Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07447
Well Classification: CBM Status: PR - 6/28/2012
Well Name/No:HILL RANCH #04-02V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/28/2012
FacilityID:260479LocationID:308049
County:LAS ANIMAS #071Location:NWNE 4 35S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7975 ft.
Basin:RATON BASIN  
Planned Location:204FNL  1607 FELLat/Long: 37.032954 / -104.889579Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.032970 / -104.889560Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/8/2012
End Date: 6/8/2012
Reported: 7/2/2012
Days to report: 24
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 6/28/2012             Measured TD: 2455 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 6/28/2012
Wellbore Permit
Permit #:20011215 Expiration Date:6/20/2002
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:10/24/2001
Spud Date:8/2/2001Spud Date Is:ACTUAL
Measured TD:2455 ft.Measured PB depth:2401 ft.
True Vertical TD:True Vertical PB depth:
Log Types:COMP. DENSITY/NEUTRON, SINGLE INDUCTION
Log Types:COMP. DENSITY/NEUTRON, SINGLE INDUCTION
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 515 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 145, Top: 0 ft., Bottom: 515 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2403 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 340, Top: 515 ft., Bottom: 2403 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2002 ft.NN
VERMEJO COAL2002 ft.2303 ft.NN
TRINIDAD2303 ft.2455 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 7/24/2012                 Interval Top: 2004 ft.    Interval Bottom: 2275 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:10/24/2001Choke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:10/3/2012Treatment End Date:N/A
Treatment Summary:REPORTING CHANGE IN FORMATION STATUS ONLY. NO TREATMENT DONE.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:10/24/2001
Treatment Summary:31,500# 16/30 SAND & 275 BBLS FLUID
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 217
BBLS_OIL 0
CALC_BBLS_H2O 217
CALC_BBLS_OIL 0
CALC_MCF_GAS 286
CASING_PRESS 45
MCF_GAS 286
Perforation Data:
Interval Top:2004 ft.# Of Holes:136
Interval Bottom:2275 ft.Hole Size:0.51 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 6/28/2012                 Interval Top: 577 ft.    Interval Bottom: 2275 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:6/26/2012Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.875 in.Tubing Setting Depth:2331 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/28/2012Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1034
CALC_BBLS_H2O 78
CALC_MCF_GAS 76
CASING_PRESS 43
GRAVITY_OIL 1
TUBING_PRESS 12
Perforation Data:
Interval Top:577 ft.# Of Holes:220
Interval Bottom:2275 ft.Hole Size:

Formation RTON                     Formation Classification:  GW                     Status:  CM - 10/3/2012                 Interval Top: 577 ft.    Interval Bottom: 1426 ft.

 Completed Information for Formation RATON COAL
1st Production Date:6/26/2012Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/8/2012Treatment End Date:6/8/2012
Treatment Summary:Pumped 3,500 gals 15% HCl acid. Frac'd w/219,283 gals 20# Delta 140 w/sandwedge OS carrying 411,460# 16/30 Brady sand.
Total fluid used in treatment (bbls):5307Max pressure during treatment (psi):2582
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:4
Total acid used in treatment (bbls):84Min frac gradient (psi/ft):1.54
Recycled water used in treatment (bbls):5223Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):0Disposition method For flowback:
Total proppant used (lbs):411460Green completions techniques utilized:--
Reason green techniques Not utilized: PRESSURE
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:577 ft.# Of Holes:84
Interval Bottom:1426 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
July 2024 - June 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)85866
GOR
GOR DeterminationMCFE
Average BOE per Day40.554
Average MCFE per Day235.221

 Federal Financial Assurance  i 

 Tribal Well  i No