|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 4/30/2014 Measured TD: 2030 ft. Vertical TD: 2030 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 4/30/2014 | | Wellbore Permit | | | Permit #: | 20021757 | Expiration Date: | 10/1/2003 | | Proposed Depth/Form: | 2150 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 10/30/2003 | | Spud Date: | 5/9/2003 | Spud Date Is: | ACTUAL | | Measured TD: | 2030 ft. | Measured PB depth: | 1990 ft. | | True Vertical TD: | 2030 ft. | True Vertical PB depth: | 1990 ft. | | Log Types: | ARRAY INDUCTION,EPITHERMAL NEUTRON LITHO DENSITY,CEMENT BOND LOG . AFTER FRAC & MUD LOG. | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 254 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 85, Top: 0 ft., Bottom: 254 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2017 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 273, Top: 40 ft., Bottom: 1995 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | 1497 ft. | N | N | | VERMEJO COAL | 1498 ft. | 1777 ft. | N | N | | TRINIDAD | 1780 ft. | | N | N |
Formation VRMJ Formation Classification: GW Status: CM - 11/14/2003 Interval Top: 1506 ft. Interval Bottom: 1777 ft.| Completed Information for Formation VERMEJO COAL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | VERMEJO COAL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/30/2003 | | Treatment Summary: | 10/28/03 PUMPED FRACTURE TREATMENT & 96,300 LBS OF 20/40 OTTAWA/TEMP LC PROPP SAND AT 10.8 BPM. (STAGE 1 THRU 4) THRU 15 HOLES. 1506-1508', 1590-1594', 1699-1701', 1775-1777'. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation VRMJ. |
| | Perforation Data: | | Interval Top: | 1506 ft. | # Of Holes: | 15 | | Interval Bottom: | 1777 ft. | Hole Size: | |
|
Formation RT-VJ Formation Classification: GW Status: PR - 11/14/2003 Interval Top: 917 ft. Interval Bottom: 1777 ft.| Completed Information for Formation RATON-VERMEJO COALS | | 1st Production Date: | 11/14/2003 | Choke Size: | | | Formation Name: | RATON-VERMEJO COALS | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/30/2003 | | Treatment Summary: | 10/28/03PUMP FRAC TREAT & 160,150 LBS 20/40 OTTAWA/TEMP LC PROPP SND AT 10.8 BPM.(STAGE 1 & 7) THRU 24 HOLES:917-919',965-967',1,397-1,399', 1,506-1,508',1,590-1594',1,699-1,701',1,775-1,777'. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1820 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/14/2003 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| CASING_PRESS | 5 |
| | Perforation Data: | | Interval Top: | 917 ft. | # Of Holes: | 24 | | Interval Bottom: | 1777 ft. | Hole Size: | 0.5 in. |
|
Formation RTON Formation Classification: GW Status: CM - 4/30/2014 Interval Top: 917 ft. Interval Bottom: 1399 ft.| Completed Information for Formation RATON COAL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | RATON COAL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/30/2003 | | Treatment Summary: | 10/28/03 PUMPED FRACTURE TREATMENT AND 63,850 LBS OF 20/40 OTTAWA/TEMP LC PROPP SAND AT 10.8 BPM. (STAGE 5 THRU 7) THRU 9 HOLES. 917-919',965-967',1397-1399'. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation RTON. |
| | Perforation Data: | | Interval Top: | 917 ft. | # Of Holes: | 9 | | Interval Bottom: | 1399 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 6915 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 3.270 |
| Average MCFE per Day | 18.954 |
| Federal Financial Assurance | i | |
|
|