Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07732
Well Classification: CBM Status: PR - 11/13/2010
Well Name/No:VPR C #104
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:WAPITI OPERATING LLC - 10351
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/13/2010
FacilityID:264827LocationID:308254
County:LAS ANIMAS #071Location:NWSE 13 35S66W 6
Field:PURGATOIRE RIVER - #70830Elevation:7584 ft.
Basin:RATON BASIN  
Planned Location:3173FNL  1508 FELLat/Long: 36.996206 / -104.726804Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 36.996200 / -104.726800Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 11/13/2010             Measured TD: 2230 ft.    Vertical TD: 2230 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 11/13/2010
Wellbore Permit
Permit #:20021766 Expiration Date:10/1/2003
Proposed Depth/Form:2200 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:6/2/2003
Spud Date:4/2/2003Spud Date Is:ACTUAL
Measured TD:2230 ft.Measured PB depth:1991 ft.
True Vertical TD:2230 ft.True Vertical PB depth:1991 ft.
Log Types:AI,EPITHERMAL NEU. LITHO DEN., CBL, AFTER FRAC., & MUD LOG
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 260 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 85, Top: 0 ft., Bottom: 260 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2006 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 290, Top: 38 ft., Bottom: 2030 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1567 ft.NN
VERMEJO COAL1567 ft.1741 ft.NN
TRINIDAD1779 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  CM - 6/10/2003                 Interval Top: 948 ft.    Interval Bottom: 1740 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:N/AChoke Size:0.250 in.
Formation Name:RATON-VERMEJO COALSCommingled:Yes
Production Method:PUMPING CBM GAS WELL. PRODUCED WATER INJECTED IN WDW.
Open Hole Completion:No
Formation Treatment
Treatment Date:6/2/2003
Treatment Summary:SEE SCANNED DOC# 1200045
Tubing Size:2.875 in.Tubing Setting Depth:1784 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/10/2003Test Method:PUMPING FLOW
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 257
CALC_BBLS_H2O 257
CALC_MCF_GAS 7
CASING_PRESS 15
MCF_GAS 7
Perforation Data:
Interval Top:948 ft.# Of Holes:46
Interval Bottom:1740 ft.Hole Size:

Formation RTS-VJ                 Formation Classification:  GW                 Status:  PR - 11/13/2010                Interval Top: 948 ft.    Interval Bottom: 1740 ft.

 Completed Information for Formation RATON SAND - VERMEJO COAL
1st Production Date:8/28/2010Choke Size: 
Formation Name:RATON SAND - VERMEJO COALCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:8/28/2010
Treatment Summary:ACID 1737'-1741' W/250 GALS 15% HCL, 1623'-1628' W/350 GALS 15% HCL, 1472'-1475' W/300 GALS 15% HCL, 1050'-1053' 250 GALS 15% HCL *46 HOLES IN FROM PREVIOUS. NO NEW PREF'S THIS TIME.
Tubing Size:2.875 in.Tubing Setting Depth:1801 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/13/2010Test Method:PRODUCTION
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 66
BTU_GAS 998
CALC_BBLS_H2O 66
CALC_MCF_GAS 34
CASING_PRESS 14
MCF_GAS 34
TUBING_PRESS 250
Perforation Data:
Interval Top:948 ft.# Of Holes:46
Interval Bottom:1740 ft.Hole Size:0.51 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)12906
GOR
GOR DeterminationMCFE
Average BOE per Day6.099
Average MCFE per Day35.375

 Federal Financial Assurance  i 

 Tribal Well  i No