Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07588
Well Classification: CBM Status: PR - 8/6/2006
Well Name/No:HILL RANCH #10-09V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/6/2006
FacilityID:262940LocationID:308147
County:LAS ANIMAS #071Location:NESE 10 35S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8042 ft.
Basin:RATON BASIN  
Planned Location:2383FSL  358 FELLat/Long: 37.011035 / -104.867218Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.011050 / -104.867190Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 8/6/2006             Measured TD: 2495 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 8/6/2006
Wellbore Permit
Permit #:20020434 Expiration Date:3/4/2003
Proposed Depth/Form:2495 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:8/9/2002
Spud Date:7/13/2002Spud Date Is:ACTUAL
Measured TD:2495 ft.Measured PB depth:2483 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CDL, SIL, CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 215 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 70, Top: 0 ft., Bottom: 215 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2444 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 426, Top: 1120 ft., Bottom: 2444 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 1120 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1882 ft.NN
VERMEJO COAL1882 ft.2312 ft.NN
TRINIDAD2312 ft.2442 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 5/13/2010                 Interval Top: 2036 ft.    Interval Bottom: 2294 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:8/16/2002Choke Size: 
Formation Name:VERMEJO COALCommingled:No
Production Method:PUMPING
Open Hole Completion:No
Formation Treatment
Treatment Date:8/9/2002
Treatment Summary:DALTA FRAC PERFORATIONS: 2282'-88', 2290'-94' (40 SHOTS) FRAC 1ST STAGE: 550 BBL SLF, 571 SKS 16/30, 4.8 BBL HCL PERFORATIONS: 2245'-48', 2263'-66' (24 SHOTS) FRAC 2ND STAGE: 541 BBL SLF, 574 SKS 16/30, 0 BBL HCL. PERFORATIONS: 2209'-12' (12 SHOTS) FRAC 3RD STAGE: 336 BBL SLF, 351.5 SKS 16/30, 0 BBLS HCL. PERFORATIONS: 2036'-39', 2046'-49' (24 SHOTS) FRAC 4TH STAGE: 408 BBL SLF, 431 SKS 16/30, 0 BBL HCL
Tubing Size:2.875 in.Tubing Setting Depth:2337 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/16/2002Test Method:ORIFICE METER
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 262
BBLS_OIL 0
BTU_GAS 1000
CALC_BBLS_H2O 262
CALC_BBLS_OIL 0
CALC_MCF_GAS 31
CASING_PRESS 25
MCF_GAS 31
Perforation Data:
Interval Top:2036 ft.# Of Holes:100
Interval Bottom:2294 ft.Hole Size:4 in.

Formation RTONS                   Formation Classification:  GW                   Status:  CM - 8/6/2006                  Interval Top: 678 ft.    Interval Bottom: 1405 ft.

 Completed Information for Formation RATON SAND
1st Production Date:8/5/2006Choke Size: 
Formation Name:RATON SANDCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:7/18/2006
Treatment Summary:ACIDIZED W/2600 GALS 15% HCI ACID. FRAC'D W/171,187 GALS 20# DELTA 140 W/SANDWEDGE NT CARRYING 16,000# 16/30 AND 290,911# 12/20 BRADY SAND.
Tubing Size:2.875 in.Tubing Setting Depth:1497 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/6/2006Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 102
BBLS_OIL 0
BTU_GAS 1007
CALC_BBLS_H2O 102
CALC_BBLS_OIL 0
CALC_MCF_GAS 0
CASING_PRESS 5
GRAVITY_OIL 0.568
MCF_GAS 0
TUBING_PRESS 2
Perforation Data:
Interval Top:678 ft.# Of Holes:66
Interval Bottom:1405 ft.Hole Size:0.4 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 8/6/2006

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:8/5/2006Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RT-VJ.
No Perforation Data was found for formation RT-VJ.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
July 2024 - June 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)42852
GOR
GOR DeterminationMCFE
Average BOE per Day20.244
Average MCFE per Day117.401

 Federal Financial Assurance  i 

 Tribal Well  i No