Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07779
Well Classification: CBM Status: PR - 7/12/2011
Well Name/No:GOLDEN EAGLE #27-05
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/12/2011
FacilityID:265526LocationID:308293
County:LAS ANIMAS #071Location:SWNW 27 33S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7205 ft.
Planned Location:1374FNL  690 FWLLat/Long: 37.146432 / -104.880940Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.146680 / -104.881350Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/13/2011
End Date: 6/13/2011
Reported: 4/16/2012
Prior to rule 205A.b.(2)(A)
Days to report: 308
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 7/12/2011             Measured TD: 1918 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 7/12/2011
Wellbore Permit
Permit #:20022194 Expiration Date:12/15/2003
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:2/3/2004
Spud Date:12/8/2003Spud Date Is:ACTUAL
Measured TD:1918 ft.Measured PB depth:1916 ft.
True Vertical TD:True Vertical PB depth:
Log Types:LITHO DENSITY NEUTRON,DUAL INDUCTION, CEMENT BOND
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 288 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 125, Top: 0 ft., Bottom: 288 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 1913 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 321, Top: 44 ft., Bottom: 1913 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1226 ft.NN
VERMEJO COAL1284 ft.1708 ft.NN
TRINIDAD1708 ft.1918 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 2/11/2004                 Interval Top: 1374 ft.    Interval Bottom: 1688 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:N/AChoke Size: 
Formation Name:VERMEJO COALCommingled:No
Production Method:30N-095-PC PUMP
Open Hole Completion:No
Formation Treatment
Treatment Date:2/3/2004
Treatment Summary:1681.5-88',1645-47',1635.5-39'(3 SPF,39 HOLES) FRAC 1ST STAGE:PUMPED 64,820 GAL 20# DELTA FRAC FLUID. PLACED 96,300# SAND.;1546-47.5',1513'-16',1379.5-80.5,1373.5'-74.5'(3 SPF,22 HOLES) FRAC 2ND STAGE:PUMPED 43,235 GAL 20# DELTA FRAC FLUID. 57,400# SAND
Tubing Size:2.875 in.Tubing Setting Depth:1717 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/11/2004Test Method:ORIFICE METER
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 100
BTU_GAS 1004
CALC_BBLS_H2O 100
CALC_MCF_GAS 3
CASING_PRESS 25
MCF_GAS 3
Perforation Data:
Interval Top:1374 ft.# Of Holes:61
Interval Bottom:1688 ft.Hole Size:

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 7/12/2011                 Interval Top: 408 ft.    Interval Bottom: 1688 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:7/11/2011Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.875 in.Tubing Setting Depth:1806 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/12/2011Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 53
BTU_GAS 1007
CALC_BBLS_H2O 53
CALC_MCF_GAS 25
CASING_PRESS 39
MCF_GAS 25
TUBING_PRESS 1
Perforation Data:
Interval Top:408 ft.# Of Holes:115
Interval Bottom:1688 ft.Hole Size:0.46 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 8/11/2011                 Interval Top: 408 ft.    Interval Bottom: 1176 ft.

 Completed Information for Formation RATON COAL
1st Production Date:7/11/2011Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/13/2011
Treatment Summary:Acidized w/1,750 gals 15% HCl acid. Frac'd w/69,234 gal 20# Delta 140 w/Sandwedge OS carrying 234,704# 16/30 Nebraska sd.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:408 ft.# Of Holes:54
Interval Bottom:1176 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
April 2024 - March 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)9567
GOR
GOR DeterminationMCFE
Average BOE per Day4.517
Average MCFE per Day26.207

 Federal Financial Assurance  i 

 Tribal Well  i No