Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07588
Well Classification: CBM Status: PR - 8/6/2006
Well Name/No:HILL RANCH #10-09V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/6/2006
FacilityID:262940LocationID:308147
County:LAS ANIMAS #071Location:NESE 10 35S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8042 ft.
Basin:RATON BASIN  
Planned Location:2383FSL  358 FELLat/Long: 37.011035 / -104.867218Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.011050 / -104.867190Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 8/6/2006             Measured TD: 2495 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 8/6/2006
Wellbore Permit
Permit #:20020434 Expiration Date:3/4/2003
Proposed Depth/Form:2495 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:8/9/2002
Spud Date:7/13/2002Spud Date Is:ACTUAL
Measured TD:2495 ft.Measured PB depth:2483 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CDL, SIL, CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 215 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 70, Top: 0 ft., Bottom: 215 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2444 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 426, Top: 1120 ft., Bottom: 2444 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 1120 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1882 ft.NN
VERMEJO COAL1882 ft.2312 ft.NN
TRINIDAD2312 ft.2442 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 5/13/2010                 Interval Top: 2036 ft.    Interval Bottom: 2294 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:8/16/2002Choke Size: 
Formation Name:VERMEJO COALCommingled:No
Production Method:PUMPING
Open Hole Completion:No
Formation Treatment
Treatment Date:8/9/2002
Treatment Summary:DALTA FRAC PERFORATIONS: 2282'-88', 2290'-94' (40 SHOTS) FRAC 1ST STAGE: 550 BBL SLF, 571 SKS 16/30, 4.8 BBL HCL PERFORATIONS: 2245'-48', 2263'-66' (24 SHOTS) FRAC 2ND STAGE: 541 BBL SLF, 574 SKS 16/30, 0 BBL HCL. PERFORATIONS: 2209'-12' (12 SHOTS) FRAC 3RD STAGE: 336 BBL SLF, 351.5 SKS 16/30, 0 BBLS HCL. PERFORATIONS: 2036'-39', 2046'-49' (24 SHOTS) FRAC 4TH STAGE: 408 BBL SLF, 431 SKS 16/30, 0 BBL HCL
Tubing Size:2.875 in.Tubing Setting Depth:2337 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/16/2002Test Method:ORIFICE METER
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 262
BBLS_OIL 0
BTU_GAS 1000
CALC_BBLS_H2O 262
CALC_BBLS_OIL 0
CALC_MCF_GAS 31
CASING_PRESS 25
MCF_GAS 31
Perforation Data:
Interval Top:2036 ft.# Of Holes:100
Interval Bottom:2294 ft.Hole Size:4 in.

Formation RTONS                   Formation Classification:  GW                   Status:  CM - 8/6/2006                  Interval Top: 678 ft.    Interval Bottom: 1405 ft.

 Completed Information for Formation RATON SAND
1st Production Date:8/5/2006Choke Size: 
Formation Name:RATON SANDCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:7/18/2006
Treatment Summary:ACIDIZED W/2600 GALS 15% HCI ACID. FRAC'D W/171,187 GALS 20# DELTA 140 W/SANDWEDGE NT CARRYING 16,000# 16/30 AND 290,911# 12/20 BRADY SAND.
Tubing Size:2.875 in.Tubing Setting Depth:1497 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/6/2006Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 102
BBLS_OIL 0
BTU_GAS 1007
CALC_BBLS_H2O 102
CALC_BBLS_OIL 0
CALC_MCF_GAS 0
CASING_PRESS 5
GRAVITY_OIL 0.568
MCF_GAS 0
TUBING_PRESS 2
Perforation Data:
Interval Top:678 ft.# Of Holes:66
Interval Bottom:1405 ft.Hole Size:0.4 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 8/6/2006

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:8/5/2006Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RT-VJ.
No Perforation Data was found for formation RT-VJ.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)42504
GOR
GOR DeterminationMCFE
Average BOE per Day20.078
Average MCFE per Day116.456

 Federal Financial Assurance  i 

 Tribal Well  i No