|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 10/26/2002 Measured TD: 2215 ft. Vertical TD: 2215 ft. Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 10/26/2002 | Wellbore Permit | | Permit #: | 20021054 | Expiration Date: | 6/23/2003 | Proposed Depth/Form: | 2400 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 10/22/2002 | Spud Date: | 9/27/2002 | Spud Date Is: | ACTUAL | Measured TD: | 2215 ft. | Measured PB depth: | 2121 ft. | True Vertical TD: | 2215 ft. | True Vertical PB depth: | 2121 ft. | Top PZ Location: | Sec: Twp: | Footage: FL FL | Bottom Hole Location: | Sec: Twp: | Footage: FL FL | Log Types: | ARRAY IND.,EPITHERMAL NEU. LITHO DEN.,CBL AND MUD LOG | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 220 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 85, Top: 0 ft., Bottom: 220 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2145 ft., Weight: 15.5 , Citings Type: ACTUAL | Cement: | Sacks: 298, Top: 0 ft., Bottom: 2110 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | RATON COAL | 0 ft. | 1750 ft. | N | N | VERMEJO COAL | 1750 ft. | 1966 ft. | N | N | TRINIDAD | 1981 ft. | | N | N |
Formation RT-VJ Formation Classification: GW Status: PR - 10/26/2002 Interval Top: 996 ft. Interval Bottom: 1966 ft. Completed Information for Formation RATON-VERMEJO COALS | 1st Production Date: | N/A | Choke Size: | 0.250 in. | Formation Name: | RATON-VERMEJO COALS | Commingled: | Yes | Production Method: | PUMPING CBM GAS WELL. PRODUCED WATER INJECTED IN WDW. | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 10/22/2002 | Treatment Summary: | 10/20/02 PUMPED 18 BBLS 15% NEFE ACID, LINEAR GEL, TREATED WATER, AND 128,900 LBS OF 16/30 MESH SAND AT 8.7 BPM ( STAGE 1 THRU STAGE 5 ) THRU 54 HOLES 996' - 1,966'. |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2025 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/26/2002 | Test Method: | PUMPING FLOW | Hours Tested: | 24 | Gas Type: | COAL GAS | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 156 | BBLS_OIL | 0 | CALC_BBLS_H2O | 156 | CALC_BBLS_OIL | 0 | CALC_MCF_GAS | 0 | CASING_PRESS | 24 | MCF_GAS | 0 |
| Perforation Data: | Interval Top: | 996 ft. | # Of Holes: | 54 | Interval Bottom: | 1966 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 38176 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 18.026 |
Average MCFE per Day | 104.535 |
Federal Financial Assurance | i | |
|
|