Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07776
Well Classification: CBM Status: PR - 8/14/2010
Well Name/No:HILL RANCH #17-14
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/14/2010
FacilityID:265529LocationID:308291
County:LAS ANIMAS #071Location:SESW 17 35S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8468 ft.
Basin:RATON BASIN  
Planned Location:1297FSL  1734 FWLLat/Long: 36.993605 / -104.914269Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 36.993620 / -104.914260Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 8/14/2010             Measured TD: 2782 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 8/14/2010
Wellbore Permit
Permit #:2022138 Expiration Date:12/15/2003
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:11/22/2003
Spud Date:10/29/2003Spud Date Is:ACTUAL
Measured TD:2782 ft.Measured PB depth:2774 ft.
True Vertical TD:True Vertical PB depth:
Log Types:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 225 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 114, Top: 0 ft., Bottom: 225 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2739 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 506, Top: 0 ft., Bottom: 2739 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2366 ft.NN
VERMEJO COAL2366 ft.2662 ft.NN
TRINIDAD2662 ft.2782 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 8/23/2010                 Interval Top: 2380 ft.    Interval Bottom: 2638 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:12/4/2003Choke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/30/2010
Treatment Summary:Acidized w/1,500 gals 15% HCl acid. Refrac'd w/97,900 gals 20# Delta 140 carrying 15,000# 16/30 Brady sd & 146,600# 12/20 Brady sd coated w/Sandwedge OS.
Formation Treatment
Treatment Date:11/22/2003
Treatment Summary:SEE OGCC COMMENTS
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 68
BBLS_OIL 0
BTU_GAS 1004
CALC_BBLS_H2O 68
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 0
CASING_PRESS 25
MCF_GAS 0
Perforation Data:
Interval Top:2380 ft.# Of Holes:70
Interval Bottom:2638 ft.Hole Size:

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 8/14/2010                 Interval Top: 677 ft.    Interval Bottom: 2638 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:8/11/2010Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.875 in.Tubing Setting Depth:2651 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/14/2010Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 96
BTU_GAS 994
CALC_BBLS_H2O 96
CALC_MCF_GAS 276
CASING_PRESS 78
MCF_GAS 276
TUBING_PRESS 8
Perforation Data:
Interval Top:677 ft.# Of Holes:158
Interval Bottom:2638 ft.Hole Size:0.46 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 2/18/2011                 Interval Top: 677 ft.    Interval Bottom: 1698 ft.

 Completed Information for Formation RATON COAL
1st Production Date:8/11/2010Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/31/2010
Treatment Summary:Acidized w/4,300 gals 15% HCl acid. Frac'd w/143,102 gals 20# Delta 140 carrying 24,900# 16/30 Brady sd & 267,600# 12/20 Brady sd coated w/Sandwedge OS.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:677 ft.# Of Holes:88
Interval Bottom:1698 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)47822
GOR
GOR DeterminationMCFE
Average BOE per Day22.585
Average MCFE per Day130.979

 Federal Financial Assurance  i 

 Tribal Well  i No