Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07798
Well Classification: CBM Status: PR - 11/14/2003
Well Name/No:VPC C #118
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:WAPITI OPERATING LLC - 10351
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/14/2003
FacilityID:265682LocationID:308309
County:LAS ANIMAS #071Location:SWSW 1 35S66W 6
Field:PURGATOIRE RIVER - #70830Elevation:7534 ft.
Basin:RATON BASIN  
Planned Location:438FSL  1267 FWLLat/Long: 37.020625 / -104.735384Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.020610 / -104.735390Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 11/14/2003             Measured TD: 2000 ft.    Vertical TD: 2000 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 11/14/2003
Wellbore Permit
Permit #:20022305 Expiration Date:1/1/2004
Proposed Depth/Form:2150 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:10/28/2003
Spud Date:5/8/2003Spud Date Is:ACTUAL
Measured TD:2000 ft.Measured PB depth:1950 ft.
True Vertical TD:2000 ft.True Vertical PB depth:1950 ft.
Log Types:ARRAY INDUCTION,EPITHERMAL NEUTRON LITHO DENSITY, CEMENT BOND LOG/AFTER FRAC & MUD LOG.
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 246 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 246 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 1974 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 269, Top: 0 ft., Bottom: 1956 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1458 ft.NN
VERMEJO COAL1459 ft.1726 ft.NN
TRINIDAD1736 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 11/14/2003                Interval Top: 1462 ft.    Interval Bottom: 1556 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:N/AChoke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/28/2003
Treatment Summary:10/24/03 PUMP FRAC TREATMENT & 47,400 LBS OF 20/40 OTTAWA/TEMP LC PROPP SAND AT 10 BPM. (STAGE 1 AND 2) THRU 9 HOLES: 1462-1464', 1552-1556'.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation VRMJ.
Perforation Data:
Interval Top:1462 ft.# Of Holes:9
Interval Bottom:1556 ft.Hole Size:

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 11/14/2003                Interval Top: 790 ft.    Interval Bottom: 1556 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:N/AChoke Size:0.266 in.
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:PUMPING CBM GAS WELL. PROD WATER INJECTED IN WDW.
Open Hole Completion:No
Formation Treatment
Treatment Date:10/28/2003
Treatment Summary:10/24/03 PUMPED FRAC TREATMENT & 119,300 LBS 20/40 OTTAWA/TEMP LC PROPP SND AT 10 BPM. (STAGE 1 AND 5) THRU 21 HOLES:790-794',927-929',1348-1350',1462-1464',1552-1556'
Tubing Size:2.875 in.Tubing Setting Depth:1633 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/14/2003Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
CALC_BBLS_H2O 0
CALC_MCF_GAS 14
CASING_PRESS 5
MCF_GAS 14
Perforation Data:
Interval Top:790 ft.# Of Holes:21
Interval Bottom:1556 ft.Hole Size:

Formation RTON                     Formation Classification:  GW                     Status:  CM - 11/14/2003                Interval Top: 790 ft.    Interval Bottom: 1350 ft.

 Completed Information for Formation RATON COAL
1st Production Date:N/AChoke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/28/2003
Treatment Summary:10/23/03 PUMPED FRAC TREATMENT & 71,900 LBS 20/40 OTTAWA/TEMP LC PROPP SAND AT 10 BPM.(STAGE 3-5)THRU 12 HOLES:790-794',927-929',1348-1350'.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:790 ft.# Of Holes:12
Interval Bottom:1350 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)6390
GOR
GOR DeterminationMCFE
Average BOE per Day3.017
Average MCFE per Day17.509

 Federal Financial Assurance  i 

 Tribal Well  i No