Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07427
Well Classification: CBM Status: PR - 8/8/2010
Well Name/No:HILL RANCH #04-11V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/8/2010
FacilityID:260405LocationID:308040
County:LAS ANIMAS #071Location:NESW 4 35S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8185 ft.
Basin:RATON BASIN  
Planned Location:2051FSL  2575 FWLLat/Long: 37.024645 / -104.893339Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.024670 / -104.893300Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 8/8/2010             Measured TD: 2635 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 8/8/2010
Wellbore Permit
Permit #:20011166 Expiration Date:6/17/2002
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:10/21/2001
Spud Date:7/31/2001Spud Date Is:ACTUAL
Measured TD:2635 ft.Measured PB depth:2586 ft.
True Vertical TD:True Vertical PB depth:
Log Types:COMP.DENSITY/NEUTRON, SINGLE INDUCTION, CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 637 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 175, Top: 0 ft., Bottom: 637 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2587 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 357, Top: 384 ft., Bottom: 2587 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2197 ft.NN
VERMEJO COAL2197 ft.2488 ft.NN
TRINIDAD2488 ft.2635 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 10/25/2001                Interval Top: 2211 ft.    Interval Bottom: 2455 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:10/21/2001Choke Size: 
Formation Name:VERMEJO COALCommingled:
Production Method:PUMP
Open Hole Completion:
Formation Treatment
Treatment Date:10/21/2001
Treatment Summary:2452' - 2455' 34,100# 16/30 SAND & 309 BLS FLUID. // 2397' - 2400' 27,500# 16/30 SAND & 174 BBLS FLUID. // 2211' - 2222' 25,200# 16/30 SAND & 200 BBLS FLUID.
Tubing Size:2.875 in.Tubing Setting Depth:2491 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/25/2001Test Method:PUMP
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 236
BBLS_OIL 0
CALC_BBLS_H2O 236
CALC_BBLS_OIL 0
CALC_MCF_GAS 114
CASING_PRESS 43
MCF_GAS 114
Perforation Data:
Interval Top:2211 ft.# Of Holes:88
Interval Bottom:2455 ft.Hole Size:0.51 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 8/8/2010                  Interval Top: 646 ft.    Interval Bottom: 2455 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:8/7/2010Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.875 in.Tubing Setting Depth:2508 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/8/2010Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 91
BTU_GAS 1001
CALC_BBLS_H2O 91
CALC_MCF_GAS 205
CASING_PRESS 22
MCF_GAS 205
TUBING_PRESS 5
Perforation Data:
Interval Top:646 ft.# Of Holes:144
Interval Bottom:2455 ft.Hole Size:0.51 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 2/18/2011                 Interval Top: 646 ft.    Interval Bottom: 1512 ft.

 Completed Information for Formation RATON COAL
1st Production Date:8/7/2010Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/23/2010
Treatment Summary:Acidized w/2,800 gals 15% HCl acid. Frac'd w/137,599 gals 20# Delta 140 w/Sandwedge OS carrying 22,211# 16/30 Brady sd & 266,216# 12/20 Brady sd.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:646 ft.# Of Holes:56
Interval Bottom:1512 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
July 2024 - June 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)21553
GOR
GOR DeterminationMCFE
Average BOE per Day10.172
Average MCFE per Day59.016

 Federal Financial Assurance  i 

 Tribal Well  i No