Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07589
Well Classification: CBM Status: PR - 1/25/2010
Well Name/No:HILL RANCH #08-08V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/25/2010
FacilityID:262941LocationID:308148
County:LAS ANIMAS #071Location:SENE 8 35S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8248 ft.
Basin:RATON BASIN  
Planned Location:2079FNL  505 FELLat/Long: 37.013315 / -104.903879Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.013290 / -104.903850Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 1/25/2010             Measured TD: 2628 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 1/25/2010
Wellbore Permit
Permit #:20020433 Expiration Date:3/4/2003
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:8/7/2002
Spud Date:7/12/2002Spud Date Is:ACTUAL
Measured TD:2628 ft.Measured PB depth:2632 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CDL, SIL, CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 707 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 220, Top: 0 ft., Bottom: 707 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2601 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 2601 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2198 ft.NN
VERMEJO COAL2198 ft.2498 ft.NN
TRINIDAD2498 ft.2628 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 1/25/2010                 Interval Top: 2199 ft.    Interval Bottom: 2463 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:8/12/2002Choke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/14/2010
Treatment Summary:ACIDIZED W/1,000 GAL 15% CHI ACID. REFRACD W/ 86,078 GAL 20# DELTA 140 W/SANDWEDGE OS CARRYING 8,452# 16/30 BRADY SD & 178,591# 12/20 BRADY SND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 262
BBLS_OIL 0
BTU_GAS 1000
CALC_BBLS_H2O 262
CALC_MCF_GAS 31
CASING_PRESS 25
MCF_GAS 31
Perforation Data:
Interval Top:2199 ft.# Of Holes:120
Interval Bottom:2463 ft.Hole Size:0.4 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 1/25/2010                 Interval Top: 950 ft.    Interval Bottom: 2463 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:1/22/2010Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/7/2002
Treatment Summary:
Tubing Size:2.875 in.Tubing Setting Depth:2523 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/25/2010Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 94
BTU_GAS 1002
CALC_BBLS_H2O 94
CALC_BBLS_OIL 0
CALC_MCF_GAS 18
CASING_PRESS 96
MCF_GAS 18
TUBING_PRESS 4
Perforation Data:
Interval Top:950 ft.# Of Holes:176
Interval Bottom:2463 ft.Hole Size:0.45 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 1/25/2010                 Interval Top: 950 ft.    Interval Bottom: 1527 ft.

 Completed Information for Formation RATON COAL
1st Production Date:1/22/2010Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/14/2010
Treatment Summary:ACIDIZED W/3,400 GALS 15% HCL ACID. FRACD W/ 100,527 GAL 20# DELTA 140 W/ SANDWEDGE OS CARRYING 15,367# 16/30 BRADY SD & 186,231# 12/20 BRADY SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:950 ft.# Of Holes:56
Interval Bottom:1527 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)20049
GOR
GOR DeterminationMCFE
Average BOE per Day9.474
Average MCFE per Day54.928

 Federal Financial Assurance  i 

 Tribal Well  i No