Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07731
Well Classification: CBM Status: PR - 5/1/2025
Well Name/No:VPR C #112
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:WAPITI OPERATING LLC - 10351
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2025
FacilityID:264828LocationID:308253
County:LAS ANIMAS #071Location:NENE 11 35S66W 6
Field:PURGATOIRE RIVER - #70830Elevation:7448 ft.
Basin:RATON BASIN  
Planned Location:1136FNL  377 FELLat/Long: 37.016305 / -104.741024Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.016290 / -104.741030Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 5/1/2025             Measured TD: 1910 ft.    Vertical TD: 1910 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 5/1/2025
Wellbore Permit
Permit #:20021758 Expiration Date:10/1/2003
Proposed Depth/Form:2000 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:11/4/2003
Spud Date:5/16/2003Spud Date Is:ACTUAL
Measured TD:1910 ft.Measured PB depth:1857 ft.
True Vertical TD:1910 ft.True Vertical PB depth:1857 ft.
Log Types:ARRAY INDUCTION,EPITHERMAL NEUTRON LITHO DENSITY,CEMENT BOND LOG AFTER FRAC AND MUD LOG.
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 257 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 85, Top: 0 ft., Bottom: 257 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 1880 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 261, Top: 0 ft., Bottom: 1861 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1387 ft.NN
VERMEJO COAL1387 ft.1621 ft.NN
TRINIDAD1666 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 11/14/2003                Interval Top: 1472 ft.    Interval Bottom: 1572 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:N/AChoke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/4/2003
Treatment Summary:10/31/03 PUMPED FRAC TREATMENT & 71,900 LBS OF 20/40 OTTAWA/TEMP LC PROPP SAND AT 11.8 BPM. (STAGE 1 AND 2) THRU 9 HOLES:1472-1476', 1570-1572'.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation VRMJ.
Perforation Data:
Interval Top:1472 ft.# Of Holes:9
Interval Bottom:1572 ft.Hole Size:

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 5/1/2025                  Interval Top: 873 ft.    Interval Bottom: 1572 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:N/AChoke Size:0.266 in.
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:PUMPING CBM GAS WELL. PRODUCED WATER INJ IN WDW.
Open Hole Completion:No
Formation Treatment
Treatment Date:11/4/2003
Treatment Summary:10/31/03 PUMPED FRAC TREATMENT & 115,300 LBS 20/40 OTTAWA/TEMP LC PROPP SAND AT 11.8 BPM. (STAGE 1 AND 4) THRU 15 HOLES: 873-875', 1278-1280', 1472-1476'. 1570-1572'.
Tubing Size:2.875 in.Tubing Setting Depth:1629 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/14/2003Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
CALC_BBLS_H2O 0
CALC_MCF_GAS 0
CASING_PRESS 70
MCF_GAS 0
Perforation Data:
Interval Top:873 ft.# Of Holes:15
Interval Bottom:1572 ft.Hole Size:

Formation RTON                     Formation Classification:  GW                     Status:  CM - 4/30/2014                 Interval Top: 873 ft.    Interval Bottom: 1280 ft.

 Completed Information for Formation RATON COAL
1st Production Date:N/AChoke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/4/2003
Treatment Summary:10/31/03 PUMPED FRACTURE TREATMENT AND 43,400 LBS OF 20/40 OTTAWA/TEMP LC PROPP SAND AT 11.8 BPM.(STAGE 3 & 4) THRU 6 HOLES:873-875', 1278-1280'.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:873 ft.# Of Holes:6
Interval Bottom:1280 ft.Hole Size:
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)573
GOR
GOR DeterminationMCFE
Average BOE per Day0.274
Average MCFE per Day1.571

 Federal Financial Assurance  i 

 Tribal Well  i No