|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 10/23/2013 Measured TD: 2540 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 10/23/2013 | | Wellbore Permit | | | Permit #: | 20030164 | Expiration Date: | 2/11/2004 | | Proposed Depth/Form: | 2800 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 9/26/2003 | | Spud Date: | 8/21/2003 | Spud Date Is: | ACTUAL | | Measured TD: | 2540 ft. | Measured PB depth: | 2463 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | EPITHERMAL NEUT. LITHO DENSITY, ARRAY INDUCTION, CEMENT BOND | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 566 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 255, Top: 0 ft., Bottom: 566 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2490 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 365, Top: 92 ft., Bottom: 2490 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | 2082 ft. | N | N | | VERMEJO COAL | 2082 ft. | 2376 ft. | N | N | | TRINIDAD | 2376 ft. | 2530 ft. | N | N |
Formation VRMJ Formation Classification: GW Status: CM - 10/22/2013 Interval Top: 2083 ft. Interval Bottom: 2353 ft.| Completed Information for Formation VERMEJO COAL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | VERMEJO COAL | Commingled: | | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/17/2005 | | Treatment Summary: | 2005 Status Changed missed filing on original Doc #01421536 | | Formation Treatment | | Treatment Date: | 9/26/2003 | | Treatment Summary: | SEE SCANNED DOC# 1159443 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 100 | | BTU_GAS | 1000 | | CALC_BBLS_H2O | 100 | | CALC_MCF_GAS | 0 | | MCF_GAS | 0 |
| | Perforation Data: | | Interval Top: | 2083 ft. | # Of Holes: | 63 | | Interval Bottom: | 2353 ft. | Hole Size: | |
|
Formation RT-VJ Formation Classification: GW Status: PR - 10/23/2013 Interval Top: 885 ft. Interval Bottom: 2353 ft.| Completed Information for Formation RATON-VERMEJO COALS | | 1st Production Date: | 8/17/2005 | Choke Size: | | | Formation Name: | RATON-VERMEJO COALS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 10/23/2013 | Treatment End Date: | N/A | | Treatment Summary: | 08/12/2005 Drilled out CIBP set @ 1680. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2378 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation RT-VJ. |
| | Perforation Data: | | Interval Top: | 885 ft. | # Of Holes: | 171 | | Interval Bottom: | 2353 ft. | Hole Size: | |
|
Formation RTON Formation Classification: GW Status: CM - 10/22/2013 Interval Top: 885 ft. Interval Bottom: 1486 ft.| Completed Information for Formation RATON COAL | | 1st Production Date: | 5/25/2005 | Choke Size: | | | Formation Name: | RATON COAL | Commingled: | | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/17/2005 | | Treatment Summary: | A. w/2500 gals 15% HCl acid. Frac'd w/242,116 gals 20# Delta 140 w/sandwedge NT carrying 35,342# 16/30 & 358,033# 12/20 Brady sands. | | Formation Treatment | | Treatment Date: | 9/26/2003 | | Treatment Summary: | ACIDIZED W/2500 GALS 15% HCL ACID.FRAC'D W/242,116 GALS 20# DELTA 140 W/SANDWEDGE NT CARRYING 35,342# 16/30 & 358,033# 12/20 BRADY SD. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1581 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/25/2005 | Test Method: | Pumping | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 200 | | BTU_GAS | 1005 | | CALC_BBLS_H2O | 200 | | CALC_MCF_GAS | 20 | | CASING_PRESS | 28 | | GRAVITY_OIL | 1 | | MCF_GAS | 20 |
| | Perforation Data: | | Interval Top: | 885 ft. | # Of Holes: | 108 | | Interval Bottom: | 1486 ft. | Hole Size: | 0.4 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 53434 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 25.240 |
| Average MCFE per Day | 146.371 |
| Federal Financial Assurance | i | |
|
|