Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07442
Well Classification: CBM Status: PR - 3/1/2022
Well Name/No:APACHE CANYON #17-07V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2022
FacilityID:260463LocationID:308046
County:LAS ANIMAS #071Location:SWNE 17 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7823 ft.
Planned Location:2047FNL  1592 FELLat/Long: 37.085893 / -104.907650Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.085900 / -104.907680Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 3/1/2022             Measured TD: 2275 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 3/1/2022
Wellbore Permit
Permit #:011206 Expiration Date:6/19/2002
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:9/19/2001
Spud Date:7/24/2001Spud Date Is:ACTUAL
Measured TD:2275 ft.Measured PB depth:2273 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CDL, SIL, CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 664 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 180, Top: 0 ft., Bottom: 664 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2260 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 280, Top: 92 ft., Bottom: 2260 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1780 ft.NN
VERMEJO COAL1780 ft.2137 ft.NN
TRINIDAD2137 ft.2275 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 8/20/2006                 Interval Top: 1788 ft.    Interval Bottom: 2062 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:10/10/2001Choke Size: 
Formation Name:VERMEJO COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/27/2006
Treatment Summary:ACIDIZED W/1100 GALS 15% HCL ACID. FRAC'D W/102,621 GALS 20# DELTA 140 W/SANDWEDGE NT CARRYING 12,500 16/30 & 163,174# 12/20 SAND.
Tubing Size:2.875 in.Tubing Setting Depth:2158 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/20/2006Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 55
BBLS_OIL 0
BTU_GAS 993
CALC_BBLS_H2O 55
CALC_MCF_GAS 31
CASING_PRESS 0
GRAVITY_OIL 1
MCF_GAS 31
TUBING_PRESS 6
Perforation Data:
Interval Top:1788 ft.# Of Holes:30
Interval Bottom:2062 ft.Hole Size:0.46 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 3/1/2022                  Interval Top: 674 ft.    Interval Bottom: 2062 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:7/23/2010Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.875 in.Tubing Setting Depth:2125 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/27/2010Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 86
BTU_GAS 1007
CALC_BBLS_H2O 86
CALC_MCF_GAS 91
CASING_PRESS 17
MCF_GAS 91
TUBING_PRESS 3
Perforation Data:
Interval Top:674 ft.# Of Holes:161
Interval Bottom:2062 ft.Hole Size:0.45 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 2/18/2011                 Interval Top: 674 ft.    Interval Bottom: 1060 ft.

 Completed Information for Formation RATON COAL
1st Production Date:7/23/2010Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/15/2010
Treatment Summary:Acidized w/2,200 gals 15% HCl acid. Frac'd w/133,679 gals 20# Delta 140 w/Sandwedge OS carrying 18,293# 16/30 Brady sd & 286,730# 12/20 Brady sd.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:674 ft.# Of Holes:63
Interval Bottom:1060 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)15943
GOR
GOR DeterminationMCFE
Average BOE per Day7.515
Average MCFE per Day43.585

 Federal Financial Assurance  i 

 Tribal Well  i No