Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07577
Well Classification: CBM Status: PR - 11/15/2009
Well Name/No:HILL RANCH #16-07V-2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/15/2009
FacilityID:262853LocationID:308139
County:LAS ANIMAS #071Location:SWNE 16 35S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8121 ft.
Basin:RATON BASIN  
Planned Location:2475FNL  2309 FELLat/Long: 36.997725 / -104.891969Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 36.997720 / -104.891950Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 11/15/2009             Measured TD: 2485 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 11/15/2009
Wellbore Permit
Permit #:20020151 Expiration Date:2/24/2003
Proposed Depth/Form:2495 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:4/4/2002
Spud Date:3/10/2002Spud Date Is:ACTUAL
Measured TD:2485 ft.Measured PB depth:2336 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage:  FL   FL
Bottom Hole Location:Sec: Twp: Footage:  FL   FL
Log Types:CDL, SIL, C B L
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 207 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 60, Top: 0 ft., Bottom: 207 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2469 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 347, Top: 0 ft., Bottom: 2469 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2055 ft.NN
VERMEJO COAL2055 ft.2345 ft.NN
TRINIDAD2345 ft.2440 ft.NN
PIERRE2440 ft.2485 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 12/14/2010                Interval Top: 2080 ft.    Interval Bottom: 2338 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:4/18/2002Choke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/23/2009
Treatment Summary:ACIDIZED W/1,500 GALS 15% HCI ACID. REFRAC'D W/77,970 GALS 20# DELTA 140 S/SANDWEDGE OS CARRYING 8,456# 16/30 BRADY SD & 130,699# 12/20 BRADY SD.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 30
BBLS_OIL 0
CALC_BBLS_H2O 30
CALC_BBLS_OIL 0
CALC_MCF_GAS 2
CASING_PRESS 25
MCF_GAS 2
Perforation Data:
Interval Top:2080 ft.# Of Holes:
Interval Bottom:2338 ft.Hole Size:

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 11/15/2009                Interval Top: 480 ft.    Interval Bottom: 2338 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:11/11/2009Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/4/2002
Treatment Summary:
Tubing Size:2.875 in.Tubing Setting Depth:2371 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/15/2009Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 128
BBLS_OIL 0
BTU_GAS 1009
CALC_BBLS_H2O 128
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 27
CASING_PRESS 31
MCF_GAS 27
TUBING_PRESS 4
Perforation Data:
Interval Top:480 ft.# Of Holes:
Interval Bottom:2338 ft.Hole Size:

Formation RTON                     Formation Classification:  GW                     Status:  CM - 3/8/2010                  Interval Top: 480 ft.    Interval Bottom: 1418 ft.

 Completed Information for Formation RATON COAL
1st Production Date:11/11/2009Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/3/2009
Treatment Summary:ACIDIZED W/4000 GALS 15% HCI ACID. FRAC'D W/164,674 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 26874# 16/30 BRADY SD & 303,969# 12/20 BRADY SD.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:480 ft.# Of Holes:100
Interval Bottom:1418 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)29463
GOR
GOR DeterminationMCFE
Average BOE per Day13.922
Average MCFE per Day80.746

 Federal Financial Assurance  i 

 Tribal Well  i No