Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07773
Well Classification: CBM Status: PR - 8/12/2010
Well Name/No:HILL RANCH #17-09
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/12/2010
FacilityID:265450LocationID:308288
County:LAS ANIMAS #071Location:NESE 17 35S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8140 ft.
Basin:RATON BASIN  
Planned Location:1558FSL  960 FELLat/Long: 36.994335 / -104.905429Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 36.994310 / -104.905420Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 8/12/2010             Measured TD: 2500 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 8/12/2010
Wellbore Permit
Permit #:20022140 Expiration Date:12/10/2003
Proposed Depth/Form:2500 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: , Depth: 200 ft., Weight: 23 , Citings Type: PLANNED
Cement:Sacks: , Top: 0 ft., Bottom: 200 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 2500 ft., Weight: 15.5 , Citings Type: PLANNED
Cement:Sacks: , Top: 0 ft., Bottom: 2500 ft.

Wellbore Completed
Completion Date:11/24/2003
Spud Date:10/31/2003Spud Date Is:ACTUAL
Measured TD:2500 ft.Measured PB depth:2486 ft.
True Vertical TD:True Vertical PB depth:
Log Types:EPITHERMAN NEU.,ARRAY INDUCTION, CEMENT BOND (3)
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1963 ft.NN
VERMEJO COAL2058 ft.2354 ft.NN
TRINIDAD2354 ft.2504 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 8/20/2010                 Interval Top: 2072 ft.    Interval Bottom: 2320 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:12/5/2003Choke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/22/2010
Treatment Summary:Acidized w/1,500 gals 15% HCl acid. Refrac'd w/113,308 gals 20# Delta 140 carrying 108,826# 16/30 Brady sd & 50,464# 12/20 Brady sd (43,200# 12/20 Brady sd coated w/Expedite 155).
Formation Treatment
Treatment Date:11/24/2003
Treatment Summary:PERFORATIONS; 2316'-20', 2311' - 13', 2295' - 96.5'.2274'-75', 2329.5'-30.5' (3 SPF,39 HOLES) FRAC 1ST STAGE; 750 GALS 15% HCL, 66,567 GALS DELTA 140, 98,000# 16/30 & 12,960# 12/20 BRADY SAND. PERFORATIONS; 2151.5' - 53', 2143'-46.5', 2110.5'-2072'-75'
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 108
CALC_BBLS_H2O 108
CALC_MCF_GAS 1
CASING_PRESS 28
MCF_GAS 1
TUBING_PRESS 1
Perforation Data:
Interval Top:2072 ft.# Of Holes:68
Interval Bottom:2320 ft.Hole Size:

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 8/12/2010                 Interval Top: 449 ft.    Interval Bottom: 2320 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:8/5/2010Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.875 in.Tubing Setting Depth:2378 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/12/2010Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 987
CALC_MCF_GAS 370
CASING_PRESS 25
MCF_GAS 370
Perforation Data:
Interval Top:449 ft.# Of Holes:142
Interval Bottom:2320 ft.Hole Size:0.46 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 2/18/2011                 Interval Top: 449 ft.    Interval Bottom: 1196 ft.

 Completed Information for Formation RATON COAL
1st Production Date:8/5/2010Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/22/2010
Treatment Summary:Acidized w/3,600 gals 15% HCl acid. Frac'd w/129,465 gals 20# Delta 140 carrying 24,537# 16/30 Brady sd & 229,874# 12/20 Brady sd (95,700# 12/20 Brady sd coated w/Expedite 155).
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:449 ft.# Of Holes:74
Interval Bottom:1196 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
July 2024 - June 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)32847
GOR
GOR DeterminationMCFE
Average BOE per Day15.509
Average MCFE per Day89.970

 Federal Financial Assurance  i 

 Tribal Well  i No