Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07437
Well Classification: CBM Status: PR - 5/1/2021
Well Name/No:APACHE CANYON #11-12V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2021
FacilityID:260445LocationID:308043
County:LAS ANIMAS #071Location:NWSW 11 34S68W 6
Field:PURGATOIRE RIVER - #70830Elevation:8170 ft.
Planned Location:1433FSL  648 FWLLat/Long: 37.095243 / -104.971672Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.095190 / -104.971650Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/11/2011
End Date: 7/11/2011
Reported: 4/16/2012
Prior to rule 205A.b.(2)(A)
Days to report: 280
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 5/1/2021             Measured TD: 1998 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 5/1/2021
Wellbore Permit
Permit #:20011194 Expiration Date:6/19/2002
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:3/29/2002
Spud Date:2/23/2002Spud Date Is:ACTUAL
Measured TD:1998 ft.Measured PB depth:1996 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CDL, SIL, CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 273 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 75, Top: 0 ft., Bottom: 273 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 1981 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 310, Top: 0 ft., Bottom: 1981 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1520 ft.NN
VERMEJO COAL1520 ft.1866 ft.NN
TRINIDAD1866 ft.1984 ft.NN
PIERRE1984 ft.2005 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 8/24/2011                 Interval Top: 1574 ft.    Interval Bottom: 1868 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:3/29/2002Choke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/11/2011
Treatment Summary:Acidized w/2,000 gals 15% HCl acid. Refrac'd w/53,632 gals 20# Delta 140 w/Sandwedge OS carrying 180,800# 16/30 Nebraska sd.
Formation Treatment
Treatment Date:3/29/2002
Treatment Summary:SEE SCANNED DOC# 1336301
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 0
CALC_BBLS_H2O 1
CALC_MCF_GAS 4
MCF_GAS 4
Perforation Data:
Interval Top:1574 ft.# Of Holes:152
Interval Bottom:1868 ft.Hole Size:0.51 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 5/1/2021                  Interval Top: 376 ft.    Interval Bottom: 1868 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:8/3/2011Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.875 in.Tubing Setting Depth:1902 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/15/2011Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 11
BTU_GAS 944
CALC_BBLS_H2O 11
CALC_MCF_GAS 55
MCF_GAS 55
TUBING_PRESS 1
Perforation Data:
Interval Top:376 ft.# Of Holes:248
Interval Bottom:1868 ft.Hole Size:0.42 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 8/24/2011                 Interval Top: 376 ft.    Interval Bottom: 693 ft.

 Completed Information for Formation RATON COAL
1st Production Date:8/3/2011Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/12/2011
Treatment Summary:Acidized w/2,100 gals 15% HCl acid. Frac'd w/106,395 gals 20# Delta 140 w/Sandwedge OS carrying 373,800# 16/30 Nebraska sd.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:376 ft.# Of Holes:96
Interval Bottom:693 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)22592
GOR
GOR DeterminationMCFE
Average BOE per Day10.685
Average MCFE per Day61.977

 Federal Financial Assurance  i 

 Tribal Well  i No