Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07577
Well Classification: CBM Status: PR - 11/15/2009
Well Name/No:HILL RANCH #16-07V-2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/15/2009
FacilityID:262853LocationID:308139
County:LAS ANIMAS #071Location:SWNE 16 35S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8121 ft.
Basin:RATON BASIN  
Planned Location:2475FNL  2309 FELLat/Long: 36.997725 / -104.891969Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 36.997720 / -104.891950Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 11/15/2009             Measured TD: 2485 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 11/15/2009
Wellbore Permit
Permit #:20020151 Expiration Date:2/24/2003
Proposed Depth/Form:2495 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:4/4/2002
Spud Date:3/10/2002Spud Date Is:ACTUAL
Measured TD:2485 ft.Measured PB depth:2336 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage:  FL   FL
Bottom Hole Location:Sec: Twp: Footage:  FL   FL
Log Types:CDL, SIL, C B L
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 207 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 60, Top: 0 ft., Bottom: 207 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2469 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 347, Top: 0 ft., Bottom: 2469 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2055 ft.NN
VERMEJO COAL2055 ft.2345 ft.NN
TRINIDAD2345 ft.2440 ft.NN
PIERRE2440 ft.2485 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 12/14/2010                Interval Top: 2080 ft.    Interval Bottom: 2338 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:4/18/2002Choke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/23/2009
Treatment Summary:ACIDIZED W/1,500 GALS 15% HCI ACID. REFRAC'D W/77,970 GALS 20# DELTA 140 S/SANDWEDGE OS CARRYING 8,456# 16/30 BRADY SD & 130,699# 12/20 BRADY SD.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 30
BBLS_OIL 0
CALC_BBLS_H2O 30
CALC_BBLS_OIL 0
CALC_MCF_GAS 2
CASING_PRESS 25
MCF_GAS 2
Perforation Data:
Interval Top:2080 ft.# Of Holes:
Interval Bottom:2338 ft.Hole Size:

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 11/15/2009                Interval Top: 480 ft.    Interval Bottom: 2338 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:11/11/2009Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/4/2002
Treatment Summary:
Tubing Size:2.875 in.Tubing Setting Depth:2371 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/15/2009Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 128
BBLS_OIL 0
BTU_GAS 1009
CALC_BBLS_H2O 128
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 27
CASING_PRESS 31
MCF_GAS 27
TUBING_PRESS 4
Perforation Data:
Interval Top:480 ft.# Of Holes:
Interval Bottom:2338 ft.Hole Size:

Formation RTON                     Formation Classification:  GW                     Status:  CM - 3/8/2010                  Interval Top: 480 ft.    Interval Bottom: 1418 ft.

 Completed Information for Formation RATON COAL
1st Production Date:11/11/2009Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/3/2009
Treatment Summary:ACIDIZED W/4000 GALS 15% HCI ACID. FRAC'D W/164,674 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 26874# 16/30 BRADY SD & 303,969# 12/20 BRADY SD.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:480 ft.# Of Holes:100
Interval Bottom:1418 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)30058
GOR
GOR DeterminationMCFE
Average BOE per Day14.201
Average MCFE per Day82.359

 Federal Financial Assurance  i 

 Tribal Well  i No