|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 6/3/2014 Measured TD: 2875 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 6/3/2014 | | Wellbore Permit | | | Permit #: | 20022139 | Expiration Date: | 12/15/2003 | | Proposed Depth/Form: | 2800 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 1/27/2004 | | Spud Date: | 10/27/2003 | Spud Date Is: | ACTUAL | | Measured TD: | 2875 ft. | Measured PB depth: | 2847 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 348 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 159, Top: 0 ft., Bottom: 348 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2859 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 474, Top: 0 ft., Bottom: 2859 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | 2312 ft. | N | N | | VERMEJO COAL | 2417 ft. | 2702 ft. | N | N | | TRINIDAD | 2702 ft. | 2865 ft. | N | N |
Formation VRMJ Formation Classification: GW Status: CM - 10/16/2013 Interval Top: 2440 ft. Interval Bottom: 2680 ft.| Completed Information for Formation VERMEJO COAL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | VERMEJO COAL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/29/2006 | | Treatment Summary: | 2006 Status Changed for reporting purposes. Status change was not reported correctly on DOC #1965975. | | Formation Treatment | | Treatment Date: | 4/12/2006 | | Treatment Summary: | ACIDIZED W/ 1000 GALS 15% HCI ACID. FRAC'D W/100,823 GALS 20# DELTA 140 W/ SANDWEDGE NT CARRYING 93,003# 16/30 BRADY SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 114 | | BBLS_OIL | 0 | | BTU_GAS | 1008 | | CALC_BBLS_H2O | 114 | | CALC_BBLS_OIL | 0 | | CALC_GOR | 0 | | CALC_MCF_GAS | 0 | | CASING_PRESS | 2 | | GRAVITY_OIL | 1 | | MCF_GAS | 0 | | TUBING_PRESS | 2 |
| | Perforation Data: | | Interval Top: | 2440 ft. | # Of Holes: | 93 | | Interval Bottom: | 2680 ft. | Hole Size: | 0.4 in. |
|
Formation RT-VJ Formation Classification: GW Status: PR - 10/17/2013 Interval Top: 1134 ft. Interval Bottom: 2680 ft.| Completed Information for Formation RATON-VERMEJO COALS | | 1st Production Date: | 10/18/2007 | Choke Size: | | | Formation Name: | RATON-VERMEJO COALS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 10/17/2013 | Treatment End Date: | N/A | | Treatment Summary: | 2007 Status Change - 10/17/2007 drilled out CIBP @ 2100' and commingled production.
Please note the total Vermejo hole should be 93 (62 in 2004 & 31 additional 2006). | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation RT-VJ. |
| | Perforation Data: | | Interval Top: | 1134 ft. | # Of Holes: | 153 | | Interval Bottom: | 2680 ft. | Hole Size: | |
|
Formation RTON Formation Classification: GW Status: CM - 6/3/2014 Interval Top: 1134 ft. Interval Bottom: 1763 ft.| Completed Information for Formation RATON COAL | | 1st Production Date: | 12/19/2006 | Choke Size: | | | Formation Name: | RATON COAL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/5/2006 | | Treatment Summary: | ACIDIZED W/ 3000 GALS 15% HCI ACID. FRAC'D W/ 129,628 GALS 20# DELTA 140 W/ SANDWEDGE NT CARRYING 16,000# 16/30 BRADY SAND & 213,530# 12/20 BRADY SAND. | | Formation Treatment | | Treatment Date: | 11/28/2006 | | Treatment Summary: | Acidized w/3000 gals 15% HCl acid. Frac'd w/129,628 gals 20# Delta 140 w/sandwedge NT carrying 16,600# 16/30 Brady sand & 213,530# 12/20 Brady sand. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1883 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/20/2006 | Test Method: | Pumping | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 48 | | BBLS_OIL | 0 | | BTU_GAS | 999 | | CALC_BBLS_H2O | 48 | | CALC_BBLS_OIL | 0 | | CALC_GOR | 0 | | CALC_MCF_GAS | 32 | | CASING_PRESS | 9 | | GRAVITY_OIL | 1 | | MCF_GAS | 32 | | TUBING_PRESS | 6 |
| | Perforation Data: | | Interval Top: | 1134 ft. | # Of Holes: | 66 | | Interval Bottom: | 1763 ft. | Hole Size: | 0.45 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 22516 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 10.629 |
| Average MCFE per Day | 61.667 |
| Federal Financial Assurance | i | |
|
|