|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 8/12/2011 Measured TD: 2323 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 8/12/2011 | | Wellbore Permit | | | Permit #: | 20030165 | Expiration Date: | 2/11/2004 | | Proposed Depth/Form: | 2800 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 9/19/2003 | | Spud Date: | 8/23/2003 | Spud Date Is: | ACTUAL | | Measured TD: | 2323 ft. | Measured PB depth: | 2260 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | EPITHERMAL NEUTRON LITHO DENSITY, ARRAY INDUCTION, CEMENT BOND | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 368 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 175, Top: 0 ft., Bottom: 368 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2303 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 341, Top: 142 ft., Bottom: 2303 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | 1844 ft. | N | N | | VERMEJO COAL | 1844 ft. | 2150 ft. | N | N | | TRINIDAD | 2150 ft. | 2312 ft. | N | N |
Formation RT-VJ Formation Classification: GW Status: PR - 8/12/2011 Interval Top: 476 ft. Interval Bottom: 2138 ft.| Completed Information for Formation RATON-VERMEJO COALS | | 1st Production Date: | 7/10/2011 | Choke Size: | | | Formation Name: | RATON-VERMEJO COALS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/19/2003 | | Treatment Summary: | SEE OGCC COMMENTS |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2172 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/12/2011 | Test Method: | Pumping | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 112 | | BTU_GAS | 998 | | CALC_BBLS_H2O | 112 | | CALC_MCF_GAS | 210 | | CASING_PRESS | 48 | | MCF_GAS | 210 | | TUBING_PRESS | 2 |
| | Perforation Data: | | Interval Top: | 476 ft. | # Of Holes: | 100 | | Interval Bottom: | 2138 ft. | Hole Size: | 0.42 in. |
|
Formation RTON Formation Classification: GW Status: CM - 8/15/2011 Interval Top: 476 ft. Interval Bottom: 964 ft.| Completed Information for Formation RATON COAL | | 1st Production Date: | 7/10/2011 | Choke Size: | | | Formation Name: | RATON COAL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/22/2011 | | Treatment Summary: | Acidized w/2,000 gals 15% HCl acid. Frac'd w/63,703 gals 20# Delta 140 w/Sandwedge OS carrying 169,238# 16/30 Nebraska sd. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation RTON. |
| | Perforation Data: | | Interval Top: | 476 ft. | # Of Holes: | 45 | | Interval Bottom: | 964 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 60324 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 28.496 |
| Average MCFE per Day | 165.289 |
| Federal Financial Assurance | i | |
|
|