Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07812
Well Classification: CBM Status: PR - 7/15/2011
Well Name/No:HILL RANCH #33-09
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:270817
Facility Status:PRStatus Date7/15/2011
FacilityID:266140LocationID:308314
County:LAS ANIMAS #071Location:NESE 33 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7902 ft.
Basin:RATON BASIN  
Planned Location:2538FSL  1250 FELLat/Long: 37.040474 / -104.888359Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.040480 / -104.888350Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/23/2011
End Date: 6/23/2011
Reported: 4/17/2012
Prior to rule 205A.b.(2)(A)
Days to report: 299
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 7/15/2011             Measured TD: 2390 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 7/15/2011
Wellbore Permit
Permit #:20030166 Expiration Date:2/11/2004
Proposed Depth/Form:2390 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:11/9/2003
Spud Date:8/24/2003Spud Date Is:ACTUAL
Measured TD:2390 ft.Measured PB depth:2370 ft.
True Vertical TD:True Vertical PB depth:
Log Types:EPITHERMAL NEUTRON LITHO DENSITY, ARRAY INDUCTION, CEMENT BOND
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 430 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 220, Top: 0 ft., Bottom: 430 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2366 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 360, Top: 90 ft., Bottom: 2366 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1915 ft.NN
VERMEJO COAL1915 ft.2221 ft.NN
TRINIDAD2221 ft.2378 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 9/18/2003                 Interval Top: 1916 ft.    Interval Bottom: 2196 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:N/AChoke Size: 
Formation Name:VERMEJO COALCommingled:No
Production Method:PC PUMP
Open Hole Completion:No
Formation Treatment
Treatment Date:11/9/2003
Treatment Summary:SEE OGCC COMMENTS
Tubing Size:2.875 in.Tubing Setting Depth:2216 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/18/2003Test Method:ORIFICE METER
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 100
BBLS_OIL 0
BTU_GAS 1000
CALC_BBLS_H2O 100
CALC_MCF_GAS 147
CASING_PRESS 25
MCF_GAS 147
Perforation Data:
Interval Top:1916 ft.# Of Holes:75
Interval Bottom:2196 ft.Hole Size:

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 7/15/2011                 Interval Top: 644 ft.    Interval Bottom: 2196 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:7/14/2011Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.875 in.Tubing Setting Depth:2249 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/15/2011Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 110
BTU_GAS 1007
CALC_BBLS_H2O 110
CALC_MCF_GAS 78
CASING_PRESS 46
MCF_GAS 78
TUBING_PRESS 2
Perforation Data:
Interval Top:644 ft.# Of Holes:162
Interval Bottom:2196 ft.Hole Size:0.42 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 8/15/2011                 Interval Top: 644 ft.    Interval Bottom: 1270 ft.

 Completed Information for Formation RATON COAL
1st Production Date:7/14/2011Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/23/2011
Treatment Summary:Acidized w/2,750 gals 15% HCl acid. Frac'd w/86,184 gals 20# Delta 140 w/Sandwedge OS carrying 292,052# 16/30 Nebraska sd.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:644 ft.# Of Holes:87
Interval Bottom:1270 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)43939
GOR
GOR DeterminationMCFE
Average BOE per Day20.746
Average MCFE per Day120.336

 Federal Financial Assurance  i 

 Tribal Well  i No