Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07447
Well Classification: CBM Status: PR - 6/28/2012
Well Name/No:HILL RANCH #04-02V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/28/2012
FacilityID:260479LocationID:308049
County:LAS ANIMAS #071Location:NWNE 4 35S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7975 ft.
Basin:RATON BASIN  
Planned Location:204FNL  1607 FELLat/Long: 37.032954 / -104.889579Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.032970 / -104.889560Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/8/2012
End Date: 6/8/2012
Reported: 7/2/2012
Days to report: 24
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 6/28/2012             Measured TD: 2455 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 6/28/2012
Wellbore Permit
Permit #:20011215 Expiration Date:6/20/2002
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:10/24/2001
Spud Date:8/2/2001Spud Date Is:ACTUAL
Measured TD:2455 ft.Measured PB depth:2401 ft.
True Vertical TD:True Vertical PB depth:
Log Types:COMP. DENSITY/NEUTRON, SINGLE INDUCTION
Log Types:COMP. DENSITY/NEUTRON, SINGLE INDUCTION
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 515 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 145, Top: 0 ft., Bottom: 515 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2403 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 340, Top: 515 ft., Bottom: 2403 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2002 ft.NN
VERMEJO COAL2002 ft.2303 ft.NN
TRINIDAD2303 ft.2455 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 7/24/2012                 Interval Top: 2004 ft.    Interval Bottom: 2275 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:10/24/2001Choke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:10/3/2012Treatment End Date:N/A
Treatment Summary:REPORTING CHANGE IN FORMATION STATUS ONLY. NO TREATMENT DONE.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:10/24/2001
Treatment Summary:31,500# 16/30 SAND & 275 BBLS FLUID
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 217
BBLS_OIL 0
CALC_BBLS_H2O 217
CALC_BBLS_OIL 0
CALC_MCF_GAS 286
CASING_PRESS 45
MCF_GAS 286
Perforation Data:
Interval Top:2004 ft.# Of Holes:136
Interval Bottom:2275 ft.Hole Size:0.51 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 6/28/2012                 Interval Top: 577 ft.    Interval Bottom: 2275 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:6/26/2012Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.875 in.Tubing Setting Depth:2331 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/28/2012Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1034
CALC_BBLS_H2O 78
CALC_MCF_GAS 76
CASING_PRESS 43
GRAVITY_OIL 1
TUBING_PRESS 12
Perforation Data:
Interval Top:577 ft.# Of Holes:220
Interval Bottom:2275 ft.Hole Size:

Formation RTON                     Formation Classification:  GW                     Status:  CM - 10/3/2012                 Interval Top: 577 ft.    Interval Bottom: 1426 ft.

 Completed Information for Formation RATON COAL
1st Production Date:6/26/2012Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/8/2012Treatment End Date:6/8/2012
Treatment Summary:Pumped 3,500 gals 15% HCl acid. Frac'd w/219,283 gals 20# Delta 140 w/sandwedge OS carrying 411,460# 16/30 Brady sand.
Total fluid used in treatment (bbls):5307Max pressure during treatment (psi):2582
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:4
Total acid used in treatment (bbls):84Min frac gradient (psi/ft):1.54
Recycled water used in treatment (bbls):5223Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):0Disposition method For flowback:
Total proppant used (lbs):411460Green completions techniques utilized:--
Reason green techniques Not utilized: PRESSURE
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:577 ft.# Of Holes:84
Interval Bottom:1426 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)85476
GOR
GOR DeterminationMCFE
Average BOE per Day40.373
Average MCFE per Day234.152

 Federal Financial Assurance  i 

 Tribal Well  i No