|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 4/30/2014 Measured TD: 1880 ft. Vertical TD: 1880 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 4/30/2014 | | Wellbore Permit | | | Permit #: | 20022306 | Expiration Date: | 1/1/2004 | | Proposed Depth/Form: | 2000 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 10/23/2003 | | Spud Date: | 5/10/2003 | Spud Date Is: | ACTUAL | | Measured TD: | 1880 ft. | Measured PB depth: | 1845 ft. | | True Vertical TD: | 1880 ft. | True Vertical PB depth: | 1845 ft. | | Log Types: | ARRAY INDUCTION, EPITHERMAL NEUTRON LITHO DENSITY, CEMENT BOND LOG. AFTER FRAC & MUD LOG. | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 259 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 85, Top: 0 ft., Bottom: 260 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 1866 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 255, Top: 30 ft., Bottom: 1855 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | 1386 ft. | N | N | | VERMEJO COAL | 1396 ft. | 1616 ft. | N | N | | TRINIDAD | 1618 ft. | | N | N |
Formation VRMJ Formation Classification: GW Status: CM - 10/12/2010 Interval Top: 1513 ft. Interval Bottom: 1616 ft.| Completed Information for Formation VERMEJO COAL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | VERMEJO COAL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 9/17/2010 | | Treatment Summary: | PERF'D 1513-1519', 1526-1529,1582-1588', 1590-1592' & 1610'-1616'
9/16/10 1610'-1616' 300 GAL OF ACID 7.5% HCL, 1582'-1588' & 1590'-1592' 300 GAL 7.5% HCL 1526-1529 300 GAL OF ACID 7.5% HCL.
1513-1519 300 GAL OF ACID 7.5% HCL, 9/17/10 1526-1529 50 GAL OF ACID 15% HCL, * 15 PREVIOUS HOLES PLUS 92 HOLES THIS PERF = 107 HOLES. | | Formation Treatment | | Treatment Date: | 10/23/2003 | | Treatment Summary: | 10/21/03 PUMPED FRACTURE TREATMENT W/62,400 LBS OF 20/40 OTTAWA/TLC SAND AT 10.8 BPM. AVG PRESSURE AT 2,517 PSI. (STAGE 1 THRU 3) THRU 15 HOLES, 1611-1614',1582-1586',1517-1519',1526-1528'. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation VRMJ. |
| | Perforation Data: | | Interval Top: | 1513 ft. | # Of Holes: | 107 | | Interval Bottom: | 1616 ft. | Hole Size: | |
|
Formation RT-VJ Formation Classification: GW Status: PR - 10/12/2010 Interval Top: 1252 ft. Interval Bottom: 1307 ft.| Completed Information for Formation RATON-VERMEJO COALS | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | RATON-VERMEJO COALS | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 9/17/2010 | | Treatment Summary: | PERF'D 1252-1255 & 1304-1307, 1513-1519, 1526-1529, 1582-1588',1590'-1592' & 1610'-1616'
09/16/10 1610'-1616' 300 GAL OF ACID 7.5% HCL, 1582'-1588' & 1590-1592 300 GAL ACID 7.5% HCL 1526-1529 300 GALL OF ACID 7.5% HCL 1513-1519 300 GAL OF ACID 7.5% HCL 9/17/10 1526-1529 50 GAL OF ACID 15% HCL 1252-1255 150 AK IF ACUD 7.5% HCL | | Formation Treatment | | Treatment Date: | 10/23/2003 | | Treatment Summary: | 10/21/03 PUMPED FRAC TREATMENT W/105,900 LBS OF 20/40 OTTAWA/TLC SAND AT 10.8 BPM, AVG PRESSURE AT 2,517 PSI. (STAGE 1 THRU 5) THRU 21 HOLES, 1611,1614',1582-1586',1517-1519',1526-1528',1303-1306',1253-1255'. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1684 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/23/2010 | Test Method: | production | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 70 | | BTU_GAS | 998 | | CALC_BBLS_H2O | 70 | | CALC_MCF_GAS | 28 | | CASING_PRESS | 14 | | MCF_GAS | 28 | | TUBING_PRESS | 300 |
| | Perforation Data: | | Interval Top: | 1252 ft. | # Of Holes: | 30 | | Interval Bottom: | 1307 ft. | Hole Size: | 0.45 in. |
|
Formation RTON Formation Classification: GW Status: CM - 4/30/2014 Interval Top: 1252 ft. Interval Bottom: 1307 ft.| Completed Information for Formation RATON COAL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | RATON COAL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 9/17/2010 | | Treatment Summary: | PERF'D 1252-1255 & 1304-1307- 9/16/10 1303'-1307' 200 GAL ACID 7.5% GCK
9/17/10 1252'-1255' 150 GAK IF ACUD 7.5% HCL
*6 PREVIOUS HOLES PLUS 24 HOLES THIS PERF = 30 HOLES. | | Formation Treatment | | Treatment Date: | 10/23/2003 | | Treatment Summary: | 10/21/03 PUMPED FRACTURE TREATMENT W/43,500 LBS OF 20/40 OTTAWA/TLC SAND AT 10.8 BPM, AVG PRESSURE AT 2,517 PSI. (STAGE 4 THRU 5) THRU 6 HOLES, 1303-1306';1253-1255'. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation RTON. |
| | Perforation Data: | | Interval Top: | 1252 ft. | # Of Holes: | 30 | | Interval Bottom: | 1307 ft. | Hole Size: | 0.45 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 4149 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 1.963 |
| Average MCFE per Day | 11.373 |
| Federal Financial Assurance | i | |
|
|