Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07560
Well Classification: CBM Status: PR - 4/1/2024
Well Name/No:APACHE CANYON #10-16V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/1/2024
FacilityID:262543LocationID:308128
County:LAS ANIMAS #071Location:SESE 10 34S68W 6
Field:PURGATOIRE RIVER - #70830Elevation:8597 ft.
Basin:RATON BASIN  
Planned Location:707FSL  1277 FELLat/Long: 37.093203 / -104.978262Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.093230 / -104.978280Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 4/1/2024             Measured TD: 2448 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 4/1/2024
Wellbore Permit
Permit #:20020129 Expiration Date:1/23/2003
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:3/11/2002
Spud Date:2/15/2002Spud Date Is:ACTUAL
Measured TD:2448 ft.Measured PB depth:2446 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CDL, SIL, CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 545 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 150, Top: 0 ft., Bottom: 545 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2445 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 370, Top: 210 ft., Bottom: 2445 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2072 ft.NN
VERMEJO COAL2072 ft.2390 ft.NN
TRINIDAD2390 ft.2480 ft.NN
PIERRE2480 ft.2515 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 3/24/2002                 Interval Top: 2108 ft.    Interval Bottom: 2374 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:3/24/2002Choke Size: 
Formation Name:VERMEJO COALCommingled:
Production Method:30NO45 PC PUMP
Open Hole Completion:
Formation Treatment
Treatment Date:3/11/2002
Treatment Summary:SEE SCANNED DOC# 1336307
Tubing Size:2.875 in.Tubing Setting Depth:2391 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/24/2002Test Method:
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:
Test TypeMeasure
BBLS_H2O 65
CALC_BBLS_H2O 65
CALC_MCF_GAS 5
MCF_GAS 5
Perforation Data:
Interval Top:2108 ft.# Of Holes:160
Interval Bottom:2374 ft.Hole Size:4 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 6/25/2006                 Interval Top: 923 ft.    Interval Bottom: 1248 ft.

 Completed Information for Formation RATON COAL
1st Production Date:6/24/2006Choke Size: 
Formation Name:RATON COALCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:6/9/2006
Treatment Summary:ACIDIZED W/1600 GALS 15% HCL ACID. FRAC'D W/178,774 GALS 20# DELTA 140 W/SANDWEDGE NT CARRYING 13,700# 16/30 AND 233,031# 12/20 BRADY SAND.
Tubing Size:2.875 in.Tubing Setting Depth:1340 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/25/2006Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 42
BBLS_OIL 0
BTU_GAS 1089.7
CALC_BBLS_H2O 42
CALC_BBLS_OIL 0
CALC_MCF_GAS 0
GRAVITY_OIL 0.632
MCF_GAS 0
TUBING_PRESS 2
Perforation Data:
Interval Top:923 ft.# Of Holes:60
Interval Bottom:1248 ft.Hole Size:0.41 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 4/1/2024

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:6/24/2006Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RT-VJ.
No Perforation Data was found for formation RT-VJ.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)13162
GOR
GOR DeterminationMCFE
Average BOE per Day6.223
Average MCFE per Day36.086

 Federal Financial Assurance  i 

 Tribal Well  i No