|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 7/22/2010 Measured TD: 2545 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 7/22/2010 | | Wellbore Permit | | | Permit #: | 20011146 | Expiration Date: | 6/14/2002 | | Proposed Depth/Form: | 2800 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 10/12/2001 | | Spud Date: | 8/3/2001 | Spud Date Is: | ACTUAL | | Measured TD: | 2545 ft. | Measured PB depth: | | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | COMP.DENSITY/NEUTRON, SINGLE INDUCTION | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 212 ft., Weight: 23 , Citings Type: ACTUAL | | Cement: | Sacks: 60, Top: 0 ft., Bottom: 212 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2505 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 360, Top: 0 ft., Bottom: 2505 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | 2090 ft. | N | N | | VERMEJO COAL | 2090 ft. | 2380 ft. | N | N | | TRINIDAD | 2380 ft. | 2545 ft. | N | N |
Formation VRMJ Formation Classification: GW Status: CM - 10/15/2001 Interval Top: 2099 ft. Interval Bottom: 2364 ft.| Completed Information for Formation VERMEJO COAL | | 1st Production Date: | 10/12/2001 | Choke Size: | | | Formation Name: | VERMEJO COAL | Commingled: | | | Production Method: | PUMP | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/15/2001 | | Treatment Summary: | 64,000# 16/30 SAND & 414 BBLS FLUID. // 16,300# 16/30 SAND & 116 BBLS FLUID. // 15,900# 16/30 SAND & 108 BBLS FLUID. // 15,500# 16/30 SAND & 143 BBLS FLUID. // 16,200# 16/30 SAND & 119 BBLS FLUID. // 24,300# 16/30 SAND & 167 BBLS FLUID |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2393 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/15/2001 | Test Method: | PUMP | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 170 | | BBLS_OIL | 0 | | CALC_BBLS_H2O | 170 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 112 | | CASING_PRESS | 31 | | MCF_GAS | 112 |
| | Perforation Data: | | Interval Top: | 2099 ft. | # Of Holes: | 112 | | Interval Bottom: | 2364 ft. | Hole Size: | 0.51 in. |
|
Formation RT-VJ Formation Classification: GW Status: PR - 7/22/2010 Interval Top: 725 ft. Interval Bottom: 2364 ft.| Completed Information for Formation RATON-VERMEJO COALS | | 1st Production Date: | 7/21/2010 | Choke Size: | | | Formation Name: | RATON-VERMEJO COALS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2391 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/22/2010 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 108 | | BTU_GAS | 1003 | | CALC_BBLS_H2O | 108 | | CALC_MCF_GAS | 96 | | CASING_PRESS | 2 | | MCF_GAS | 96 | | TUBING_PRESS | 3 |
| | Perforation Data: | | Interval Top: | 725 ft. | # Of Holes: | 180 | | Interval Bottom: | 2364 ft. | Hole Size: | 0.51 in. |
|
Formation RTON Formation Classification: GW Status: CM - 2/18/2011 Interval Top: 725 ft. Interval Bottom: 1592 ft.| Completed Information for Formation RATON COAL | | 1st Production Date: | 7/21/2010 | Choke Size: | | | Formation Name: | RATON COAL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/13/2010 | | Treatment Summary: | Acidized w/3,400 gals 15% HCl acid. Frac'd w/184,815 gals 20# Delta 140 w/Sandwedge OS carrying 27,685# 16/30 Brady sd & 384,048# 12/20 Brady sd (18,200# 12/20 coated w/Expedite 155).
|
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation RTON. |
| | Perforation Data: | | Interval Top: | 725 ft. | # Of Holes: | 68 | | Interval Bottom: | 1592 ft. | Hole Size: | 0.45 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 33048 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 15.608 |
| Average MCFE per Day | 90.539 |
| Federal Financial Assurance | i | |
|
|