|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 9/4/2007 Measured TD: 1795 ft. Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 9/4/2007 | Wellbore Permit | | Permit #: | 20074360 | Expiration Date: | 10/8/2008 | Proposed Depth/Form: | 1786 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | STATE | Unit: | | Unit Number: | | Formation And Spacing: | Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 3/29/2002 | Spud Date: | 2/28/2002 | Spud Date Is: | ACTUAL | Measured TD: | 1795 ft. | Measured PB depth: | 1786 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | CDL, SIL, CBL | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 212 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 60, Top: 0 ft., Bottom: 212 ft., Determination Method: | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 1772 ft., Weight: 15.5 , Citings Type: ACTUAL | Cement: | Sacks: 275, Top: 0 ft., Bottom: 1772 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | RATON COAL | 0 ft. | 1330 ft. | N | N | VERMEJO COAL | 1330 ft. | 1657 ft. | N | N | TRINIDAD | 1657 ft. | 1765 ft. | N | N |
Formation VRMJ Formation Classification: GW Status: CM - 4/10/2008 Interval Top: 1337 ft. Interval Bottom: 1502 ft. Completed Information for Formation VERMEJO COAL | 1st Production Date: | 4/10/2002 | Choke Size: | | Formation Name: | VERMEJO COAL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/10/2002 | Treatment Summary: | FRAC'D W/73,360 BBLS FRAC FLUID, 47,681 SLF, 120,660# 16/30 BRADY SAND. |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1526 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/10/2008 | Test Method: | PUMPING | Hours Tested: | 24 | Gas Type: | COAL GAS | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 16 | BBLS_OIL | 0 | BTU_GAS | 983 | CALC_BBLS_H2O | 16 | CALC_BBLS_OIL | 0 | CALC_MCF_GAS | 1 | CASING_PRESS | 0 | MCF_GAS | 1 | TUBING_PRESS | 0 |
| Perforation Data: | Interval Top: | 1337 ft. | # Of Holes: | 92 | Interval Bottom: | 1502 ft. | Hole Size: | 4 in. |
|
Formation RTON Formation Classification: GW Status: CM - 9/4/2007 Interval Top: 421 ft. Interval Bottom: 557 ft. Completed Information for Formation RATON COAL | 1st Production Date: | 9/2/2007 | Choke Size: | | Formation Name: | RATON COAL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/23/2007 | Treatment Summary: | ACIDIZED W/1250 GALS HCL ACID. FRAC'D W/62,220 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 7700# 16/30 SAND AND 144,500# 12/20 BRADY SAND. |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1606 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/4/2007 | Test Method: | PUMPING | Hours Tested: | 24 | Gas Type: | COAL GAS | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 24 | BBLS_OIL | 0 | BTU_GAS | 1006 | CALC_BBLS_H2O | 24 | CALC_BBLS_OIL | 0 | CALC_MCF_GAS | 0 | CASING_PRESS | 0 | GRAVITY_OIL | 1 | MCF_GAS | 0 | TUBING_PRESS | 3 |
| Perforation Data: | Interval Top: | 421 ft. | # Of Holes: | 27 | Interval Bottom: | 557 ft. | Hole Size: | 0.45 in. |
|
Formation RT-VJ Formation Classification: GW Status: PR - 9/4/2007 Completed Information for Formation RATON-VERMEJO COALS | 1st Production Date: | 9/4/2007 | Choke Size: | | Formation Name: | RATON-VERMEJO COALS | Commingled: | | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation RT-VJ. |
| No Perforation Data was found for formation RT-VJ. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 10746 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 5.085 |
Average MCFE per Day | 29.474 |
Federal Financial Assurance | i | |
|
|