Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07437
Well Classification: CBM Status: PR - 5/1/2021
Well Name/No:APACHE CANYON #11-12V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2021
FacilityID:260445LocationID:308043
County:LAS ANIMAS #071Location:NWSW 11 34S68W 6
Field:PURGATOIRE RIVER - #70830Elevation:8170 ft.
Basin:RATON BASIN  
Planned Location:1433FSL  648 FWLLat/Long: 37.095243 / -104.971672Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.095190 / -104.971650Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/11/2011
End Date: 7/11/2011
Reported: 4/16/2012
Prior to rule 205A.b.(2)(A)
Days to report: 280
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 5/1/2021             Measured TD: 1998 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 5/1/2021
Wellbore Permit
Permit #:20011194 Expiration Date:6/19/2002
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:3/29/2002
Spud Date:2/23/2002Spud Date Is:ACTUAL
Measured TD:1998 ft.Measured PB depth:1996 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CDL, SIL, CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 273 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 75, Top: 0 ft., Bottom: 273 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 1981 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 310, Top: 0 ft., Bottom: 1981 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1520 ft.NN
VERMEJO COAL1520 ft.1866 ft.NN
TRINIDAD1866 ft.1984 ft.NN
PIERRE1984 ft.2005 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 8/24/2011                 Interval Top: 1574 ft.    Interval Bottom: 1868 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:3/29/2002Choke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/11/2011
Treatment Summary:Acidized w/2,000 gals 15% HCl acid. Refrac'd w/53,632 gals 20# Delta 140 w/Sandwedge OS carrying 180,800# 16/30 Nebraska sd.
Formation Treatment
Treatment Date:3/29/2002
Treatment Summary:SEE SCANNED DOC# 1336301
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 0
CALC_BBLS_H2O 1
CALC_MCF_GAS 4
MCF_GAS 4
Perforation Data:
Interval Top:1574 ft.# Of Holes:152
Interval Bottom:1868 ft.Hole Size:0.51 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 5/1/2021                  Interval Top: 376 ft.    Interval Bottom: 1868 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:8/3/2011Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.875 in.Tubing Setting Depth:1902 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/15/2011Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 11
BTU_GAS 944
CALC_BBLS_H2O 11
CALC_MCF_GAS 55
MCF_GAS 55
TUBING_PRESS 1
Perforation Data:
Interval Top:376 ft.# Of Holes:248
Interval Bottom:1868 ft.Hole Size:0.42 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 8/24/2011                 Interval Top: 376 ft.    Interval Bottom: 693 ft.

 Completed Information for Formation RATON COAL
1st Production Date:8/3/2011Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/12/2011
Treatment Summary:Acidized w/2,100 gals 15% HCl acid. Frac'd w/106,395 gals 20# Delta 140 w/Sandwedge OS carrying 373,800# 16/30 Nebraska sd.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:376 ft.# Of Holes:96
Interval Bottom:693 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)22889
GOR
GOR DeterminationMCFE
Average BOE per Day10.824
Average MCFE per Day62.788

 Federal Financial Assurance  i 

 Tribal Well  i No