Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07445
Well Classification: CBM Status: PR - 2/28/2010
Well Name/No:HILL RANCH #09-07V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/28/2010
FacilityID:260477LocationID:308048
County:LAS ANIMAS #071Location:SWNE 9 35S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8210 ft.
Basin:RATON BASIN  
Planned Location:2473FNL  2542 FELLat/Long: 37.012225 / -104.892779Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.012170 / -104.892810Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 2/28/2010             Measured TD: 2608 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 2/28/2010
Wellbore Permit
Permit #:20011213 Expiration Date:6/20/2002
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:10/14/2001
Spud Date:7/28/2001Spud Date Is:ACTUAL
Measured TD:2608 ft.Measured PB depth:2605 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CDL,SIL,CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 668 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 185, Top: 0 ft., Bottom: 668 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2555 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 330, Top: 525 ft., Bottom: 2555 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2185 ft.NN
VERMEJO COAL2185 ft.2475 ft.NN
TRINIDAD2475 ft.2605 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 2/28/2010                 Interval Top: 2183 ft.    Interval Bottom: 2434 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:10/22/2001Choke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/11/2010
Treatment Summary:ACIDIZED WITH 1000 GALS 15% HCI ACID. REFRACD WITH 104517 GALS 20# DELTA 140 WITH SANDWEDGE OS CARRYING 7984# 16/30 BRADY SD AND 223507# 12/20 BRADY SD.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 241
BBLS_OIL 0
BTU_GAS 1000
CALC_BBLS_H2O 241
CALC_BBLS_OIL 0
CALC_MCF_GAS 95
CASING_PRESS 25
MCF_GAS 95
Perforation Data:
Interval Top:2183 ft.# Of Holes:160
Interval Bottom:2434 ft.Hole Size:0.4 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 2/28/2010                 Interval Top: 852 ft.    Interval Bottom: 2434 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:2/26/2010Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/14/2001
Treatment Summary:
Tubing Size:2.875 in.Tubing Setting Depth:2488 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/28/2010Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 111
BTU_GAS 1005
CALC_BBLS_H2O 111
CALC_MCF_GAS 90
CASING_PRESS 4
MCF_GAS 90
TUBING_PRESS 5
Perforation Data:
Interval Top:852 ft.# Of Holes:204
Interval Bottom:2434 ft.Hole Size:0.45 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 2/28/2010                 Interval Top: 852 ft.    Interval Bottom: 1470 ft.

 Completed Information for Formation RATON COAL
1st Production Date:2/26/2010Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/11/2010
Treatment Summary:ACIDIZED WITH 2200 GALS 15% HCI ACID. FRACD WITH 105955 GALS 20# DELTA 140 WITH SANDWEDGE OS CARRYING 22997# 16/30 BRADY SD AND 205200# 12/20 BRADY SD.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:852 ft.# Of Holes:44
Interval Bottom:1470 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)19262
GOR
GOR DeterminationMCFE
Average BOE per Day9.096
Average MCFE per Day52.772

 Federal Financial Assurance  i 

 Tribal Well  i No