):0Disposition method For flowback:
Total proppant used (lbs):230437Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:9/24/2003
Treatment Summary:SEE OGCC COMMENTS
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/19/2018Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 27
BTU_GAS 992
CALC_BBLS_H2O 27
CALC_MCF_GAS 81
CASING_PRESS 2
MCF_GAS 81
TUBING_PRESS 0
Perforation Data:
Interval Top:386 ft.# Of Holes:144
Interval Bottom:1332 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)25747
GOR
GOR DeterminationMCFE
Average BOE per Day12.145
Average MCFE per Day70.475

 Federal Financial Assurance  i 

 Tribal Well  i No