Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07562
Well Classification: CBM Status: SI - 6/1/2018
Well Name/No:APACHE CANYON #08-04R
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date6/1/2018
FacilityID:262545LocationID:312087
County:LAS ANIMAS #071Location:NWNW 8 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7558 ft.
Basin:RATON BASIN  
Planned Location:1016FNL  583 FWLLat/Long: 37.103233 / -104.918300Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.103220 / -104.918300Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: SI - 6/1/2018             Measured TD: 1077 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        SI - 6/1/2018
Wellbore Permit
Permit #:20020130 Expiration Date:1/23/2003
Proposed Depth/Form:2000 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:2/23/2002
Spud Date:2/4/2002Spud Date Is:ACTUAL
Measured TD:1077 ft.Measured PB depth:1075 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage:  FL   FL
Bottom Hole Location:Sec: Twp: Footage:  FL   FL
Log Types:CDL, SIL, CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 334 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 334 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 1053 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 160, Top: 0 ft., Bottom: 1053 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1046 ft.NN

Formation RTON                     Formation Classification:  GW                     Status:  SI - 6/1/2018                  Interval Top: 532 ft.    Interval Bottom: 764 ft.

 Completed Information for Formation RATON COAL
1st Production Date:N/AChoke Size: 
Formation Name:RATON COALCommingled:No
Production Method:20N095 PC PUMP
Open Hole Completion:No
Formation Treatment
Treatment Date:2/23/2002
Treatment Summary:PERFORATIONS: 750'-56', 761'-64' (36 PERFS) FRAC 1ST STAGE W/ 13,599 BBLS FRAC FLUID, 8,296 SLF, 22,700# 16/30 BRADY SAND. PERFORATIONS: 676'-80', 704'-08' (32 PERFS) FRAC 2ND STAGE W/ 31,104 BBLS FRAC FLUID, 20,413 SLF, 51,340# 16/30 BRADY SAND. PERFORATIONS: 532'-39' (28 PERFS) FRAC 3RD STAGE W/ 26,186 BBLS FRAC FLUID, 17,096 SLF, 41,860# 16/30 BRADY SAND.
Tubing Size:2.875 in.Tubing Setting Depth:793 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/9/2002Test Method:
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:
Test TypeMeasure
BBLS_H2O 15
BBLS_OIL 0
CALC_BBLS_H2O 15
CALC_BBLS_OIL 0
CALC_MCF_GAS 0
MCF_GAS 0
Perforation Data:
Interval Top:532 ft.# Of Holes:96
Interval Bottom:764 ft.Hole Size:4 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2028
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
04/30/2018
Low ProducingYProduction Period
10/2024 - 09/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No