|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 11/5/2002 Measured TD: 2065 ft. Vertical TD: 2065 ft. Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 11/5/2002 | Wellbore Permit | | Permit #: | 20021061 | Expiration Date: | 6/23/2003 | Proposed Depth/Form: | 2200 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 10/26/2002 | Spud Date: | 10/2/2002 | Spud Date Is: | ACTUAL | Measured TD: | 2065 ft. | Measured PB depth: | 2120 ft. | True Vertical TD: | 2065 ft. | True Vertical PB depth: | 2120 ft. | Top PZ Location: | Sec: Twp: | Footage: FL FL | Bottom Hole Location: | Sec: Twp: | Footage: FL FL | Log Types: | ARRAY INDUCTION,EPITHERMAL NEUTRON LITHO,CBL AND MUD LOG | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 222 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 85, Top: 0 ft., Bottom: 222 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2026 ft., Weight: 15.5 , Citings Type: ACTUAL | Cement: | Sacks: 314, Top: 42 ft., Bottom: 2013 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | RATON COAL | 0 ft. | 1567 ft. | N | N | VERMEJO COAL | 1567 ft. | 1807 ft. | N | N | TRINIDAD | 1822 ft. | | N | N |
Formation RT-VJ Formation Classification: GW Status: PR - 11/5/2002 Interval Top: 983 ft. Interval Bottom: 1807 ft. Completed Information for Formation RATON-VERMEJO COALS | 1st Production Date: | N/A | Choke Size: | 0.250 in. | Formation Name: | RATON-VERMEJO COALS | Commingled: | Yes | Production Method: | PUMPING CBM GAS WELL. PRODUCED WATER INJECTED IN WDW. | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 10/26/2002 | Treatment Summary: | 10/24/02 PUMPED 12 BBLS 15% NEFE ACID, LINEAR GEL, TREATED WATER, AND 84,830 BLS OF 16/30 MESH SAND AT 10.7 BPM ( STAGE 1 THRU STAGE 3 ) THRU 20 HOLES 983' - 1807'. |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1863 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 11/5/2002 | Test Method: | PUMPING FLOW | Hours Tested: | 24 | Gas Type: | COAL GAS | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 150 | BBLS_OIL | 0 | CALC_BBLS_H2O | 150 | CALC_BBLS_OIL | 0 | CALC_MCF_GAS | 38 | MCF_GAS | 38 |
| Perforation Data: | Interval Top: | 983 ft. | # Of Holes: | 20 | Interval Bottom: | 1807 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 6310 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 2.978 |
Average MCFE per Day | 17.285 |
Federal Financial Assurance | i | |
|
|