|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 11/18/2002 Measured TD: 2095 ft. Vertical TD: 2095 ft. Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 11/18/2002 | Wellbore Permit | | Permit #: | 20021063 | Expiration Date: | 6/23/2003 | Proposed Depth/Form: | 2250 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 11/2/2002 | Spud Date: | 10/6/2002 | Spud Date Is: | ACTUAL | Measured TD: | 2095 ft. | Measured PB depth: | 2070 ft. | True Vertical TD: | 2095 ft. | True Vertical PB depth: | 2070 ft. | Top PZ Location: | Sec: Twp: | Footage: FL FL | Bottom Hole Location: | Sec: Twp: | Footage: FL FL | Log Types: | ARRAY IND.,EPITHERMAL NEU LITHO DEN.,CBL AND MUD LOG | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 245 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 85, Top: 0 ft., Bottom: 245 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2080 ft., Weight: 15.5 , Citings Type: ACTUAL | Cement: | Sacks: 315, Top: 0 ft., Bottom: 2080 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | RATON COAL | 0 ft. | 1590 ft. | N | N | VERMEJO COAL | 1590 ft. | 1845 ft. | N | N | TRINIDAD | 1862 ft. | | N | N |
Formation RT-VJ Formation Classification: GW Status: PR - 11/18/2002 Interval Top: 1465 ft. Interval Bottom: 1806 ft. Completed Information for Formation RATON-VERMEJO COALS | 1st Production Date: | N/A | Choke Size: | 0.250 in. | Formation Name: | RATON-VERMEJO COALS | Commingled: | Yes | Production Method: | PUMPING CBM GAS WELL. PRODUCED WATER INJECTED IN WDW. | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 11/2/2002 | Treatment Summary: | 10/28/02 PUMPED 14.4 BBLS 15% NEFE ACID, LINEAR GEL, TREATED WATER, AND 120,690 LBS OF 16/30 MESH SAND AT 9.5 BPM (STAGE 1 THRU STAGE 3) THRU 23 HOLES 11465' - 1806'. |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1863 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 11/18/2002 | Test Method: | PUMPING FLOW | Hours Tested: | 24 | Gas Type: | COAL GAS | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 97 | CALC_BBLS_H2O | 97 | MCF_GAS | 0 |
| Perforation Data: | Interval Top: | 1465 ft. | # Of Holes: | 23 | Interval Bottom: | 1806 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 8639 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 4.080 |
Average MCFE per Day | 23.668 |
Federal Financial Assurance | i | |
|
|