Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07568
Well Classification: CBM Status: PR - 6/11/2012
Well Name/No:HILL RANCH #18-01V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/11/2012
FacilityID:262627LocationID:308131
County:LAS ANIMAS #071Location:NENE 18 35S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8614 ft.
Basin:RATON BASIN  
Planned Location:601FNL  884 FELLat/Long: 37.002895 / -104.923250Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.002910 / -104.923210Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/5/2012
End Date: 6/5/2012
Reported: 7/2/2012
Days to report: 27
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 6/11/2012             Measured TD: 2920 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 6/11/2012
Wellbore Permit
Permit #:20020150 Expiration Date:2/4/2003
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:4/16/2002
Spud Date:3/5/2002Spud Date Is:ACTUAL
Measured TD:2920 ft.Measured PB depth:2825 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CDL, SIL, CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 697 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 190, Top: 0 ft., Bottom: 697 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2846 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 980 ft., Bottom: 2846 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: 90, Top: 0 ft., Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2495 ft.NN
VERMEJO COAL2495 ft.2790 ft.NN
TRINIDAD2790 ft.2880 ft.NN
PIERRE2880 ft.2920 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 7/16/2012                 Interval Top: 2500 ft.    Interval Bottom: 2738 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:4/19/2002Choke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:10/3/2012Treatment End Date:N/A
Treatment Summary:Status Change Only
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:4/16/2002
Treatment Summary:DELTA FRAC PERFORATIONS: 2711'-16', 2734'-38' (4 SPF. 40 HOLES) FRAC 1ST STAGE: 35,326 20# GEL, 49,000# 16/30 , N2 N/A, 50 GAL. HCL PERFORATIONS: 2653'-58', 2661'-64' (4 SPF. 32 HOLES) FRAC 2ND STAGE: 26, 441 20# GEL, 35,000# 16/30, N2 N/A, 50 GAL. HCL PERFORATIONS: 2564'-67', 2573'-76' (4 SPF. 24 HOLES) FRAC 3RD STAGE: 26,441 20# GEL, 35,000# 16/30, N2 N/A, 50 GAL HCL PERFORATIONS: 2500'-04' (4 SPF. 16 HOLES) FRAC 4TH STAGE: 26,441 20# GEL, 35,000# 16/30, N2 N/A, 50 GAL HCL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 142
BBLS_OIL 0
BTU_GAS 1000
CALC_BBLS_H2O 142
CALC_MCF_GAS 82
CASING_PRESS 25
MCF_GAS 82
Perforation Data:
Interval Top:2500 ft.# Of Holes:112
Interval Bottom:2738 ft.Hole Size:4 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 6/11/2012                 Interval Top: 818 ft.    Interval Bottom: 2738 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:6/19/2012Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:
Tubing Size:2.875 in.Tubing Setting Depth:2794 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/11/2012Test Method:FLowing
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1001
CALC_BBLS_H2O 78
CALC_MCF_GAS 86
CASING_PRESS 65
GRAVITY_OIL 1
TUBING_PRESS 30
Perforation Data:
Interval Top:818 ft.# Of Holes:169
Interval Bottom:2738 ft.Hole Size:

Formation RTON                     Formation Classification:  GW                     Status:  CM - 10/3/2012                 Interval Top: 818 ft.    Interval Bottom: 1770 ft.

 Completed Information for Formation RATON COAL
1st Production Date:6/19/2012Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/4/2012Treatment End Date:6/5/2012
Treatment Summary:Acidized w/2500 gals 15% HCl acid. Frac'd w/166,991 gals 20# Delta 140 w/sandwedge OS carrying 299,343# 16/30 Brady sand.
Total fluid used in treatment (bbls):3976Max pressure during treatment (psi):2379
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:2
Total acid used in treatment (bbls):60Min frac gradient (psi/ft):0.66
Recycled water used in treatment (bbls):3977Total flowback volume recovered (bbls):12195
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):299343Green completions techniques utilized:No
Reason green techniques Not utilized: PRESSURE
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:818 ft.# Of Holes:57
Interval Bottom:1770 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)18211
GOR
GOR DeterminationMCFE
Average BOE per Day8.604
Average MCFE per Day49.886

 Federal Financial Assurance  i 

 Tribal Well  i No