Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07436
Well Classification: CBM Status: PR - 7/8/2007
Well Name/No:APACHE CANYON #17-04V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/8/2007
FacilityID:260444LocationID:308042
County:LAS ANIMAS #071Location:NWNW 17 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8090 ft.
Basin:RATON BASIN  
Planned Location:643FNL  906 FWLLat/Long: 37.089753 / -104.917190Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.089710 / -104.917210Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 7/8/2007             Measured TD: 2525 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 7/8/2007
Wellbore Permit
Permit #:011193 Expiration Date:6/19/2002
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:9/13/2001
Spud Date:7/25/2001Spud Date Is:ACTUAL
Measured TD:2525 ft.Measured PB depth:2522 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CDL, SIL, CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 912 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 0 ft., Bottom: 912 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2503 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 305, Top: 1040 ft., Bottom: 2503 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 2503 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 130, Top: 0 ft., Bottom: 1040 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2023 ft.NN
VERMEJO COAL2023 ft.2387 ft.NN
TRINIDAD2387 ft.2545 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 9/25/2013                 Interval Top: 2081 ft.    Interval Bottom: 2350 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:9/7/2001Choke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/22/2007
Treatment Summary:2007 Corrected Data - New perfs 2082-2315 (32 new holes). Acidized w/1,250 gals 15% HCl acid. Frac'd w/57,852 gals 20# Delta 140 w/sandwedge OS carrying 150,037# 16/30 Brady sand. Pervious Verjemo data was correctly submitted on Form 5A dated 02/03/2003.
Formation Treatment
Treatment Date:9/13/2001
Treatment Summary:PERF 2333-2335, 2346-50 (24 HOLES), FRAC W/33,313 GALS FRAC FLD, 385,000 SCF N2, 29,500# 16/30 BRADY SD. PERF 2309-16 (28 HOLES), FRAC 2NS STG W/29,628 GALS FRAC FLD, 410,000 SCF N2, 547# 16/30 BRADY SD PERF 2150-46 (46 HOLES) FRAC 3RD STG W/22,416
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 4
BBLS_OIL 0
BTU_GAS 993
CALC_BBLS_H2O 4
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 4
CASING_PRESS 0
MCF_GAS 4
Perforation Data:
Interval Top:2081 ft.# Of Holes:120
Interval Bottom:2350 ft.Hole Size:4 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 7/8/2007                  Interval Top: 981 ft.    Interval Bottom: 2350 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:7/6/2007Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.875 in.Tubing Setting Depth:2359 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/8/2007Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 180
BTU_GAS 1002
CALC_BBLS_H2O 180
CASING_PRESS 10
GRAVITY_OIL 591
TUBING_PRESS 5
Perforation Data:
Interval Top:981 ft.# Of Holes:212
Interval Bottom:2350 ft.Hole Size:0.45 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 9/25/2013                 Interval Top: 981 ft.    Interval Bottom: 1522 ft.

 Completed Information for Formation RATON COAL
1st Production Date:7/6/2007Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/22/2007
Treatment Summary:Corrected Data - Acidized w/2,750 gals 15% HCl acid. Frac'd w/144,929 gals 20# Delta 140 w/sandwedge OS carrying 16,800# 16/30 and 435,002# 12/20 Brady sands.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 180
BTU_GAS 1002
CALC_BBLS_H2O 180
CASING_PRESS 10
GRAVITY_OIL 1
TUBING_PRESS 10
Perforation Data:
Interval Top:981 ft.# Of Holes:92
Interval Bottom:1522 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)25309
GOR
GOR DeterminationMCFE
Average BOE per Day11.961
Average MCFE per Day69.350

 Federal Financial Assurance  i 

 Tribal Well  i No