Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07571
Well Classification: CBM Status: PR - 7/15/2011
Well Name/No:HILL RANCH #15-03V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/15/2011
FacilityID:262791LocationID:308133
County:LAS ANIMAS #071Location:NENW 15 35S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8109 ft.
Basin:RATON BASIN  
Planned Location:1192FNL  2444 FWLLat/Long: 37.001225 / -104.875698Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.001220 / -104.875730Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/10/2011
End Date: 6/10/2011
Reported: 4/17/2012
Prior to rule 205A.b.(2)(A)
Days to report: 312
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 7/15/2011             Measured TD: 2525 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 7/15/2011
Wellbore Permit
Permit #:20020149 Expiration Date:2/17/2003
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:4/10/2002
Spud Date:3/12/2002Spud Date Is:ACTUAL
Measured TD:2525 ft.Measured PB depth:2465 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CDL, SIL, CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 212 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 212, Top: 0 ft., Bottom: 212 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2347 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 385, Top: 0 ft., Bottom: 2347 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2076 ft.NN
VERMEJO COAL2076 ft.2385 ft.NN
TRINIDAD2385 ft.2515 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 4/18/2002                 Interval Top: 2099 ft.    Interval Bottom: 2346 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:4/18/2002Choke Size: 
Formation Name:VERMEJO COALCommingled:
Production Method:PUMPING(30NO095-PC)
Open Hole Completion:
Formation Treatment
Treatment Date:4/10/2002
Treatment Summary:DELTA FRAC PERFORATIONS: 2338'-46' ( 36 SHOTS) FRAC 1ST STAGE: 451 BBL SLF, 497 SKS 16/30, 4.8 BBL HCL PERFORATIONS: 2264'-67', 2289'-95' (36 SHOTS) FRAC 2ND STAGE: 323 BBL SLF, 355 SKS 16/30, 4.8 BBL HCL PERFORATIONS : 2166'-69', 2190'-93' (40 SHOTS) FRAC 3RD STAGE: 320 BBL SLF, 358 SKS 16/30, 3.6 BBL HCL PERFORATIONS: 2099'-02', 2113'-16' (24 SHOTS) FRAC 4TH STAGE: 323 BBL SLF, 344 SKS 16/30, 3.6 BBL HCL
Tubing Size:2.875 in.Tubing Setting Depth:2370 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/18/2002Test Method:ORIFICE METER
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 262
BBLS_OIL 0
BTU_GAS 1000
CALC_BBLS_H2O 262
CALC_BBLS_OIL 0
CALC_MCF_GAS 31
CASING_PRESS 25
MCF_GAS 31
Perforation Data:
Interval Top:2099 ft.# Of Holes:136
Interval Bottom:2346 ft.Hole Size:4 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 7/15/2011                 Interval Top: 722 ft.    Interval Bottom: 2346 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:7/6/2011Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.875 in.Tubing Setting Depth:2397 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/15/2011Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 42
BTU_GAS 1006
CALC_BBLS_H2O 42
CALC_MCF_GAS 113
CASING_PRESS 88
MCF_GAS 113
TUBING_PRESS 2
Perforation Data:
Interval Top:722 ft.# Of Holes:187
Interval Bottom:2346 ft.Hole Size:0.42 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 8/11/2011                 Interval Top: 722 ft.    Interval Bottom: 1440 ft.

 Completed Information for Formation RATON COAL
1st Production Date:7/6/2011Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/10/2011
Treatment Summary:Acidized w/2,000 gals 15% HCl acid. Frac'd w/100,205 gals 20# Delta 140 w/Sandwedge OS carrying 252,255# 16/30 Nebraska sd.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:722 ft.# Of Holes:51
Interval Bottom:1440 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)29573
GOR
GOR DeterminationMCFE
Average BOE per Day13.974
Average MCFE per Day81.060

 Federal Financial Assurance  i 

 Tribal Well  i No