Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07427
Well Classification: CBM Status: PR - 8/8/2010
Well Name/No:HILL RANCH #04-11V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/8/2010
FacilityID:260405LocationID:308040
County:LAS ANIMAS #071Location:NESW 4 35S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8185 ft.
Basin:RATON BASIN  
Planned Location:2051FSL  2575 FWLLat/Long: 37.024645 / -104.893339Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.024670 / -104.893300Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 8/8/2010             Measured TD: 2635 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 8/8/2010
Wellbore Permit
Permit #:20011166 Expiration Date:6/17/2002
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:10/21/2001
Spud Date:7/31/2001Spud Date Is:ACTUAL
Measured TD:2635 ft.Measured PB depth:2586 ft.
True Vertical TD:True Vertical PB depth:
Log Types:COMP.DENSITY/NEUTRON, SINGLE INDUCTION, CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 637 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 175, Top: 0 ft., Bottom: 637 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2587 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 357, Top: 384 ft., Bottom: 2587 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2197 ft.NN
VERMEJO COAL2197 ft.2488 ft.NN
TRINIDAD2488 ft.2635 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 10/25/2001                Interval Top: 2211 ft.    Interval Bottom: 2455 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:10/21/2001Choke Size: 
Formation Name:VERMEJO COALCommingled:
Production Method:PUMP
Open Hole Completion:
Formation Treatment
Treatment Date:10/21/2001
Treatment Summary:2452' - 2455' 34,100# 16/30 SAND & 309 BLS FLUID. // 2397' - 2400' 27,500# 16/30 SAND & 174 BBLS FLUID. // 2211' - 2222' 25,200# 16/30 SAND & 200 BBLS FLUID.
Tubing Size:2.875 in.Tubing Setting Depth:2491 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/25/2001Test Method:PUMP
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 236
BBLS_OIL 0
CALC_BBLS_H2O 236
CALC_BBLS_OIL 0
CALC_MCF_GAS 114
CASING_PRESS 43
MCF_GAS 114
Perforation Data:
Interval Top:2211 ft.# Of Holes:88
Interval Bottom:2455 ft.Hole Size:0.51 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 8/8/2010                  Interval Top: 646 ft.    Interval Bottom: 2455 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:8/7/2010Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.875 in.Tubing Setting Depth:2508 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/8/2010Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 91
BTU_GAS 1001
CALC_BBLS_H2O 91
CALC_MCF_GAS 205
CASING_PRESS 22
MCF_GAS 205
TUBING_PRESS 5
Perforation Data:
Interval Top:646 ft.# Of Holes:144
Interval Bottom:2455 ft.Hole Size:0.51 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 2/18/2011                 Interval Top: 646 ft.    Interval Bottom: 1512 ft.

 Completed Information for Formation RATON COAL
1st Production Date:8/7/2010Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/23/2010
Treatment Summary:Acidized w/2,800 gals 15% HCl acid. Frac'd w/137,599 gals 20# Delta 140 w/Sandwedge OS carrying 22,211# 16/30 Brady sd & 266,216# 12/20 Brady sd.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:646 ft.# Of Holes:56
Interval Bottom:1512 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)20378
GOR
GOR DeterminationMCFE
Average BOE per Day9.620
Average MCFE per Day55.820

 Federal Financial Assurance  i 

 Tribal Well  i No