|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 10/1/2025 Measured TD: 2504 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 10/1/2025 | | Wellbore Permit | | | Permit #: | 20022191 | Expiration Date: | 12/11/2003 | | Proposed Depth/Form: | 2800 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 2800 ft., Weight: 15.5 , Citings Type: PLANNED | | Cement: | Sacks: , Top: 0 ft., Bottom: 2800 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/23/2003 | | Spud Date: | 9/30/2003 | Spud Date Is: | ACTUAL | | Measured TD: | 2504 ft. | Measured PB depth: | 2496 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | EPITHERMAL NEUTRON LITHO DENSITY, ARRAY INDUCTION, CEMENT BOND | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 721 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 321, Top: 0 ft., Bottom: 721 ft., Determination Method: CBL | | Casing: | String Type: 2ND, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2468 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 384, Top: 0 ft., Bottom: 2468 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | 1859 ft. | N | N | | VERMEJO COAL | 1859 ft. | 2310 ft. | N | N | | TRINIDAD | 2310 ft. | 2394 ft. | N | N |
Formation VRMJ Formation Classification: GW Status: CM - 3/22/2005 Interval Top: 1974 ft. Interval Bottom: 2308 ft.| Completed Information for Formation VERMEJO COAL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | VERMEJO COAL | Commingled: | No | | Production Method: | 30N-095 - PC PUMP | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/23/2003 | | Treatment Summary: | SEE OGCC COMMENTS |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2353 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/9/2003 | Test Method: | ORIFICE METER | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 25 | | BBLS_OIL | 0 | | BTU_GAS | 1004 | | CALC_BBLS_H2O | 25 | | CALC_BBLS_OIL | 0 | | CALC_GOR | 0 | | CALC_MCF_GAS | 0 | | CASING_PRESS | 25 | | MCF_GAS | 0 |
| | Perforation Data: | | Interval Top: | 1974 ft. | # Of Holes: | 87 | | Interval Bottom: | 2308 ft. | Hole Size: | 0.51 in. |
|
Formation RT-VJ Formation Classification: GW Status: PR - 10/1/2025 Interval Top: 727 ft. Interval Bottom: 2308 ft.| Completed Information for Formation RATON-VERMEJO COALS | | 1st Production Date: | 8/19/2011 | Choke Size: | | | Formation Name: | RATON-VERMEJO COALS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2359 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/22/2011 | Test Method: | Pumping | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 37 | | BTU_GAS | 990 | | CALC_BBLS_H2O | 37 | | CALC_MCF_GAS | 69 | | CASING_PRESS | 24 | | MCF_GAS | 69 | | TUBING_PRESS | 3 |
| | Perforation Data: | | Interval Top: | 727 ft. | # Of Holes: | 150 | | Interval Bottom: | 2308 ft. | Hole Size: | 0.42 in. |
|
Formation RTON Formation Classification: GW Status: CM - 10/10/2011 Interval Top: 727 ft. Interval Bottom: 1214 ft.| Completed Information for Formation RATON COAL | | 1st Production Date: | 8/19/2011 | Choke Size: | | | Formation Name: | RATON COAL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/5/2011 | | Treatment Summary: | Acidized w/2,000 gals 15% HCl acid. Frac'd w/80,194 gals 20# Delta 140 w/Sandwedge OS carrying 267,909# 16/30 Nebraska sd. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation RTON. |
| | Perforation Data: | | Interval Top: | 727 ft. | # Of Holes: | 63 | | Interval Bottom: | 1214 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 6681 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 3.173 |
| Average MCFE per Day | 18.384 |
| Federal Financial Assurance | i | |
|
|