Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07792
Well Classification: CBM Status: PR - 4/30/2014
Well Name/No:VPR C #120
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:WAPITI OPERATING LLC - 10351
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/30/2014
FacilityID:265688LocationID:308303
County:LAS ANIMAS #071Location:SWSW 6 35S65W 6
Field:PURGATOIRE RIVER - #70830Elevation:7470 ft.
Basin:RATON BASIN  
Planned Location:106FSL  217 FWLLat/Long: 37.019716 / -104.720894Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.019700 / -104.720890Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 4/30/2014             Measured TD: 1910 ft.    Vertical TD: 1910 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 4/30/2014
Wellbore Permit
Permit #:20022303 Expiration Date:1/1/2004
Proposed Depth/Form:2050 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:10/19/2003
Spud Date:5/13/2003Spud Date Is:ACTUAL
Measured TD:1910 ft.Measured PB depth:1860 ft.
True Vertical TD:1910 ft.True Vertical PB depth:1860 ft.
Log Types:ARRAY INDUCTION,EPITHERMAL NEUTRON LITHO DENSITY,CEMENT BOND LOG AFTER FRAC, AND MUD LOG.
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 260 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 85, Top: 0 ft., Bottom: 260 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 1881 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 267, Top: 50 ft., Bottom: 1871 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1422 ft.NN
VERMEJO COAL1518 ft.1660 ft.NN
TRINIDAD1666 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 10/13/2010                Interval Top: 1518 ft.    Interval Bottom: 1524 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:N/AChoke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:9/22/2010
Treatment Summary:PERF'D 1518'-1523'. 09/22/2010 - 1518'-1523' 250 GAL OF ACID 7.5% HCL. *6 PREVIOUS HOLES PLUS 20 HOLES THIS PERF = 26 HOLES.
Formation Treatment
Treatment Date:10/19/2003
Treatment Summary:10/16/03 PUMPED FRAC. TREATMENT W/40,930 LBS OF 20/40 OTTAWA/TLC SAND AT 12.4 BPM, AVG PRESSURE AT 1,568 PSI (STAGE 1) THRU 6 HOLES, 1520-1524'.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation VRMJ.
Perforation Data:
Interval Top:1518 ft.# Of Holes:26
Interval Bottom:1524 ft.Hole Size:

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 10/13/2010                Interval Top: 782 ft.    Interval Bottom: 1524 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:N/AChoke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:9/22/2010
Treatment Summary:PERF'D 1518'-1524', 1349'-1351', 1293'-1296', 915'-917', 895'-899', 823'-825', 782'-786', 1518'-1523' 250 GAL OF ACID 7.5% HCL, 1349'-1351' 100 GAL OF ACID 7.5% HCL, 1293'-1296' 150 GAL OF ACID 7.5% HCL, 895'-899' 200 GAL OF ACID 7.5% HCL, 823'-825' 100 GAL OF ACID 7.5% HCL, 7.5% HCL, 782'-786' 200 GAL OF ACID 7.5% HCL.
Formation Treatment
Treatment Date:10/19/2003
Treatment Summary:10/16/03 PUMPED FRAC TREATMENT W/122,290 LBS OF 20/40 OTTAWA/TLC SAND AT 12.4 BPM, AVG PRESSURE AT 1,568 PSI (STAGE 1 THRU 7) THRU 18 HOLES,784-786',823-825',896-898',915-917',1294-1296',1349-1351',1520-1524'.
Tubing Size:2.875 in.Tubing Setting Depth:1584 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/24/2010Test Method:production
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 30
BTU_GAS 998
CALC_BBLS_H2O 30
CALC_MCF_GAS 29
CASING_PRESS 15
MCF_GAS 29
TUBING_PRESS 300
Perforation Data:
Interval Top:782 ft.# Of Holes:112
Interval Bottom:1524 ft.Hole Size:0.45 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 4/30/2014                 Interval Top: 782 ft.    Interval Bottom: 1351 ft.

 Completed Information for Formation RATON COAL
1st Production Date:N/AChoke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:9/22/2010
Treatment Summary:PERF'D 1349'-1351', 1293'-1296', 915'-917', 895'-899', 823'-825', 782'-786'. 09/22/2010 - 1349'-1351' 100 GAL OF ACID 7.5% HCL, 1293'-1296' 150 GAL OF ACID 7.5% HCL, 895'-899' 200 GAL OF ACID 7.5% HCL, 823'-825' 100 GAL OF ACID 7.5% HCL, 7.5% HCL, 782'-786' 200 GAL OF ACID 7.5% HCL. *18 HOLES PREVIOUS + 68 HOLES THIS PERF = 86 HOLES.
Formation Treatment
Treatment Date:10/19/2003
Treatment Summary:10/16/03PUMPED FRAC TREATMENT W/81,360 LBS OF 20/40 OTTAWA/TLC SAND AT 12.4 BPM, AVG PRESSURE AT 1,568 PSI (STAGE 2 THRU 7) THRU 18 HOLES, 784-786',823-825',896-898',915-917',1294-1296',1349-1351'.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:782 ft.# Of Holes:86
Interval Bottom:1351 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)3737
GOR
GOR DeterminationMCFE
Average BOE per Day1.767
Average MCFE per Day10.255

 Federal Financial Assurance  i 

 Tribal Well  i No