Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07638
Well Classification: CBM Status: PR - 7/28/2011
Well Name/No:HILL RANCH #10-12V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/28/2011
FacilityID:263770LocationID:308181
County:LAS ANIMAS #071Location:NWSW 10 35S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8187 ft.
Planned Location:2553FSL  422 FWLLat/Long: 37.011465 / -104.882609Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.011470 / -104.882560Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/27/2011
End Date: 6/27/2011
Reported: 4/17/2012
Prior to rule 205A.b.(2)(A)
Days to report: 295
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 7/28/2011             Measured TD: 2577 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 7/28/2011
Wellbore Permit
Permit #:20020951 Expiration Date:5/23/2003
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:8/1/2002
Spud Date:7/10/2002Spud Date Is:ACTUAL
Measured TD:2577 ft.Measured PB depth:2552 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CDL, SIL, CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 213 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 65, Top: 0 ft., Bottom: 213 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2524 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 429, Top: 0 ft., Bottom: 2524 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2167 ft.NN
VERMEJO COAL2167 ft.2447 ft.NN
TRINIDAD2447 ft.2577 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 8/7/2002                  Interval Top: 2160 ft.    Interval Bottom: 2429 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:8/7/2002Choke Size: 
Formation Name:VERMEJO COALCommingled:
Production Method:PUMPING
Open Hole Completion:
Formation Treatment
Treatment Date:8/1/2002
Treatment Summary:SEE SCANNED DOC.# 01098301
Tubing Size:2.875 in.Tubing Setting Depth:2450 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/7/2002Test Method:ORIFICE METER
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 162
BBLS_OIL 0
BTU_GAS 984
CALC_BBLS_H2O 162
CALC_MCF_GAS 1
CASING_PRESS 25
MCF_GAS 1
Perforation Data:
Interval Top:2160 ft.# Of Holes:104
Interval Bottom:2429 ft.Hole Size:4 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 7/28/2011                 Interval Top: 614 ft.    Interval Bottom: 2429 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:7/27/2011Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.875 in.Tubing Setting Depth:2451 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/28/2011Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 75
BTU_GAS 1004
CALC_BBLS_H2O 75
CALC_MCF_GAS 35
CASING_PRESS 83
MCF_GAS 35
TUBING_PRESS 5
Perforation Data:
Interval Top:614 ft.# Of Holes:173
Interval Bottom:2429 ft.Hole Size:0.42 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 8/24/2011                 Interval Top: 614 ft.    Interval Bottom: 1508 ft.

 Completed Information for Formation RATON COAL
1st Production Date:7/27/2011Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/27/2011
Treatment Summary:Acidized w/2,500 gals 15% HCl acid. Frac'd w/66,541 gals 20# Delta 140 w/Sandwedge OS carrying 250,815# 16/30 Nebraska sd.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:614 ft.# Of Holes:69
Interval Bottom:1508 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)22808
GOR
GOR DeterminationMCFE
Average BOE per Day10.767
Average MCFE per Day62.473

 Federal Financial Assurance  i 

 Tribal Well  i No