Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07777
Well Classification: CBM Status: PR - 6/3/2014
Well Name/No:HILL RANCH #18-16
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/3/2014
FacilityID:265528LocationID:308292
County:LAS ANIMAS #071Location:SESE 18 35S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8556 ft.
Basin:RATON BASIN  
Planned Location:1297FSL  559 FELLat/Long: 36.993615 / -104.922120Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 36.993610 / -104.922100Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 6/3/2014             Measured TD: 2875 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 6/3/2014
Wellbore Permit
Permit #:20022139 Expiration Date:12/15/2003
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:1/27/2004
Spud Date:10/27/2003Spud Date Is:ACTUAL
Measured TD:2875 ft.Measured PB depth:2847 ft.
True Vertical TD:True Vertical PB depth:
Log Types:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 348 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 159, Top: 0 ft., Bottom: 348 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2859 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 474, Top: 0 ft., Bottom: 2859 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2312 ft.NN
VERMEJO COAL2417 ft.2702 ft.NN
TRINIDAD2702 ft.2865 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 10/16/2013                Interval Top: 2440 ft.    Interval Bottom: 2680 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:N/AChoke Size: 
Formation Name:VERMEJO COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/29/2006
Treatment Summary:2006 Status Changed for reporting purposes. Status change was not reported correctly on DOC #1965975.
Formation Treatment
Treatment Date:4/12/2006
Treatment Summary:ACIDIZED W/ 1000 GALS 15% HCI ACID. FRAC'D W/100,823 GALS 20# DELTA 140 W/ SANDWEDGE NT CARRYING 93,003# 16/30 BRADY SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 114
BBLS_OIL 0
BTU_GAS 1008
CALC_BBLS_H2O 114
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 0
CASING_PRESS 2
GRAVITY_OIL 1
MCF_GAS 0
TUBING_PRESS 2
Perforation Data:
Interval Top:2440 ft.# Of Holes:93
Interval Bottom:2680 ft.Hole Size:0.4 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 10/17/2013                Interval Top: 1134 ft.    Interval Bottom: 2680 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:10/18/2007Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/17/2013Treatment End Date:N/A
Treatment Summary:2007 Status Change - 10/17/2007 drilled out CIBP @ 2100' and commingled production. Please note the total Vermejo hole should be 93 (62 in 2004 & 31 additional 2006).
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.875 in.Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RT-VJ.
Perforation Data:
Interval Top:1134 ft.# Of Holes:153
Interval Bottom:2680 ft.Hole Size:

Formation RTON                     Formation Classification:  GW                     Status:  CM - 6/3/2014                  Interval Top: 1134 ft.    Interval Bottom: 1763 ft.

 Completed Information for Formation RATON COAL
1st Production Date:12/19/2006Choke Size: 
Formation Name:RATON COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/5/2006
Treatment Summary:ACIDIZED W/ 3000 GALS 15% HCI ACID. FRAC'D W/ 129,628 GALS 20# DELTA 140 W/ SANDWEDGE NT CARRYING 16,000# 16/30 BRADY SAND & 213,530# 12/20 BRADY SAND.
Formation Treatment
Treatment Date:11/28/2006
Treatment Summary:Acidized w/3000 gals 15% HCl acid. Frac'd w/129,628 gals 20# Delta 140 w/sandwedge NT carrying 16,600# 16/30 Brady sand & 213,530# 12/20 Brady sand.
Tubing Size:2.875 in.Tubing Setting Depth:1883 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/20/2006Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 48
BBLS_OIL 0
BTU_GAS 999
CALC_BBLS_H2O 48
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 32
CASING_PRESS 9
GRAVITY_OIL 1
MCF_GAS 32
TUBING_PRESS 6
Perforation Data:
Interval Top:1134 ft.# Of Holes:66
Interval Bottom:1763 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
July 2024 - June 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)22940
GOR
GOR DeterminationMCFE
Average BOE per Day10.829
Average MCFE per Day62.825

 Federal Financial Assurance  i 

 Tribal Well  i No