Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07774
Well Classification: CBM Status: PR - 10/1/2025
Well Name/No:GOLDEN EAGLE #17-13
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/1/2025
FacilityID:265487LocationID:308289
County:LAS ANIMAS #071Location:SWSW 17 33S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7756 ft.
Basin:RATON BASIN  
Planned Location:447FSL  913 FWLLat/Long: 37.166332 / -104.917241Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.166550 / -104.916930Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/5/2011
End Date: 8/5/2011
Reported: 4/16/2012
Prior to rule 205A.b.(2)(A)
Days to report: 255
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 10/1/2025             Measured TD: 2504 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 10/1/2025
Wellbore Permit
Permit #:20022191 Expiration Date:12/11/2003
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 2800 ft., Weight: 15.5 , Citings Type: PLANNED
Cement:Sacks: , Top: 0 ft., Bottom: 2800 ft.

Wellbore Completed
Completion Date:11/23/2003
Spud Date:9/30/2003Spud Date Is:ACTUAL
Measured TD:2504 ft.Measured PB depth:2496 ft.
True Vertical TD:True Vertical PB depth:
Log Types:EPITHERMAL NEUTRON LITHO DENSITY, ARRAY INDUCTION, CEMENT BOND
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 721 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 321, Top: 0 ft., Bottom: 721 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2468 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 384, Top: 0 ft., Bottom: 2468 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1859 ft.NN
VERMEJO COAL1859 ft.2310 ft.NN
TRINIDAD2310 ft.2394 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 3/22/2005                 Interval Top: 1974 ft.    Interval Bottom: 2308 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:N/AChoke Size: 
Formation Name:VERMEJO COALCommingled:No
Production Method:30N-095 - PC PUMP
Open Hole Completion:No
Formation Treatment
Treatment Date:11/23/2003
Treatment Summary:SEE OGCC COMMENTS
Tubing Size:2.875 in.Tubing Setting Depth:2353 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/9/2003Test Method:ORIFICE METER
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 25
BBLS_OIL 0
BTU_GAS 1004
CALC_BBLS_H2O 25
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 0
CASING_PRESS 25
MCF_GAS 0
Perforation Data:
Interval Top:1974 ft.# Of Holes:87
Interval Bottom:2308 ft.Hole Size:0.51 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 10/1/2025                 Interval Top: 727 ft.    Interval Bottom: 2308 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:8/19/2011Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.875 in.Tubing Setting Depth:2359 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/22/2011Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 37
BTU_GAS 990
CALC_BBLS_H2O 37
CALC_MCF_GAS 69
CASING_PRESS 24
MCF_GAS 69
TUBING_PRESS 3
Perforation Data:
Interval Top:727 ft.# Of Holes:150
Interval Bottom:2308 ft.Hole Size:0.42 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 10/10/2011                Interval Top: 727 ft.    Interval Bottom: 1214 ft.

 Completed Information for Formation RATON COAL
1st Production Date:8/19/2011Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/5/2011
Treatment Summary:Acidized w/2,000 gals 15% HCl acid. Frac'd w/80,194 gals 20# Delta 140 w/Sandwedge OS carrying 267,909# 16/30 Nebraska sd.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:727 ft.# Of Holes:63
Interval Bottom:1214 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)6681
GOR
GOR DeterminationMCFE
Average BOE per Day3.173
Average MCFE per Day18.384

 Federal Financial Assurance  i 

 Tribal Well  i No