|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 6/24/2013 Measured TD: 2495 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 6/24/2013 | Wellbore Permit | | Permit #: | 20011167 | Expiration Date: | 6/17/2002 | Proposed Depth/Form: | 2495 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 10/20/2001 | Spud Date: | 8/7/2001 | Spud Date Is: | ACTUAL | Measured TD: | 2495 ft. | Measured PB depth: | 2457 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | COMP.DENSITY/NEUTRON, SINGLE INDUCTION | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 517 ft., Weight: 23 , Citings Type: ACTUAL | Cement: | Sacks: 145, Top: 0 ft., Bottom: 517 ft., Determination Method: | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2457 ft., Weight: 15.5 , Citings Type: ACTUAL | Cement: | Sacks: 385, Top: 0 ft., Bottom: 2457 ft., Determination Method: CALC | Formation | Interval Top | Log Bottom | Cored | DSTs | RATON COAL | 0 ft. | 2141 ft. | N | N | VERMEJO COAL | 2141 ft. | 2440 ft. | N | N | TRINIDAD | 2440 ft. | 2495 ft. | N | N |
Formation VRMJ Formation Classification: GW Status: CM - 6/21/2013 Interval Top: 2152 ft. Interval Bottom: 2410 ft. Completed Information for Formation VERMEJO COAL | 1st Production Date: | 10/24/2001 | Choke Size: | | Formation Name: | VERMEJO COAL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 10/20/2001 | Treatment Summary: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 180 | BBLS_OIL | 0 | CALC_BBLS_H2O | 180 | CALC_BBLS_OIL | 0 | CALC_MCF_GAS | 186 | CASING_PRESS | 36 | MCF_GAS | 186 |
| Perforation Data: | Interval Top: | 2152 ft. | # Of Holes: | 156 | Interval Bottom: | 2410 ft. | Hole Size: | 0.51 in. |
|
Formation RT-VJ Formation Classification: GW Status: PR - 6/24/2013 Interval Top: 785 ft. Interval Bottom: 2410 ft. Completed Information for Formation RATON-VERMEJO COALS | 1st Production Date: | 8/30/2005 | Choke Size: | | Formation Name: | RATON-VERMEJO COALS | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 6/24/2013 | Treatment End Date: | N/A | Treatment Summary: | Vermejo was completed in 2001. Raton was completed and 1st produced 05/20/2005. CIBP between Vermejo & Raton was drilled out amd commingled 08/30/2005. | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2411 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation RT-VJ. |
| Perforation Data: | Interval Top: | 785 ft. | # Of Holes: | 266 | Interval Bottom: | 2410 ft. | Hole Size: | |
|
Formation RTON Formation Classification: GW Status: CM - 6/21/2013 Interval Top: 785 ft. Interval Bottom: 2128 ft. Completed Information for Formation RATON COAL | 1st Production Date: | 5/20/2005 | Choke Size: | | Formation Name: | RATON COAL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 10/20/2001 | Treatment Summary: | ACIDIZED W/1500 GAL 15% HCI ACID. FRAC'D W/207,613 GAL 20# DELTA 140 W/SANDWEDGE NT CARRYING 136,800# 16/30 & 321,800# 12/20 BRADY SAND. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 80 | BBLS_OIL | 0 | CALC_BBLS_H2O | 80 | CALC_BBLS_OIL | 0 | CALC_MCF_GAS | 44 | CASING_PRESS | 10 | MCF_GAS | 44 | TUBING_PRESS | 10 |
| Perforation Data: | Interval Top: | 785 ft. | # Of Holes: | 110 | Interval Bottom: | 2128 ft. | Hole Size: | 0.4 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 29110 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 13.749 |
Average MCFE per Day | 79.745 |
Federal Financial Assurance | i | |
|
|