Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07567
Well Classification: CBM Status: PR - 12/21/2007
Well Name/No:HILL RANCH #16-12V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/21/2007
FacilityID:262626LocationID:308130
County:LAS ANIMAS #071Location:NWSW 16 35S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8237 ft.
Basin:RATON BASIN  
Planned Location:1971FSL  679 FWLLat/Long: 36.995435 / -104.899809Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 36.995450 / -104.899760Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 12/21/2007             Measured TD: 2575 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 12/21/2007
Wellbore Permit
Permit #:20020152 Expiration Date:2/4/2003
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:3/20/2002
Spud Date:3/8/2002Spud Date Is:ACTUAL
Measured TD:2575 ft.Measured PB depth:2556 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage:  FL   FL
Bottom Hole Location:Sec: Twp: Footage:  FL   FL
Log Types:CDL, SIL, CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 224 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 60, Top: 0 ft., Bottom: 224 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2533 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 395, Top: 394 ft., Bottom: 2533 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2130 ft.NN
VERMEJO COAL2130 ft.2445 ft.NN
TRINIDAD2445 ft.2535 ft.NN
PIERRE2535 ft.2575 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 4/19/2002                 Interval Top: 2172 ft.    Interval Bottom: 2434 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:4/19/2002Choke Size: 
Formation Name:VERMEJO COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/1/2002
Treatment Summary:1ST STG: 21,214-DELTA FRAC; 36,290 SD., N2 N/A, 150 GAL HCL. 2ND STG: 17,428 DELTA FRAC. 28,900 SD. N2 N/A 150 GAL HCL. 3RD STG. 17,290 DELTA FRAC. 28,460 SD, N2 N/A, 150 GAL HCL. 4TH STG. 17,447 DELTA FRAC, 29630 SD N2 N/A 10 GAL HCL
Tubing Size:2.875 in.Tubing Setting Depth:2461 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/19/2002Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 38
BBLS_OIL 0
BTU_GAS 1000
CALC_BBLS_H2O 38
CALC_BBLS_OIL 0
CALC_MCF_GAS 3
CASING_PRESS 25
GRAVITY_OIL 0
MCF_GAS 3
TUBING_PRESS 0
Perforation Data:
Interval Top:2172 ft.# Of Holes:124
Interval Bottom:2434 ft.Hole Size:4 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 1/10/2007                 Interval Top: 850 ft.    Interval Bottom: 1423 ft.

 Completed Information for Formation RATON COAL
1st Production Date:12/21/2007Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/12/2006
Treatment Summary:ACIDIZED W/4500 GALS 15% HCL ACID. FRAC'D W/165,819 GALS 20# DELTA 140 W/SANDWEDGE NT CARRYING 20,600# 16/30 AND 344,402# 12/20 BRADY SAND.
Tubing Size:2.875 in.Tubing Setting Depth:1606 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/10/2007Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 74
BBLS_OIL 0
BTU_GAS 997
CALC_BBLS_H2O 74
CALC_BBLS_OIL 0
CALC_MCF_GAS 7
CASING_PRESS 5
MCF_GAS 7
TUBING_PRESS 4
Perforation Data:
Interval Top:850 ft.# Of Holes:88
Interval Bottom:1423 ft.Hole Size:0.45 in.

Formation RT-VJ                   Formation Classification:                     Status:  PR - 12/21/2007

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:12/21/2007Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RT-VJ.
No Perforation Data was found for formation RT-VJ.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)25700
GOR
GOR DeterminationMCFE
Average BOE per Day12.140
Average MCFE per Day70.415

 Federal Financial Assurance  i 

 Tribal Well  i No