Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07773
Well Classification: CBM Status: PR - 8/12/2010
Well Name/No:HILL RANCH #17-09
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/12/2010
FacilityID:265450LocationID:308288
County:LAS ANIMAS #071Location:NESE 17 35S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8140 ft.
Basin:RATON BASIN  
Planned Location:1558FSL  960 FELLat/Long: 36.994335 / -104.905429Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 36.994310 / -104.905420Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 8/12/2010             Measured TD: 2500 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 8/12/2010
Wellbore Permit
Permit #:20022140 Expiration Date:12/10/2003
Proposed Depth/Form:2500 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: , Depth: 200 ft., Weight: 23 , Citings Type: PLANNED
Cement:Sacks: , Top: 0 ft., Bottom: 200 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 2500 ft., Weight: 15.5 , Citings Type: PLANNED
Cement:Sacks: , Top: 0 ft., Bottom: 2500 ft.

Wellbore Completed
Completion Date:11/24/2003
Spud Date:10/31/2003Spud Date Is:ACTUAL
Measured TD:2500 ft.Measured PB depth:2486 ft.
True Vertical TD:True Vertical PB depth:
Log Types:EPITHERMAN NEU.,ARRAY INDUCTION, CEMENT BOND (3)
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1963 ft.NN
VERMEJO COAL2058 ft.2354 ft.NN
TRINIDAD2354 ft.2504 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 8/20/2010                 Interval Top: 2072 ft.    Interval Bottom: 2320 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:12/5/2003Choke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/22/2010
Treatment Summary:Acidized w/1,500 gals 15% HCl acid. Refrac'd w/113,308 gals 20# Delta 140 carrying 108,826# 16/30 Brady sd & 50,464# 12/20 Brady sd (43,200# 12/20 Brady sd coated w/Expedite 155).
Formation Treatment
Treatment Date:11/24/2003
Treatment Summary:PERFORATIONS; 2316'-20', 2311' - 13', 2295' - 96.5'.2274'-75', 2329.5'-30.5' (3 SPF,39 HOLES) FRAC 1ST STAGE; 750 GALS 15% HCL, 66,567 GALS DELTA 140, 98,000# 16/30 & 12,960# 12/20 BRADY SAND. PERFORATIONS; 2151.5' - 53', 2143'-46.5', 2110.5'-2072'-75'
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 108
CALC_BBLS_H2O 108
CALC_MCF_GAS 1
CASING_PRESS 28
MCF_GAS 1
TUBING_PRESS 1
Perforation Data:
Interval Top:2072 ft.# Of Holes:68
Interval Bottom:2320 ft.Hole Size:

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 8/12/2010                 Interval Top: 449 ft.    Interval Bottom: 2320 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:8/5/2010Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.875 in.Tubing Setting Depth:2378 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/12/2010Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 987
CALC_MCF_GAS 370
CASING_PRESS 25
MCF_GAS 370
Perforation Data:
Interval Top:449 ft.# Of Holes:142
Interval Bottom:2320 ft.Hole Size:0.46 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 2/18/2011                 Interval Top: 449 ft.    Interval Bottom: 1196 ft.

 Completed Information for Formation RATON COAL
1st Production Date:8/5/2010Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/22/2010
Treatment Summary:Acidized w/3,600 gals 15% HCl acid. Frac'd w/129,465 gals 20# Delta 140 carrying 24,537# 16/30 Brady sd & 229,874# 12/20 Brady sd (95,700# 12/20 Brady sd coated w/Expedite 155).
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:449 ft.# Of Holes:74
Interval Bottom:1196 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)31312
GOR
GOR DeterminationMCFE
Average BOE per Day14.794
Average MCFE per Day85.814

 Federal Financial Assurance  i 

 Tribal Well  i No